ML20210D850
| ML20210D850 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 01/27/1987 |
| From: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Utley E CAROLINA POWER & LIGHT CO. |
| References | |
| NUDOCS 8702100176 | |
| Download: ML20210D850 (1) | |
See also: IR 05000400/1986066
Text
f
JAN 2 71967
Carolina Power and Light Company
ATTN: Mr. E. E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P. O. Box 1551
Raleigh, NC 27602
Gentlemen:
SUBJECT: REPORT NO. 50-400/86-66
Thank you for your response of December 19, 1986, to our Notice of Violation
issued on November 21, 1986, concerning activities conducted at your Shearon
Harris facility under NRC Construction Permit No. CPPR-158.
We have evaluated
your response and found that it meets the requirements of 10 CFR 2.201. A followup
inspection was conducted on November 17-21, 1986, to review the corrective
actions taken to resolve the separation problems at Harris.
Your response and
the findings documented in Inspection Report No. 50-400/86-86 substantiate that
you have completed all corrective actions.
Therefore, we consider the
separation issue closed.
We appreciate your cooperation in this matter.
Sincerely,
W
l
'
J. Nelson Grace
Regional Administrator
cc:
R. A. Watson, Vice President
Harris Nuclear Project
D. L. Tibbitts, Director of
Regulatory Compliance
J. L. Willis, Plant General Manager
bec: C. Barth, OGC
J. Moore, 0GC
NRC Resident Inspector
Document Control Desk
y
State of North Carolina
i
J
. . ,
I
RII
RI[
RI
/
RII
RI
y
,
)
NMerriweather:cdg
TECo lon
RHeYdt
ibson
r dr c son
DVer elli
01//g/87
01/jt/87
01/j{/87
01/1 /87
/20/87
01/ 2f/87
RII/
h
RII
'#
RII
-
^
a ke
G3e
s
y
01/7//87
gg
0 /JG/87
01/04/87
-
'
8702100176 870127
ADOCK 05000400
@
F;DF@
-
2"Eo/l