SAFEGUARDS INFORMATION
'
J AN 211987
,
Docket No. 50-400
License No. NPF-53
Carolina Power and Light Company
ATTN: Mr. E. E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P. O. Box 1551
Raleigh, NC 27602
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NO. 50-400/86-95
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
Orysia M. Masnyk on December 30-31, 1986.
The inspection included a review of
activities authorized for your Shearon Harris facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
The violation described in the enclosed Inspection Report is currently under NRC
revie.w.
Accordingly, no Notice of Violation is being issued at this time, and no
response to this letter is required.
However, please be advised that the number
and characterization of violations described in the enclosed Inspection Report
may change as a result of further NRC review.
You will be advised by separate
correspondence of the results of our deliberations on this matter.
In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and
security measures are exempt from public disclosure; therefore, the enclosures
to this letter, with the exception of the report cover page which presents a
nonexempt summary, will not be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
Original Signed by
Luis A. Reyes
l
i
Luis A. Reyes, Acting Director
l
Division of Reactor Projects
ENCLOSURE CGNTAINS
,
l
Enclosure:
(See page 2)
sArscUARD31:fFOPN A TIO
l
UPON SEPARATION 7!:1a
8702030155 870121
O
l
ADOCK 05000400
G
- -*
gl
SAFEGUARDS INFORMATION
Carolina Power and Light Company
2
Enclosure:
NRC Inspection Report
(Safeguards Information)
cc w/ encl:
R. A. Watson, Vice President
Harris Nuclear Project
D. L. Tibbitts, Director of Regulatory
Compliance
J. L. Willis, Plant General Manager
bcc w/ encl:
IE File
NMSS/SGPL
NRR/DL/SSPB
bec w/ Inspection Summary:
NRC Resident Inspector
Document Control Desk, 016
State of North Carolina
/
~/
OMasnyk.er
g45tohr
ire
WCline
y/87
01pp87
/If/87
01
01/ /87
,
,
.
ElicLOSU
pt1\\T10H
/
y
Tg f redrickson
DVerrelli
GJen
s
SAyscuyf ggAT10N .C,{ '
,
.
0 /2(/87
01/ /87
01/ /87
UPoS g gEccitTRO' '
,
,
SAFEGUARDS INFORMATlC. '
.