ML20213A194

From kanterella
Jump to navigation Jump to search
Forwards Partially Withheld Insp Rept 50-400/86-95 on 861230-31 (Ref 10CFR2.790(d) & 73.21).Violation Under Review & No Notice of Violation Issued.Results of Review Will Be Forwarded Separately
ML20213A194
Person / Time
Site: Harris 
Issue date: 01/21/1987
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML20213A197 List:
References
NUDOCS 8702030155
Download: ML20213A194 (2)


See also: IR 05000400/1986095

Text

SAFEGUARDS INFORMATION

'

J AN 211987

,

Docket No. 50-400

License No. NPF-53

Carolina Power and Light Company

ATTN: Mr. E. E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. O. Box 1551

Raleigh, NC 27602

Gentlemen:

SUBJECT:

NRC INSPECTION REPORT NO. 50-400/86-95

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

Orysia M. Masnyk on December 30-31, 1986.

The inspection included a review of

activities authorized for your Shearon Harris facility.

At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

The violation described in the enclosed Inspection Report is currently under NRC

revie.w.

Accordingly, no Notice of Violation is being issued at this time, and no

response to this letter is required.

However, please be advised that the number

and characterization of violations described in the enclosed Inspection Report

may change as a result of further NRC review.

You will be advised by separate

correspondence of the results of our deliberations on this matter.

In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and

security measures are exempt from public disclosure; therefore, the enclosures

to this letter, with the exception of the report cover page which presents a

nonexempt summary, will not be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

Original Signed by

Luis A. Reyes

l

i

Luis A. Reyes, Acting Director

l

Division of Reactor Projects

ENCLOSURE CGNTAINS

,

l

Enclosure:

(See page 2)

sArscUARD31:fFOPN A TIO

l

UPON SEPARATION 7!:1a

8702030155 870121

O

l

PDR

ADOCK 05000400

G

PDR

  • -*

gl

SAFEGUARDS INFORMATION

Carolina Power and Light Company

2

Enclosure:

NRC Inspection Report

(Safeguards Information)

cc w/ encl:

R. A. Watson, Vice President

Harris Nuclear Project

D. L. Tibbitts, Director of Regulatory

Compliance

J. L. Willis, Plant General Manager

bcc w/ encl:

IE File

NMSS/SGPL

NRR/DL/SSPB

bec w/ Inspection Summary:

NRC Resident Inspector

Document Control Desk, 016

State of North Carolina

/

~/

OMasnyk.er

g45tohr

ire

WCline

y/87

01pp87

/If/87

01

01/ /87

,

,

.

ElicLOSU

pt1\\T10H

/

y

Tg f redrickson

DVerrelli

GJen

s

SAyscuyf ggAT10N .C,{ '

,

.

0 /2(/87

01/ /87

01/ /87

UPoS g gEccitTRO' '

,

,

SAFEGUARDS INFORMATlC. '

.