Ack Receipt of 850311 Ltr Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-445/84-32 & 50-446/84-11.Corrective Actions for Items 1 & 2 Will Be Reviewed W/Comanche Peak Response Team Program Plan
ML20132G865
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 07/30/1985
From: Hunter D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Spence M
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
References
NUDOCS 8508050167
Download: ML20132G865 (2)


Text

_ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ ____

a .

,

JUL 3 01985 In Reply Refer To:

Dockets: 50-445/84-32 50-446/84-11 Texas Utilities Electric Company ATTN: M. D. Spence, President, TUGC0 Skyway Tower 400 North Olive Street Lock Box 81 Dallas, Texas 75201 Gentlemen:

Thank you for your letter of March 11, 1985, in response to our letter and Notice of Violation dated February 15, 1985. We have reviewed your reply and find it addresses the concerns raised in item 3 of our Notice of Violation.

We will review your corrective actions for items 1 and 2 as part of our examination of tne Comanche Peak Response Team Program Plan. We will review the implementation of your corrective actions during a future inspection to determine that full compliance has been achieved and will be maintained.

Sincerely,

,,ortsnal Sippd @

D.R guNTER, Dorwin R. Hunter, Chief Reactor Project Branch 2 cc:

Texas Utilities Electric Company ATTN: B. R. Clements, Vice President, Nuclear Skyway Tower 400 North Olive Street Lock Box 81 Dallas, Texas 75201 Texas Utilities Electric Company kogsoggg 45 [

ATTN: J. W. Beck, Manager, G PDR /

Licensing Skyway Tower '[/

400 North Olive Street Lock Box 81 Dallas. Texas 75201 '

l RPB2/PSB $ RPB2 DRS&P NR ..

DMHunnicuft:gb DRHun er RPDeryise VN 03W G/jp/85 AA\ /85 &/gV85 6/1/85

'

,

- - - _ _. _

_

p__ '

l ., :

. -

!.

t, ,

.

-bec to DMB (IE01)

"' -

_ .bcc distrib. by RIV: .

  • RPB2 * MIS System
  • RRI-0PS. *RSTS Operator

~*RRI-CONST *EP&RPB

  • D. Hunnicutt, TaskForce' R. Denise, D/DRSP

. *R. Bangart, D/DRSS .R. Martin, RA V.1Noonan, NRR Juanita Ellis, Pres.- CASE S._Treby', ELD Renea Hicks, A/ Atty General. EP Div.-TX

  • RIV File TEXAS DEPT. OF HEALTH RESOURCES 4s,. -
  • D. Weiss, LFMB (AR-2015)

.-, ,

~. .

  • w/766 '

, l

.-

  • t-

'

8 r  %

! ,

, <-

[ .:~ n

"

[

,

.

%

r. .. . i. . .

L>

I je

'

' .:

m .

,. w

. i, L, + ,

-

E r

_

.

.*. ..

TEXAS UTILITIES GENERATING COMPANY MKY WAY TOWEH . 400 NORTil s sLIV E MTH EET, L.H. Mt * DALLAM. TEXAM 7520R

..o ".'.So! h**i".L".L" .~. March 11, 1985 TXX-4435 Dorwin R. Hunter, Chief Reactor Project Branch 2 U.S. Nuclear Regulatory Commission Office of Inspection & Enforcement 611 Ryan Plaza Drive, Suite 1000 Docket Nos.: 50-445 Arlington, TX 76011 50-446 T W '/

COMANCHE PEAK STEAM ELECTRIC STATION RESPONSE TO NRC NOTICE OF VIOLATION INSPECTION REPORT 84-32 FILE NO.: 10130

Dear Mr. Hunter:

We have reviewed your letter dated February 15, 1985 regarding the inspection conducted under the Resident Inspection Program by H.S. Phillips of activities authorized by NRC Construction Permit CPPR-125 for Comanche Peak Units 1 and 2.

Our review of the findings cited in the Notice of Violation under Appendix A to your letter indicates that two of the findings are siiailiar in nature to those identified by the NRC Technical Review Team (TRT). In accordance with one of your proposed response options, we have elected to respond to findings 1 and 2 of the Notice of Violation as part of the Comanche Peak Response Team Action Plan.

We are providing a response to Finding No. 3 in Appendix A of your letter. To aid in the understanding of our response, we have repeated the finding from the Notice of Violation followed by a summary of our corrective actions. The documentation of specific corrective actions is available at the TUGCo QA Dallas office for your Inspector's review.

If you have any questions, please advise.

Very truly yours,

  • W@3DMW  % /uhNY BRC:t1g fl j 'ui N I 4E j

. Clements Attachment dc4 0Y0

- - - - - - - -

9v omt. u.o O d W u' -/-UW yd, 3 f

. -. . . . - . . . - . . . . - . - - ..- - ~__-..~ .-.- -..--. . . - _ _ _ . . .

,_

I I

r.. .

,_

t

.

i i

cc: NRC Region IV (0 + 1 copy) '

f

^ >

Director, Inspection & Enforcement (15 copies)

U.S. Nuclear Regulatory Commission

~ Washington, DC 20555

'

,

Mr. V.S..Noonan i

< t l

t

!.

I t

4 h

,

t .

!~ ):

t.

l

,

I i i

1

.

i i

,

a Y'

W i

!

I

'

+

i.

m

d

+

,

l'.-

!

. JJ.-.___.._,.,..-..,_,.-,.......___,__....__..,. . . _ , , , _ , . . , , , _ . . _ . - _ _ _ _ , . , , . . - . _ _ . . . . . _ . - , _ . . _ , _ . _ _ _ _ _

. .

  • ,

,

'

TXX-4435 3/11/85 Page 2 ATTACHMENT FAILURE TO PROPERLY CERTIFY A VENDOR COMPLIANCE INSPECTOR Failure to Properly Certify a Vendor Compliance Inspector Criterion V of 10 CFR 50, Appendix B, states in part, " Activities affecting quality shall be prescribed by documented instructions, procedures, or drawings, of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures, or drawings."

TUGC0 Procedure DQP-VC-4, Revision 6, dated January 5, 1984, requires that Level II inspectors (Corporate QA) shall attend and satisfactorily complete nonde-structive testing courses including eddy current testing.

Contrary to the above, one of six inspector's files had no documentation to show that the inspector had attended and completed an eddy current testing course.

Subsequent, discussions revealed that he had been certified without meeting this requirement. The vendor compliance supervisor stated that this inspection skill is not needed since there is no present vendor work activity which would require this skill; therefore, this procedure was revised and the requirement omitted during this inspection.

This is a Severity Level V Violation. (Supplement II) (445/8432-05; 446/8411-05)

Corrective Steps which have been taken and the results achieved:

The certification of the inspector without the required eight (8) hour training was an oversight. A review of all six (6) Vendor Compliance Inspector's work reflected no instance where eddy current testing was involved. The procedure revision discussed below was processed to reflect our actual inspection needs.

Corrective steps which have been taken to avoid further violations:

As there is no present nor planned vendor work activity which would require this skill, TUGCo Procedure DQP-VC-4 has been revised by deleting the requirement for an eight (8) hour training course in eddy current testing. Should the need for a familiarity with eddy current testing arise, the Vendor Compliance Supervisor will take the necessary action to either train or obtain a qualified inspector.

Date when full compliance will be achieved:

Procedure DQP-VC-4 was revised August 27, 1984.