ML20207T549

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-400/87-02 on 870107-09,12-16 & 20-29. No Violations Noted
ML20207T549
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 02/20/1987
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML20207T550 List:
References
NUDOCS 8703240121
Download: ML20207T549 (2)


See also: IR 05000400/1987002

Text

+>- <.

-

FEB 2-01987 i

,,

..-

.

l

. Docket No. 50-400

License No. NPF-63

-C olina Power and Light Company

TTN: Mr. E. E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction-

P. O. Box 1551

Raleigh, NC 27602

Gentlemen:

SURJECT: NRC INSPECTION REPORT N0. 50-400/87-02

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

P. T. Burnett on January 7-9, 12-16,.20-29, 1987. The inspection included a

review of activities authorized for your Shearon Harris facility. At the

conclusion of the inspection, the findings were discussed with those members of

your staff identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

David M. Verrelli, Chief

Reactor Projects Branch 1

Division of Reactor Projects

Enclosure:

NRC Inspection Report

cc: (Seepage 2)

8703240121 870220

gDR ADOCK 05000400

PDR

! I

JEcl :

C ** ' FEB 2 01987

~

. . .

barolinaPower.andLightCompany 2

cc w/ encl:

A.A.' Watson,VicePresident

Harris Nuclear Project

p.L.Tibbitts,DirectorofRegulatory

Compliance

. Gf L. Willis, ~ Plant General Manager

bec w/ encl:

W. Baer, IE-

  1. Barth, 0GC

Moore. 0GC

. Wegner, IE

pCResidentInspector

Document Control Desk

State of North Carolina

I RII RI P,I

JMa is:es ks tt FJ AHerdt {e Fre on

02/11/87 02/M/87 02//7/87 02/g/87 02/fj/87 ,

.i

i