MATERIAL 1RANSVW1EDMTH HERE CONTAINS 2 790 INFORMATioN JUL 0 81986 Docket Nos. 50-400, 70-2997 License No. SNM-1939 Carolina Power and Light Company ATTN: Mr. E. E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. O. Box 1551 Raleigh, NC 27602 Gentlemen:
SUBJECT: NRC INSPECTION REPORT NOS. 50-400/86-51 AND 70-2997/86-51 This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by J. W. Bates and S. Q. Ninh on June 17-20, 1986. The inspection included a review of activities authorized for your Shearon Harris facility. At the conclusion of the inspection, the findings were discussed with those members of your staff identified in the enclosed inspection repor Areas examined during the inspection are identified in the report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observation of activities in progres Within the scope of the inspection, no violations or deviations were identifie In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and security measures are exempt from public disclosure; therefore, the enclosure to this letter, with the exception of the report cover page which presents a nonexempt summary, will not be placed in the NRC Public Document Roo Should you have any questions concerning this letter, please contact u
 
Sincerely, David M. Verrelli, Chief Reactor Projects Branch 2 Division of Reactor Projects Enclosure:
NRC Inspection Report cc w/ encl: (See page 2)
  '
l 8607140257 860708    i PDR ADOCK 05000400    \ (
o  PDR {gr n,,q3,y, x n,,n (0
 
  .--.  . - - . . . -
*
.
CONTAINS 2390 H INFonMATroNMATERf JUL 0 81988 Docket Nos. 50-400, 70-2997 License No. SNM-1939 Carolina Power and Light Company ATTN: Mr. E. E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. O. Box 1551 Raleigh, NC 27602 Gentlemen:
SUBJECT: NRC INSPECTION REPORT NOS. 50-400/86-51 AND 70-2997/86-51 This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by J. W. Bates and S. Q. Ninh on June 17-20, 1986. The inspection included a review of activities authorized for your Shearon Harris facility. At the conclusion of the inspection, the findings were discussed with those members of your staff identified in the enclosed inspection repor Areas examined during the inspection are identified in the report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observation of activities in progres Within the scope of the inspection, no violations or deviations were identifie ..
In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and security measures are exempt from public disclosure; therefore, the enclosure to this letter, with the exception of the report cover page which presents a nonexempt summary, will not be placed in the NRC Public Document Roo Should you have any questions concerning this letter, please contact u
 
Sincerely, David M. Verre111, Chief Reactor Projects Branch 2 Division of Reactor Projects Enclosure:
NRC Inspection Report cc w/ encl: (See page 2)
_
u m arlenry.,
    -
m,
    . .m
      \
 
. _  ~. .. ,  ,
. MATERf/L TRNtSMITTED HEREWGH
. CONTA NS 2.790 INFoRMATION
  .
  .
Carolina Power and Light Company JUL 0 81986 cc w/ encl:
R. A. Watson, Vice President Harris Nuclear Project D. L. Tibbetts, Director of Regulatory  -
Compliance J. L. Willis, Plant General Manager
, bec w/ encl:
IE File
*
NMSS/SGPL NRR/DL/SSPB Document Control Desk, 016 bec w/ Inspection Summary:
State'of North Carolina i
i i
n
 
  .
J f
i
        ,
i RII  RII  RII  RI .
RII SN m JB  EM  e , rr P hr DVe lli 7/ 3 /86  7/ 3 /86 7/3 /86  7/q/86 7 /86 7/
i MATERIAL TRA*CWTTED Htptw;1H CcNTAsNs : r w inrogug7:en
,_-= _ _ _ , . , . , _ _ _ , . . . . . _ . . __.,_ _ .. . _  ._.
}}
}}

Latest revision as of 23:12, 1 January 2021

Forwards Insp Repts 50-400/86-51 & 70-2997/86-51 on 860617- 20.No Violations or Deviations Noted.Repts Withheld (Ref 10CFR2.790 & 73.21)
ML20202D979
Person / Time
Site: Harris, 07002997  Duke Energy icon.png
Issue date: 07/08/1986
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML19292F575 List:
References
NUDOCS 8607140257
Download: ML20202D979 (3)


Text

.

  • ,

MATERIAL 1RANSVW1EDMTH HERE CONTAINS 2 790 INFORMATioN JUL 0 81986 Docket Nos. 50-400, 70-2997 License No. SNM-1939 Carolina Power and Light Company ATTN: Mr. E. E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. O. Box 1551 Raleigh, NC 27602 Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-400/86-51 AND 70-2997/86-51 This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by J. W. Bates and S. Q. Ninh on June 17-20, 1986. The inspection included a review of activities authorized for your Shearon Harris facility. At the conclusion of the inspection, the findings were discussed with those members of your staff identified in the enclosed inspection repor Areas examined during the inspection are identified in the report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observation of activities in progres Within the scope of the inspection, no violations or deviations were identifie In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and security measures are exempt from public disclosure; therefore, the enclosure to this letter, with the exception of the report cover page which presents a nonexempt summary, will not be placed in the NRC Public Document Roo Should you have any questions concerning this letter, please contact u

Sincerely, David M. Verrelli, Chief Reactor Projects Branch 2 Division of Reactor Projects Enclosure:

NRC Inspection Report cc w/ encl: (See page 2)

'

l 8607140257 860708 i PDR ADOCK 05000400 \ (

o PDR {gr n,,q3,y, x n,,n (0

.--. . - - . . . -

.

CONTAINS 2390 H INFonMATroNMATERf JUL 0 81988 Docket Nos. 50-400, 70-2997 License No. SNM-1939 Carolina Power and Light Company ATTN: Mr. E. E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. O. Box 1551 Raleigh, NC 27602 Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-400/86-51 AND 70-2997/86-51 This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by J. W. Bates and S. Q. Ninh on June 17-20, 1986. The inspection included a review of activities authorized for your Shearon Harris facility. At the conclusion of the inspection, the findings were discussed with those members of your staff identified in the enclosed inspection repor Areas examined during the inspection are identified in the report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observation of activities in progres Within the scope of the inspection, no violations or deviations were identifie ..

In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and security measures are exempt from public disclosure; therefore, the enclosure to this letter, with the exception of the report cover page which presents a nonexempt summary, will not be placed in the NRC Public Document Roo Should you have any questions concerning this letter, please contact u

Sincerely, David M. Verre111, Chief Reactor Projects Branch 2 Division of Reactor Projects Enclosure:

NRC Inspection Report cc w/ encl: (See page 2)

_

u m arlenry.,

-

m,

. .m

\

. _ ~. .. , ,

. MATERf/L TRNtSMITTED HEREWGH

. CONTA NS 2.790 INFoRMATION

.

.

Carolina Power and Light Company JUL 0 81986 cc w/ encl:

R. A. Watson, Vice President Harris Nuclear Project D. L. Tibbetts, Director of Regulatory -

Compliance J. L. Willis, Plant General Manager

, bec w/ encl:

IE File

NMSS/SGPL NRR/DL/SSPB Document Control Desk, 016 bec w/ Inspection Summary:

State'of North Carolina i

i i

n

.

J f

i

,

i RII RII RII RI .

RII SN m JB EM e , rr P hr DVe lli 7/ 3 /86 7/ 3 /86 7/3 /86 7/q/86 7 /86 7/

i MATERIAL TRA*CWTTED Htptw;1H CcNTAsNs : r w inrogug7:en

,_-= _ _ _ , . , . , _ _ _ , . . . . . _ . . __.,_ _ .. . _ ._.