MONTHYEARML24232A2262024-08-19019 August 2024 Information Request, Security IR 2024404 ML24232A2412024-08-19019 August 2024 Information Request, ISFSI Security IR 2024401 IR 05000445/20240052024-08-15015 August 2024 Updated Inspection Plan for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2024005 and 05000446/2024005) ML24205A2162024-07-23023 July 2024 September 2024 Emergency Preparedness Program Inspection - Request for Information ML24185A1382024-07-0202 July 2024 Inservice Inspection Request for Information IR 05000445/20230062024-02-28028 February 2024 Annual Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 Reports 05000445/2023006 and 05000446/2023006 IR 05000445/20230052023-08-23023 August 2023 Updated Inspection Plan for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2023005 and 05000446/2023005)- Mid Cycle Letter 2023 ML23068A3782023-03-0909 March 2023 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000445/2023011 and 05000446/2023011) and Request for Information IR 05000445/20220062023-03-0101 March 2023 Annual Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2022006 and 05000446/2022006) IR 05000445/20220052022-08-22022 August 2022 Updated Inspection Plan for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2022005 and 05000446/2022005) IR 05000445/20224012022-06-28028 June 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000445/2022401; 05000446/2022401 ML22124A3042022-05-0505 May 2022 Notification of NRC Triennial Heat Exchanger/Sink Performance Inspection (05000445/2022003 and 05000446/2022003) and Request for Information IR 05000445/20210062022-03-0202 March 2022 Annual Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2021006 and 05000446/2021006) ML21253A2332021-09-0909 September 2021 Request for Information: Comanche Peak Nuclear Power Plant, Units 1 and 2 (05000445 and 05000446); Occupation Radiation Safety (71124.01, 71124.02, 7511) ML21245A3072021-09-0202 September 2021 Request for Information ML21245A307 IR 05000445/20210052021-09-0101 September 2021 Mid-Cycle Inspection Plan Transmittal Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2021005 and 05000446/2021005) ML21176A1292021-06-25025 June 2021 CPNPP FFD Inspection Doc Request 2021 ML21103A3982021-04-13013 April 2021 CP Security Inspection Information Request 2021403 ML21027A4322021-01-27027 January 2021 Information Request, Security IR 2021401 ML20309A3602020-11-0404 November 2020 Notification of NRC Design Bases Assurance Inspection (Teams) (Inspection Report 05000445/2021011 and 05000446/2021011) and Initial Request for Information IR 05000445/20200052020-09-0101 September 2020 Updated Inspection Plan for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2020005 and 05000446/2020005) ML20139A1452020-05-18018 May 2020 Notification of NRC Design Bases Assurance Inspection (Programs) (05000445/2020010 and 05000446/2020010) and Initial Request for Information ML20055E1052020-03-0303 March 2020 CP2019006 Annual Assessment Letter ML20045E3512020-02-13013 February 2020 Information Request February 13, 2020 Notification of Inspection and Request for Information Comanche Peak Unit 2 NRC Inspection Report 05000446/2020002 IR 05000445/20190052019-08-30030 August 2019 Updated Inspection Plan for Comanche Peak, Units 1 and 2, Reports 05000445/2019005 and 05000446/2019005 IR 05000445/20180062019-03-0404 March 2019 Annual Assessment Letter for Comanche Peak, Units 1 and 2 (Report 05000445/2018006 and 05000446/2018006) ML19043A9442019-02-20020 February 2019 2019 CP Brq RFI Letter IR 05000445/20180052018-08-31031 August 2018 Updated Inspection Plan for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2018005 and 05000446/2018005) IR 05000445/20170062018-03-0101 March 2018 Annual Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2017006 and 05000446/2017006) IR 05000445/20170052017-08-28028 August 2017 Updated Inspection Plan for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2017005 and 05000446/2017005) IR 05000445/20160062017-03-0101 March 2017 Annual Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2016006 and 05000446/2016006) ML16302A1002016-10-27027 October 2016 Notification of Inspection (NRC Inspection Report 05000445/2017002 and 05000446/2017002) and Request for Information IR 05000445/20160052016-09-12012 September 2016 Errata for Mid-Cycle Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2016005 and 05000446/2016005) IR 05000445/20164012016-08-31031 August 2016 Non-Public Security Inspection Plan for Comanche Peak Nuclear Power Plant (NRC Physical Security Inspection Report Numbers 05000445/2016401 and 05000446/2016401) ML16239A2522016-08-31031 August 2016 Mid-Cycle Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2016005 and 05000446/2016005) IR 05000445/20150062016-03-0202 March 2016 Annual Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2015006 and 05000446/2015006) IR 05000445/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2015005 and 05000446/2015005) IR 05000445/20154012015-09-0101 September 2015 Non-Public Security Inspection Plan for Comanche Peak Nuclear Power Plant (NRC Physical Security Inspection Report Numbers 05000445/2015401 and 05000446/2015401) IR 05000445/20144022014-09-0202 September 2014 Non-Public Security Inspection Plan for Comanche Peak Nuclear Power Plant (NRC Physical Security Inspection Report Numbers 05000445/2014402 and 05000446/2014402) IR 05000445/20140062014-09-0202 September 2014 Mid-Cycle Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2014006 and 05000446/2014006) IR 05000445/20130012014-03-0404 March 2014 IR 05000445-13-001 & 05000446-13-001, 02/12/2014, Comanche Peak, Units 1 & 2, Annual Assessment Inspection Plan ML13282A5002013-10-0909 October 2013 Notification of NRC Triennial Fire Protection Baseline Inspection (NRC Inspection Report 05000445-14-008 and 05000446-14-008) and Request for Information IR 05000445/20130062013-09-0303 September 2013 (Report 05000445/2013006 and 05000446/2013006) IR 05000445/20128012013-03-0404 March 2013 Annual Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2012801 and 05000446/2012801) ML13060A4352013-03-0101 March 2013 Notification of NRC Component Design Bases Inspection IR 05000445-13-007 and 05000446-13-007, and Initial Request for Information IR 05000445/20120062012-09-0404 September 2012 Mid-Cycle Letter for Comanche Peak Nuclear Power Plant Units 1 and 2 (Reports 05000445/2012006 and 05000446/2012006) IR 05000445/20120012012-03-0505 March 2012 Annual Assessment Letter for Comanche Peak Nuclear Power Plant Units 1 and 2 (Report 05000445/2012001 and 05000446/2012001) ML1124306442011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan - Comanche Peak Nuclear Power Plant - Units 1 and 2 CP-201101031, Transmittal of Unit 1 Inservice Inspection Program Plan, Revision 0 (Unit 1: ASME Code XI 1998 Edition, 1999 and 2000 Addenda, Interval Start - August 13, 2010, Third Interval)2011-08-0202 August 2011 Transmittal of Unit 1 Inservice Inspection Program Plan, Revision 0 (Unit 1: ASME Code XI 1998 Edition, 1999 and 2000 Addenda, Interval Start - August 13, 2010, Third Interval) CP-201101030, Transmittal of Unit 1 Inservice Inspection Program Plan, Revision 6, (Unit 1: ASME Code XI 1998 Edition, 1999 and 2000 Addenda, Interval Start - August 13, 2000, Second Interval)2011-08-0202 August 2011 Transmittal of Unit 1 Inservice Inspection Program Plan, Revision 6, (Unit 1: ASME Code XI 1998 Edition, 1999 and 2000 Addenda, Interval Start - August 13, 2000, Second Interval) 2024-08-19
[Table view] Category:Letter
MONTHYEARIR 05000445/20240032024-10-30030 October 2024 Integrated Inspection Report 05000445/2024003 and 05000446/2024003 IR 05000445/20244042024-10-23023 October 2024 Security Baseline Inspection Report 05000445/2024404 and 05000446/2024404 (Public) IR 07200074/20244012024-10-10010 October 2024 Independent Spent Fuel Storage Installation Security Inspection Report 07200074/2024401 Public 05000445/LER-2024-002-01, Condition Prohibited by Technical Specifications Due to Inoperable Remote Shutdown System Functions2024-10-0303 October 2024 Condition Prohibited by Technical Specifications Due to Inoperable Remote Shutdown System Functions 05000446/LER-2024-001-01, Unit Two, Recurring Reactor Scrams Associated with Main Feedwater System Modifications2024-09-30030 September 2024 Unit Two, Recurring Reactor Scrams Associated with Main Feedwater System Modifications CP-202400335, License Amendment Request to Adopt TSTF-51, TSTF-471, and TSTF-571-T to Eliminate Use of the Term Core Alterations and Revise Requirements During Handling of Irradiated Fuel2024-09-12012 September 2024 License Amendment Request to Adopt TSTF-51, TSTF-471, and TSTF-571-T to Eliminate Use of the Term Core Alterations and Revise Requirements During Handling of Irradiated Fuel ML24031A6322024-09-11011 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4), Final Safety Analysis Report Update Schedule (EPID L-2023-LLE-0023) - Letter ML24243A0152024-09-0303 September 2024 – Notification of Comprehensive Engineering Team Inspection (05000445/2025012 and 05000446/2025012) and Request for Information ML24194A1332024-08-28028 August 2024 Issuance of Amendment Nos. 190 and 190, Respectively, Revision to Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown ML24228A2252024-08-22022 August 2024 Relief to Use Later Code Edition for Inservice Inspection Program ML24179A0772024-08-20020 August 2024 Issuance of Amendment Nos. 189 and 189, Respectively, Extension of Allowed Outage Time for an Inoperable Emergency Diesel Generator ML24232A2262024-08-19019 August 2024 Information Request, Security IR 2024404 ML24232A2412024-08-19019 August 2024 Information Request, ISFSI Security IR 2024401 CP-202400294, (CPNPP) - Response to RAI for Exemption Request from 10 CPR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 (CPNPP) - Response to RAI for Exemption Request from 10 CPR 50.71(e)(4) Final Safety Analysis Update Schedule IR 05000445/20240052024-08-15015 August 2024 Updated Inspection Plan for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2024005 and 05000446/2024005) CP-202400319, (CPNPP) - Revision to CPNPP Letter to the NRC, Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality2024-08-13013 August 2024 (CPNPP) - Revision to CPNPP Letter to the NRC, Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality ML24177A2692024-08-0707 August 2024 Issuance of Amendment Nos. 188 and 188, Respectively, Revision to Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program CP-202400315, (Cpnpp), Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality2024-08-0505 August 2024 (Cpnpp), Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality IR 05000445/20240022024-07-31031 July 2024 Units 1 and 2 - Integrated Inspection Report 05000445/2024002 and 05000446/2024002,and Independent Spent Fuel Storage Installation Inspection Report 07200074/2024001 IR 05000445/20244032024-07-16016 July 2024 Security Baseline Inspection Report 05000445/2024403 and 05000446/2024403 (Full Report) ML24187A0372024-07-15015 July 2024 Withdrawal of Requested Licensing Action Exemption from Select Requirements of 10 CFR Part 55, Operators Licenses ML24192A1862024-07-10010 July 2024 Notification of Inspection (NRC Inspection Report 05000445/2024003 and 05000446/2024003) and Request for Information ML24185A1382024-07-0202 July 2024 Inservice Inspection Request for Information CP-202400253, (Cpnpp), Units 1 & 2 Inservice Testing Plan for Pumps & Valves Third Interval, Revision 52024-06-26026 June 2024 (Cpnpp), Units 1 & 2 Inservice Testing Plan for Pumps & Valves Third Interval, Revision 5 IR 05000445/20244012024-06-26026 June 2024 MC&A Program Inspection Report 05000445-2024401 and 05000446-2024401 Public-Final CP-202400235, (Cpnpp), Units 1 & 2, Inservice Testing Plan for Pumps & Valves Fourth Interval, Revision 02024-06-18018 June 2024 (Cpnpp), Units 1 & 2, Inservice Testing Plan for Pumps & Valves Fourth Interval, Revision 0 IR 05000445/20240122024-06-17017 June 2024 Design Basis Assurance Inspection (Programs) Inspection Report 05000445/2024012 and 05000446/2024012 ML24120A3632024-06-10010 June 2024 Issuance of Amendment Nos. 187 and 187, Respectively Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Plants 05000445/LER-1924-002, (Cpnpp), Unit 1, Condition Prohibited by Technical Specifications Due to Inoperable Remote Shutdown System Functions2024-06-0303 June 2024 (Cpnpp), Unit 1, Condition Prohibited by Technical Specifications Due to Inoperable Remote Shutdown System Functions CP-202400205, (Cpnpp), Units 1and 2, Submittal of the Snubber Inservice Program Plan for the Fourth Ten Year Interval2024-05-30030 May 2024 (Cpnpp), Units 1and 2, Submittal of the Snubber Inservice Program Plan for the Fourth Ten Year Interval CP-202400175, (CPNPP) - Supplement to License Amendment Request to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator2024-05-16016 May 2024 (CPNPP) - Supplement to License Amendment Request to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator 05000446/LER-2024-001, (Cpnpp), Unit 2, Two Recurring Reactor Scrams Associated with Main Feedwater System Modifications2024-05-13013 May 2024 (Cpnpp), Unit 2, Two Recurring Reactor Scrams Associated with Main Feedwater System Modifications 05000445/LER-2024-001, Re Potential Loss of Safety Function Due to Inoperability of Both Trains of Uninterruptible Power Supply Heating, Ventilation & Air Conditioning2024-05-0606 May 2024 Re Potential Loss of Safety Function Due to Inoperability of Both Trains of Uninterruptible Power Supply Heating, Ventilation & Air Conditioning ML24120A3042024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Sylestine, R, Alabama-Coushatta Tribe of Texas ML24120A2902024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Bunch, J, United Keetoowah Band of Cherokee Indians ML24120A2912024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Cooper, D, Apache Tribe of Oklahoma ML24120A3032024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-SpottedBird, L, Kiowa Indian Tribe ML24107B1012024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Cernek, J, Coushatta Tribe of Louisiana ML24120A3022024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Pierite, M, Tunica-Biloxi Tribe of Louisiana ML24120A2922024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Dotson, Delaware Nation ML24120A2952024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Johnson, L.J., Seminole Nation of Oklahoma CP-202400153, (Cpnpp), Registration of Dry Spent Fuel Storage Canisters2024-04-29029 April 2024 (Cpnpp), Registration of Dry Spent Fuel Storage Canisters ML24120A3052024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Woommavovah, M, Comanche Nation ML24120A3072024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Yargee, W, Alabama-Quassarte Tribal Town ML24120A2932024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Garza, Jr, Juan, Kickapoo Traditional Tribe of Texas ML24120A3002024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Morrow, R K, Thlopthlocco Tribal Town ML24120A2942024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Gonzalez, B, Caddo Nation ML24120A3012024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Parton, T, Wichita and Affiliated Tribes ML24120A2972024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Martin, R, Tonkawa Tribe of Oklahoma ML24120A2962024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Kaskaske, D, Kickapoo Tribe of Oklahoma 2024-09-30
[Table view] |
Text
rch 2, 2005
SUBJECT:
ANNUAL ASSESSMENT LETTER - COMANCHE PEAK STEAM ELECTRIC STATION (REPORT 05000445/2005001 AND 05000446/2005001)
Dear Mr. Blevins:
On February 1, 2005, the NRC staff completed its end-of-cycle plant performance assessment of the Comanche Peak Steam Electric Station. The end-of-cycle review for Comanche Peak involved the participation of the reactor technical divisions in evaluating performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2004. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility so that you will have an opportunity to prepare for these inspections and to inform us of any planned inspections that may conflict with your plant activities.
This performance review and enclosed inspection plan do not include physical protection information. A separate end-of-cycle performance review letter designated and marked as
"Exempt from Public Disclosure in Accordance with 10 CFR 2.390" will include the physical protection review and resultant inspection plan.
Overall, Comanche Peak operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process baseline inspections at your facility through September 30, 2006. We also plan on conducting several Temporary Instruction inspections as detailed in the enclosed inspection plan.
While plant performance for the most recent quarter was within the Licensee Response Column of the NRCs Action Matrix, there was a safety significant inspection finding during the first quarter of the assessment cycle. A White finding was identified involving a failure to identify and correct a flaw in a steam generator tube on Unit 1. This finding was in the Barrier Integrity Cornerstone and resulted in Comanche Peak Unit 1 being in the Regulatory Response Column for the first quarter of 2004. A supplemental inspection was conducted in March 2004. This
TXU Energy -2-inspection found that your organization had performed a comprehensive evaluation of the causes and extent of the performance deficiency and had implemented effective corrective actions. As a result, this finding has been closed.
The enclosed inspection plan details the inspections, less those related to physical protection scheduled through September 30, 2006. The inspection plan is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the midcycle review meeting.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact William D. Johnson at (817) 860-8148 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Arthur T. Howell III, Director Division of Reactor Projects Dockets: 50-445 50-446 Licenses: NPF-87 NPF-89 Enclosure:
Comanche Peak Inspection/Activity Plan cc w/enclosure: Terry Parks, Chief Inspector Fred W. Madden Texas Department of Licensing Regulatory Affairs Manager and Regulation TXU Generation Company LP Boiler Program P.O. Box 1002 P.O. Box 12157 Glen Rose, TX 76043 Austin, TX 78711 George L. Edgar, Esq. The Honorable Walter Maynard Morgan Lewis Somervell County Judge 1111 Pennsylvania Avenue, NW P.O. Box 851 Washington, DC 20004 Glen Rose, TX 76043 Richard A. Ratliff, Chief Bureau of Radiation Control
TXU Energy -3-Texas Department of Health Federal Regional Center 1100 West 49th Street 800 North Loop 288 Austin, TX 78756-3189 Denton, TX 76209-3698 Environmental and Natural Julie Parsley, Commissioner Resources Policy Director Public Utility Commission Office of the Governor William B. Travis Bldg.
P.O. Box 12428 P.O. Box 13326 Austin, TX 78711-3189 1701 North Congress Avenue Austin, TX 78711-3326 Brian Almon Public Utility Commission William Dub Taylor William B. Travis Building State Energy Conservation Office P.O. Box 13326 111 E 17th Street, Room 1114 1701 North Congress Avenue Austin, TX 78711 Austin, TX 78711-3326 Roger Mulder Susan M. Jablonski State Energy Conservation Office Office of Permitting, Remediation and P.O. Box 13528 Registration Austin, TX 78774 Texas Commission on Environmental Quality Gene Mayo MC-122 Sheriff, Hood County P.O. Box 13087 400 N. Gordon Street Austin, TX 78711-3087 Granbury, TX 76048 Greg Doyle Jack Colley, State Coordinator Sheriff, Somervell County Division of Emergency Management 750 E. Gibbs Blvd. Texas Department of Public Safety Glen Rose, TX 76043 Box 4087, 5805 North Lamar Blvd.
Austin, TX 78773-0220 The Honorable Pam Miller Mayor of Glen Rose Institute of Nuclear Power Operations (INPO)
P.O. Box 1949 Records Center Glen Rose, TX 76043 700 Galleria Parkway SE, Suite 100 Atlanta, GA 30339 The Honorable Andy Rash Hood County Judge 100 E. Pearl Street Granbury, TX 76048 David Southern Mayor of Granbury P.O. Box 969 Granbury, TX 76048 Gary Jones, Regional Director FEMA Region VI Dept. of Homeland Security
TXU Energy -4-Electronic distribution by RIV:
Regional Administrator (BSM1)
DRP Director (ATH)
DRS Director (DDC)
DRS Deputy Director (MRS)
Senior Resident Inspector (DBA)
Branch Chief, DRP/A (WDJ)
Senior Project Engineer, DRP/A (TRF)
Team Leader, DRP/TSS (RLN1)
RITS Coordinator (KEG)
RidsNrrDipmIipb V. Dricks, PAO (VLD)
W. Maier, RSLO (WAM)
C. Gordon (CJG)
DRS Branch Chiefs (LJS, MPS1, ATG, JAC)
S. Richards, Chief, NRR/DIPM/IIPB (SAR)
M. Case, Deputy Dir. for Inspection and Programs (MJC)
B. Sheron, Associate Dir. for Project Licensing and Technical Analysis (BWS)
B. Wetzel, ActingChief, ROPMS, OEDO (BAW)
H. Berkow, Director, LPD4, NRR/DLPM (HNB)
A. Howe, Chief, PDIV-1A, NRR/DLPM (AGH1)
M. Thadani, NRR Project Manager (MCT)
SISP Review Completed: _wdj__ ADAMS: / Yes G No Initials: __wdj____
/ Publicly Available G Non-Publicly Available G Sensitive / Non-Sensitive S:\DRP\DRPDIR\EOC 04\Assessment Letters\CP.wpd RIV:C:DRP/A D:DRS D:DRP WDJohnson;mjs DDChamberlain ATHowell
/RA/ /RA/ /RA/
2/23/05 2/24/05 2/25/05 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax
Page 1 of 2 Comanche Peak 03/01/2005 08:33:14 Inspection / Activity Plan Report 22 03/04/2005 - 09/30/2006 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type OB-INIT - OB - INITIAL EXAMINATION 3 1 X02269 COMANCHE PEAK UNIT 1 (11/04) INITIAL EXAM 02/28/2005 03/04/2005 Not Applicable 2 X02270 COMANCHE PEAK UNIT 2 (11/04) INITIAL 02/28/2005 03/04/2005 Not Applicable 1 X02269 COMANCHE PEAK UNIT 1 (11/04) INITIAL EXAM 03/28/2005 04/01/2005 Not Applicable 2 X02270 COMANCHE PEAK UNIT 2 (11/04) INITIAL 03/28/2005 04/01/2005 Not Applicable PEB-07B - HX PERFORMANCE 2 1, 2 IP 7111107B Heat Sink Performance 03/07/2005 03/11/2005 Baseline Inspections OB-RQ - REQUAL INSPECTION 3 1, 2 IP 7111111B Licensed Operator Requalification Program 03/14/2005 03/18/2005 Baseline Inspections TI 150 - RPV HEAD AND VESSEL HEAD PEN NOZZLES 1 2 IP 2515/150 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC Bulletin 2002-02 03/21/2005 04/22/2005 Safety Issues EB08P - ISI U2 - VESS VOL (TI 150/152) AS REQ 1 2 IP 7111108P Inservice Inspection Activities - PWR 03/28/2005 04/01/2005 Baseline Inspections 2 IP 7111108P Inservice Inspection Activities - PWR 04/11/2005 04/15/2005 Baseline Inspections TI 160 - TI 2515/160 PRSZR PENETRATION NOZZLE INS 1 2 IP 2515/160 Pzr Pene Nozzles & Stm Space Piping Connections in U.S. PWRs [NRC Bulletin 2004-01] 03/26/2005 04/30/2005 Safety Issues ACRSA - ACCESS CONTROL TO RAD SIGNIFICANT AREAS 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 04/11/2005 04/15/2005 Baseline Inspections PEB-52 - CP PIR INSPECTION 7 1, 2 IP 71152B Identification and Resolution of Problems 07/11/2005 07/15/2005 Baseline Inspections 1, 2 IP 71152B Identification and Resolution of Problems 07/25/2005 07/29/2005 Baseline Inspections ALARA2 - ALARA PLANNING AND CONTROLS 1 1, 2 IP 7112102 ALARA Planning and Controls 07/11/2005 07/15/2005 Baseline Inspections OB-EP EX - EMERG PREPAREDNESS EXERCISE 4 1, 2 IP 7111401 Exercise Evaluation 08/29/2005 09/02/2005 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 08/29/2005 09/02/2005 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 08/29/2005 09/02/2005 Baseline Inspections TI 160 - TI 2515/160 PRSZR PENETRATION NOZZLE INS 1 1 IP 2515/160 Pzr Pene Nozzles & Stm Space Piping Connections in U.S. PWRs [NRC Bulletin 2004-01] 10/08/2005 11/17/2005 Safety Issues EB08P - ISI U1 - VESS VOL (TI 150/152) AS REQ 1 1 IP 7111108P Inservice Inspection Activities - PWR 10/17/2005 10/21/2005 Baseline Inspections 1 IP 7111108P Inservice Inspection Activities - PWR 10/24/2005 10/28/2005 Baseline Inspections ALARA1 - ALARA PLANNING AND CONTROLS 1 1, 2 IP 7112102 ALARA Planning and Controls 01/23/2006 01/27/2006 Baseline Inspections This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 2 Comanche Peak 03/01/2005 08:33:14 Inspection / Activity Plan Report 22 03/04/2005 - 09/30/2006 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PEB - MAINTENANCE RULE BIENNIAL 1 1, 2 IP 7111112B Maintenance Effectiveness 03/06/2006 03/10/2006 Baseline Inspections OB-EP1 - EMERG PREP PROGRAM 1 1, 2 IP 7111402 Alert and Notification System Testing 07/31/2006 08/04/2006 Baseline Inspections 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 07/31/2006 08/04/2006 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 07/31/2006 08/04/2006 Baseline Inspections 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 07/31/2006 08/04/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 07/31/2006 08/04/2006 Baseline Inspections RP TEAM - RP SAFETY TEAM 3 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 09/11/2006 09/15/2006 Baseline Inspections 1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 09/11/2006 09/15/2006 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 09/11/2006 09/15/2006 Baseline Inspections 1, 2 IP 7112203 Radiological Environmental Monitoring Program 09/11/2006 09/15/2006 Baseline Inspections This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.