UNITED STATES NUCLEAR REGULATORY COMMISSION rch 5, 2012

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR COMANCHE PEAK NUCLEAR POWER PLANT UNITS 1 AND 2 (REPORT 05000445/2012001 AND 05000446/2012001)

Dear Mr. Flores:

On February 14, 2012, the NRC completed its end-of-cycle performance review of Comanche Peak Nuclear Power Plant Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2011, through December 31, 2011. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRCs assessment of your performance in the Security Cornerstone and its security-related inspection plan.

The NRC determined that overall, Comanche Peak Nuclear Power Plant Units 1 and 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Comanche Peak Nuclear Power Plant Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRC=s Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green)

safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The NRC identified a cross-cutting theme in the resources component of the human performance cross-cutting area. Specifically, the NRC identified four green findings in the resources component of the human performance cross-cutting area for failure to provide complete and accurate procedures H.2(c). The NRC determined that a substantive cross-cutting issue (SCCI) does not exist because your improvement initiatives and proposed corrective actions appear to provide sufficient scope to address the theme. The NRC will continue to monitor your staffs effort and progress in addressing the theme until the theme criteria are no longer met.

The enclosed inspection plan lists the inspections scheduled through June 30, 2013. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 817-200-1148 with any questions you have regarding this letter.

Sincerely,

/RA/

Wayne C. Walker Chief, Reactor Projects Branch A Division of Reactor Projects Docket Nos: 05000445, 05000446 License Nos: NPF-87, NPF-89 Enclosure: Comanche Peak Nuclear Power Plant Inspection/Activity Plan cc w/Enclosure: Distribution via ListServe cc w/Enclosure Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Art.Howell@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

DRP Deputy Director (Troy.Pruett@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Thomas.Blount@nrc.gov)

Senior Resident Inspector (John.Kramer@nrc.gov)

Resident Inspector (Brian.Tindell@nrc.gov)

Senior Project Engineer (David.Proulx@nrc.gov)

Project Engineer (Jason.Dykert@nrc.gov)

Branch Chief, DRP/A (Wayne.Walker@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Regional State Liaison Officer (Bill.Maier@nrc.gov)

RA Secretary (Lisa.Quayle@nrc.gov)

DRA Secretary (Anita.Tannenbaum@nrc.gov)

Branch Chief, DRS/EB1 (Thomas.Farnholtz@nrc.gov)

Branch Chief, DRS/EB2 (Geoff.Miller@nrc.gov)

Branch Chief, DRS/PSB1 (Michael.Hay@nrc.gov)

Branch Chief, DRS/PSB2 (Greg.Werner@nrc.gov)

Branch Chief, DRS/OB (Mark.Haire@nrc.gov)

Acting Branch Chief, DRS/TSB (Ryan.Alexander@nrc.gov)

OEDO RIV Coordinator (Lydia.Chang@nrc.gov)

Director, DIRS, NRR (Fred.Brown@nrc.gov)

Deputy Director, DIRS, NRR (John.Lubinski@nrc.gov)

Director, DORL, NRR (Joseph Giitter@nrc.gov)

Deputy Director, DORL, NRR (Robert.Nelson@nrc.gov)

Chief, PLB IV, DORL, NRR (Michael.Markley@nrc.gov)

NRR Project Manager (Balwant.Singal@nrc.gov)

RidsNrrDirslpab Resource@nrc.gov ROPreports.Resource@nrc.gov Congressional Affairs Officer (Jenny.Weil@nrc.gov)

File located: R: _Reactors\EOC 2011\CP EOC Letter 2011.docx SUNSI Review Yes No ADAMS Yes No Reviewer Initials WW Publicly Avail Yes No Sensitive Yes No Sens. Type Initials WW A:DRP/A signature D:DRS D:DRP WCWalker AVegel KKennedy

/RA/ T.Blount for /RA/

2/28/12 2/28/12 2/29/12

Page 1 of 1 Comanche Peak 02/27/2012 14:28:50 Inspection / Activity Plan Report 22 04/01/2012 - 06/30/2013 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EXAM - INITIAL OPERATOR EXAM 5 1 05/14/2012 05/18/2012 X02484 INITIAL EXAM - UNIT 1 - CP (04/2012)

2 05/14/2012 05/18/2012 X02485 INITIAL EXAM - UNIT 2 - CP (04/2012)

1 06/11/2012 06/23/2012 X02484 INITIAL EXAM - UNIT 1 - CP (04/2012)

2 06/11/2012 06/23/2012 X02485 INITIAL EXAM - UNIT 2 - CP (04/2012)

EB1-17T - 50.59 & PERM PLANT MODS 3 1, 2 03/26/2012 04/06/2012 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 1, 2 03/26/2012 04/06/2012 IP 7111117T-chng/tst change/test/evaluations 1, 2 03/26/2012 04/06/2012 IP 7111117T-evals evaluations 1, 2 03/26/2012 04/06/2012 IP 7111117T-permmodspermanent mods EP-1 - BIENNIAL EP PROGRAM INSPECTION 1 1, 2 07/16/2012 07/20/2012 IP 7111402 Alert and Notification System Testing 1, 2 07/16/2012 07/20/2012 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 07/16/2012 07/20/2012 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 07/16/2012 07/20/2012 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 07/16/2012 07/20/2012 IP 71151-EP01 Drill/Exercise Performance 1, 2 07/16/2012 07/20/2012 IP 71151-EP02 ERO Drill Participation 1, 2 07/16/2012 07/20/2012 IP 71151-EP03 Alert & Notification System RS12 - RADIATION SAFETY 2 1, 2 10/15/2012 10/19/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 10/15/2012 10/19/2012 IP 71124.02 Occupational ALARA Planning and Controls 1 10/15/2012 10/19/2012 IP 71151-OR01 Occupational Exposure Control Effectiveness 1 10/15/2012 10/19/2012 IP 71151-PR01 RETS/ODCM Radiological Effluent RS5678 - RADIATION SAFETY TEAM INSPECTION 4 1, 2 12/03/2012 12/07/2012 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 12/03/2012 12/07/2012 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 12/03/2012 12/07/2012 IP 71124.07 Radiological Environmental Monitoring Program 1, 2 12/03/2012 12/07/2012 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation EB1-21 - COMPONENT DESIGN BASIS INSPECTION 6 1, 2 05/20/2013 06/21/2013 IP 7111121 Component Design Bases Inspection This report does not include INPO and OUTAGE activities.