|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML18017A9241999-10-15015 October 1999 Provides Supplemental Info Re 981223 Lar,Placing Plant Spent Fuel Pools 'C' & 'D' in Service.Info Provided Does Not Change Util Initial Determination That Proposed License Amend Represents No Significant Hazards Consideration ML18017A9141999-10-12012 October 1999 Forwards Addl Info Re Second 10-year ISI Program Plan Relief Requests,As Requested During 990923 Telcon ML18017A9131999-10-0606 October 1999 Provides Notification That Three SROs Licensed at Shnpp Have Been Reassigned from Position for Which Util Previously Certified Need for SRO License.Name,Docket Number & License Number for Subject Sros,Encl.Encl Withheld ML18017A8911999-09-30030 September 1999 Submits Comment on Encl 2 to 990617 Memo Titled Summary of Meeting with Nuclear Energy Inst. Encl 2 Was Titled Draft Technical Study of Spent Fuel Pool Accidents for Decommissioning Plants. Rept Which Provides Info Encl Also ML20216G3501999-09-29029 September 1999 Confirms Conversations Re NRC Staff Voluntary Response to Orange County Discovery Requests.Staff Will Voluntarily Answer Discovery Requests & Will Not Waive Any Objection or Privilege Under NRC Regulations.Related Correspondence ML20212M1081999-09-29029 September 1999 Confirms Intent to Meet with Utils on 991025 in Atlanta,Ga to Discuss Pilot Plants,Shearon Harris & Sequoyah Any Observations & Lessons Learned & Recommendations Re Implementation of Pilot Program ML20212J0741999-09-29029 September 1999 Refers to Proposed License Amend for Harris NPP Which Would Allow Licensee to Activate Two of Plant Spent Fuel Pools.Serves Copy of Orange County Second Set of Document Requests to NRC Staff,Dtd 990929.Related Correspondence ML18017A8941999-09-29029 September 1999 Forwards Response to NRC 990414 RAI Re GL 95-07, Pressure- Locking & Thermal-Binding of SR Power-Operated Gate Valves. ML18017A8881999-09-27027 September 1999 Submits Info Re Estimated Effect of Changes or Errors in ECCS Evaluation Models or in Application of Models,Per 10CFR50.46(a)(3)(ii) ML18017A8861999-09-21021 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations. ML18017A8821999-09-14014 September 1999 Provides Notification That RO Licensed on Harris Plant No Longer Meets Requirements of 10CFR50.21,effective 990826. Name,Docket Number & License Number for Individual Provided in Encl.Encl Withheld,Per 10CFR2.790(a)(6) ML18017A8651999-09-0808 September 1999 Requests Relief from Section XI,IWA-5242(a) Requirement for HNP Class 2 Bolted Connections in Borated Sys.Compliance with Requirement Would Result in Unusual Difficulty Without Compensating Increase in Level of Quality & Safety ML18017A8581999-09-0303 September 1999 Provides Response to NRC 990805 RAI Re Amend Request to Increase Fuel Storage Capacity ML18017A8551999-09-0101 September 1999 Forwards Marked Up Copy of Approved FSAR Section 17.3 with Applicable Duplicated TS Requirements,As Committed to in 990602 Application for Rev to TS ML18017A8541999-08-20020 August 1999 Submits Closure Info for Rev 1,Suppl 1 to GL 92-01, Reactor Vessel Structural Integrity. Identified Discrepancies from Review of NRC Rvid Provided HNP-99-134, Forwards Rev 11 to Physical Security & Safeguards Contingency Plan,Iaw 10CFR50.54(p)(2) & 10CFR50.4(b)(4). Description of Changes Is Provided as Encl 2 to Ltr.Rev Withheld,Per 10CFR73.211999-08-18018 August 1999 Forwards Rev 11 to Physical Security & Safeguards Contingency Plan,Iaw 10CFR50.54(p)(2) & 10CFR50.4(b)(4). Description of Changes Is Provided as Encl 2 to Ltr.Rev Withheld,Per 10CFR73.21 ML18017A8351999-08-10010 August 1999 Corrects Statement Made in 980923 Ltr,By Clarifying That Operation of Inner & Outer Pal Doors Can Be Operated by Control Panels Located Inside & Outside Containment ML18016B0531999-08-0606 August 1999 Forwards Exercise Scenario with Controller Info & Simulation Data for Harris Nuclear Plant Emergency Preparedness Exercise Scheduled for 990921.Without Encl ML18016B0461999-08-0404 August 1999 Forwards LER 99-006-01 Describing Condition Which Resulted in Exceeding TS Requirements for CIVs & TS 4.0.4 for Generic Requirements for Surveillance Testing.Rev Includes Results of Investigation Into Failure to Recognize TS Requirements ML18016B0391999-07-30030 July 1999 Forwards Rev 35 to PLP-201, Emergency Plan. Rev Replaces All Pages of Previous Rev with Exception of EAL Flow Path, Side 1 & 2 & Annex H,Operations Map & Aperature Card. Changes Made by Rev,Listed ML18016B0421999-07-30030 July 1999 Informs That in Ltr Dtd 950330 CP&L Committed to Complete Assessment of Severe Accident Mgt Capabilities & Make Any Identified Enhancements by 981231.Actions Were Completed in July 1998 ML18016B0221999-07-26026 July 1999 Informs That CP&L Proposes to Provide Response to NRC 990414 RAI Re GL 95-07, Pressure-Locking & Thermal-Binding of SR Power-Operated Gate Valves, by 990930 ML18016B0171999-07-16016 July 1999 Forwards Corrected Pages to Annual Radioactive Effluent Release Rept, for 1998 for HNP ML18016B0051999-07-0101 July 1999 Informs of Scheduled Emergency Preparedness Exercise for Shnpp on 990921,per Requirements of 10CFR50,App E.List of 26 Objectives Selected for Evaluation During Exercise,Encl. Without Encl ML20212H7741999-06-23023 June 1999 Responds to Re Petition Filed by Orange County Board of Commissioners Re Proposed Expansion of Sf Storage Capacity at Shearon Harris Npp.Public Meeting Will Be Held at Later Date.With Certificate of Svc.Served on 990624 ML18016A9871999-06-14014 June 1999 Forwards Response to NRC 990429 RAI Re License Amend Request to Place Spent Fuel Pools C & D in Service,Dtd 981223.Info Does Not Change Initial Determination That Proposed License Amend Represents No Significant Hazards Consideration ML18016A9831999-06-10010 June 1999 Submits Notification That Reactor Operator Licensed at HNP Has Terminated Employment with Cp&L.Reactor Operator Info Encl.Effective 990528,individuals License Is No Longer Required & CP&L Requests That License Be Terminated ML20212H7521999-06-0404 June 1999 Encourages NRC to Schedule Open Public Forum Which Would Allow Local Citizens to Express Concerns Re Proposed Expansion of high-level Radwaste Storage Capacity at Shearon Harris Npp.With Certificate of Svc.Served on 990624 ML18016A9721999-05-28028 May 1999 Responds to 990309 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. ML18016B0011999-05-26026 May 1999 Forwards Ltr Received from Hj Jaffe Expressing Concern Re Cpl Proposal to NRC on Dec of 1998 to Make Harris Nuclear Plant Largest Storage Area for High Level Nuclear Waste in Nation ML18016A9631999-05-25025 May 1999 Forwards Periodic Update to FSAR for Hnp.Amend 49 Is Current Through 981128 (End of RFO 8).Some Changes & Analysis Completed After 981128 Have Also Been Included in Amend ML20206R2511999-05-19019 May 1999 Responds to Addressed to Chairman Jackson Requesting That NRC Grant Standing to Orange County Board of Commissioners in Shearon Harris Proceeding Currently Before Board.With Certificate of Svc.Served on 990519 ML20206Q5281999-05-17017 May 1999 Responds to 990304 Request for Two Rail Routes to Be Used for Transport of Spent Fuel from Brunswick Steam Electric Plant,Southport,Nc & Hb Robinson Steam Electric Plant, Hartsville,Sc to Shearon Harris Npp,Near New Hill,Sc ML18016A9511999-05-13013 May 1999 Submits Info Re Estimated Effect of Change to ECCS Evaluation Model,As Required by 10CFR50.46 ML18016A9601999-05-11011 May 1999 Forwards Resolution Adopted by Carrboro Board of Aldermen at 990504 Meeting.Resolution Expresses Town Concern Re Util Plans to Double high-level Nuclear Waste Storage at Shnpp ML18016A9481999-05-0606 May 1999 Forwards NRC Form 396, Certification of Medical Examination by Facility Licensee, for Senior Reactor Operator Licensed to Operate Hnp.Individuals Info Is Proprietary & Is Being Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20206R2611999-05-0505 May 1999 Requests That NRC Grant Standing to Intervention Sought by Orange County Board of Commissioners Re Proposal by CP&L to Expand Storage of Hlrw at Shnpp.With Certificate of Svc. Served on 990519 ML18016A9451999-05-0404 May 1999 Provides Proprietary Notification That One SRO Has Been Reassigned from Position for Which Util Certified Need for SRO License & Another SRO Has Terminated Employment with Util.Proprietary Info Withheld,Per 10CFR2.790(a)(6) ML18016A9441999-05-0404 May 1999 Notifies NRC of Util Completion of Actions Re GL 96-01, Testing of Safety-Related Logic Circuits at Plant ML18016A9351999-04-30030 April 1999 Forwards Info Requested in 990324 RAI as Suppl to 981223 Application for Amend to License NPF-63 for Alternative Plan for Spent Fuel Pool Cooling & Cleanup Sys Piping ML18016A9311999-04-30030 April 1999 Forwards Annual Radioactive Effluent Release Rept for Jan- Dec 1998 & Rev 11 to ODCM for Shnpp HNP-99-068, Forwards Rev 0 to Physical Security & Safeguards Contingency Plan. Description of Changes Provided.Encl Withheld1999-04-28028 April 1999 Forwards Rev 0 to Physical Security & Safeguards Contingency Plan. Description of Changes Provided.Encl Withheld ML18016A9211999-04-27027 April 1999 Provides Rev 2 to ISI Relief Request 2RG-008, ISI of Class 1,2 & 3 Snubbers (Code Category F-A) Per Plant TS in Lieu of ASME Code Section XI, in Response to 990408 Telcon with NRC ML18016A9221999-04-27027 April 1999 Forwards Proprietary Notification That SRO Licensed on Shnpp Has Terminated Employment with Cp&L,Per 10CFR50.74(b). Proprietary Info Withheld,Per 10CFR2.790(a)(6) ML18016A9161999-04-22022 April 1999 Forwards Proprietary NRC Form 396, Certification of Medical Exam by Facility Licensee, for SRO Licensed to Operate Hnp. License for Individual Should Be Amended IAW Change Noted on Form.Proprietary Encl Withheld,Per 10CFR2.790(a)(6) ML18016A9201999-04-20020 April 1999 Informs of HNP Personnel Changes to Facilitate Proper Distribution of Correspondence.Records Should Be Updated to Reflect Noted Change ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR ML18016A9121999-04-12012 April 1999 Forwards Diskette Containing Data Re Annual Exposure Rept for Individual Monitoring for Personnel Shnpp,Per 10CFR20.2206(b).Without Encl ML18016A9021999-04-12012 April 1999 Forwards Rev 34 to PLP-201, Shearon Harris NPP Emergency Plan, Replacing All Pages of Previous Rev with Exception of EAL Flow Path,Side 1 & 2 & Annex H Operations Map & Aperture Card.Changes,Listed.Rev Summary,Encl IR 05000400/19982011999-04-12012 April 1999 Discusses Safeguards Insp Rept 50-400/98-201 (Operational Safeguards Response Evaluation) on 980908-11.No Violations Noted.Licensee Performance During Evaluation Indicated Excellent Overall Contingency Response Capability 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML18017A9241999-10-15015 October 1999 Provides Supplemental Info Re 981223 Lar,Placing Plant Spent Fuel Pools 'C' & 'D' in Service.Info Provided Does Not Change Util Initial Determination That Proposed License Amend Represents No Significant Hazards Consideration ML18017A9141999-10-12012 October 1999 Forwards Addl Info Re Second 10-year ISI Program Plan Relief Requests,As Requested During 990923 Telcon ML18017A9131999-10-0606 October 1999 Provides Notification That Three SROs Licensed at Shnpp Have Been Reassigned from Position for Which Util Previously Certified Need for SRO License.Name,Docket Number & License Number for Subject Sros,Encl.Encl Withheld ML18017A8911999-09-30030 September 1999 Submits Comment on Encl 2 to 990617 Memo Titled Summary of Meeting with Nuclear Energy Inst. Encl 2 Was Titled Draft Technical Study of Spent Fuel Pool Accidents for Decommissioning Plants. Rept Which Provides Info Encl Also ML20212J0741999-09-29029 September 1999 Refers to Proposed License Amend for Harris NPP Which Would Allow Licensee to Activate Two of Plant Spent Fuel Pools.Serves Copy of Orange County Second Set of Document Requests to NRC Staff,Dtd 990929.Related Correspondence ML18017A8941999-09-29029 September 1999 Forwards Response to NRC 990414 RAI Re GL 95-07, Pressure- Locking & Thermal-Binding of SR Power-Operated Gate Valves. ML18017A8881999-09-27027 September 1999 Submits Info Re Estimated Effect of Changes or Errors in ECCS Evaluation Models or in Application of Models,Per 10CFR50.46(a)(3)(ii) ML18017A8861999-09-21021 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations. ML18017A8821999-09-14014 September 1999 Provides Notification That RO Licensed on Harris Plant No Longer Meets Requirements of 10CFR50.21,effective 990826. Name,Docket Number & License Number for Individual Provided in Encl.Encl Withheld,Per 10CFR2.790(a)(6) ML18017A8651999-09-0808 September 1999 Requests Relief from Section XI,IWA-5242(a) Requirement for HNP Class 2 Bolted Connections in Borated Sys.Compliance with Requirement Would Result in Unusual Difficulty Without Compensating Increase in Level of Quality & Safety ML18017A8581999-09-0303 September 1999 Provides Response to NRC 990805 RAI Re Amend Request to Increase Fuel Storage Capacity ML18017A8551999-09-0101 September 1999 Forwards Marked Up Copy of Approved FSAR Section 17.3 with Applicable Duplicated TS Requirements,As Committed to in 990602 Application for Rev to TS ML18017A8541999-08-20020 August 1999 Submits Closure Info for Rev 1,Suppl 1 to GL 92-01, Reactor Vessel Structural Integrity. Identified Discrepancies from Review of NRC Rvid Provided HNP-99-134, Forwards Rev 11 to Physical Security & Safeguards Contingency Plan,Iaw 10CFR50.54(p)(2) & 10CFR50.4(b)(4). Description of Changes Is Provided as Encl 2 to Ltr.Rev Withheld,Per 10CFR73.211999-08-18018 August 1999 Forwards Rev 11 to Physical Security & Safeguards Contingency Plan,Iaw 10CFR50.54(p)(2) & 10CFR50.4(b)(4). Description of Changes Is Provided as Encl 2 to Ltr.Rev Withheld,Per 10CFR73.21 ML18017A8351999-08-10010 August 1999 Corrects Statement Made in 980923 Ltr,By Clarifying That Operation of Inner & Outer Pal Doors Can Be Operated by Control Panels Located Inside & Outside Containment ML18016B0531999-08-0606 August 1999 Forwards Exercise Scenario with Controller Info & Simulation Data for Harris Nuclear Plant Emergency Preparedness Exercise Scheduled for 990921.Without Encl ML18016B0461999-08-0404 August 1999 Forwards LER 99-006-01 Describing Condition Which Resulted in Exceeding TS Requirements for CIVs & TS 4.0.4 for Generic Requirements for Surveillance Testing.Rev Includes Results of Investigation Into Failure to Recognize TS Requirements ML18016B0421999-07-30030 July 1999 Informs That in Ltr Dtd 950330 CP&L Committed to Complete Assessment of Severe Accident Mgt Capabilities & Make Any Identified Enhancements by 981231.Actions Were Completed in July 1998 ML18016B0391999-07-30030 July 1999 Forwards Rev 35 to PLP-201, Emergency Plan. Rev Replaces All Pages of Previous Rev with Exception of EAL Flow Path, Side 1 & 2 & Annex H,Operations Map & Aperature Card. Changes Made by Rev,Listed ML18016B0221999-07-26026 July 1999 Informs That CP&L Proposes to Provide Response to NRC 990414 RAI Re GL 95-07, Pressure-Locking & Thermal-Binding of SR Power-Operated Gate Valves, by 990930 ML18016B0171999-07-16016 July 1999 Forwards Corrected Pages to Annual Radioactive Effluent Release Rept, for 1998 for HNP ML18016B0051999-07-0101 July 1999 Informs of Scheduled Emergency Preparedness Exercise for Shnpp on 990921,per Requirements of 10CFR50,App E.List of 26 Objectives Selected for Evaluation During Exercise,Encl. Without Encl ML18016A9871999-06-14014 June 1999 Forwards Response to NRC 990429 RAI Re License Amend Request to Place Spent Fuel Pools C & D in Service,Dtd 981223.Info Does Not Change Initial Determination That Proposed License Amend Represents No Significant Hazards Consideration ML18016A9831999-06-10010 June 1999 Submits Notification That Reactor Operator Licensed at HNP Has Terminated Employment with Cp&L.Reactor Operator Info Encl.Effective 990528,individuals License Is No Longer Required & CP&L Requests That License Be Terminated ML20212H7521999-06-0404 June 1999 Encourages NRC to Schedule Open Public Forum Which Would Allow Local Citizens to Express Concerns Re Proposed Expansion of high-level Radwaste Storage Capacity at Shearon Harris Npp.With Certificate of Svc.Served on 990624 ML18016A9721999-05-28028 May 1999 Responds to 990309 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. ML18016B0011999-05-26026 May 1999 Forwards Ltr Received from Hj Jaffe Expressing Concern Re Cpl Proposal to NRC on Dec of 1998 to Make Harris Nuclear Plant Largest Storage Area for High Level Nuclear Waste in Nation ML18016A9631999-05-25025 May 1999 Forwards Periodic Update to FSAR for Hnp.Amend 49 Is Current Through 981128 (End of RFO 8).Some Changes & Analysis Completed After 981128 Have Also Been Included in Amend ML18016A9511999-05-13013 May 1999 Submits Info Re Estimated Effect of Change to ECCS Evaluation Model,As Required by 10CFR50.46 ML18016A9481999-05-0606 May 1999 Forwards NRC Form 396, Certification of Medical Examination by Facility Licensee, for Senior Reactor Operator Licensed to Operate Hnp.Individuals Info Is Proprietary & Is Being Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20206R2611999-05-0505 May 1999 Requests That NRC Grant Standing to Intervention Sought by Orange County Board of Commissioners Re Proposal by CP&L to Expand Storage of Hlrw at Shnpp.With Certificate of Svc. Served on 990519 ML18016A9451999-05-0404 May 1999 Provides Proprietary Notification That One SRO Has Been Reassigned from Position for Which Util Certified Need for SRO License & Another SRO Has Terminated Employment with Util.Proprietary Info Withheld,Per 10CFR2.790(a)(6) ML18016A9441999-05-0404 May 1999 Notifies NRC of Util Completion of Actions Re GL 96-01, Testing of Safety-Related Logic Circuits at Plant ML18016A9351999-04-30030 April 1999 Forwards Info Requested in 990324 RAI as Suppl to 981223 Application for Amend to License NPF-63 for Alternative Plan for Spent Fuel Pool Cooling & Cleanup Sys Piping ML18016A9311999-04-30030 April 1999 Forwards Annual Radioactive Effluent Release Rept for Jan- Dec 1998 & Rev 11 to ODCM for Shnpp HNP-99-068, Forwards Rev 0 to Physical Security & Safeguards Contingency Plan. Description of Changes Provided.Encl Withheld1999-04-28028 April 1999 Forwards Rev 0 to Physical Security & Safeguards Contingency Plan. Description of Changes Provided.Encl Withheld ML18016A9221999-04-27027 April 1999 Forwards Proprietary Notification That SRO Licensed on Shnpp Has Terminated Employment with Cp&L,Per 10CFR50.74(b). Proprietary Info Withheld,Per 10CFR2.790(a)(6) ML18016A9211999-04-27027 April 1999 Provides Rev 2 to ISI Relief Request 2RG-008, ISI of Class 1,2 & 3 Snubbers (Code Category F-A) Per Plant TS in Lieu of ASME Code Section XI, in Response to 990408 Telcon with NRC ML18016A9161999-04-22022 April 1999 Forwards Proprietary NRC Form 396, Certification of Medical Exam by Facility Licensee, for SRO Licensed to Operate Hnp. License for Individual Should Be Amended IAW Change Noted on Form.Proprietary Encl Withheld,Per 10CFR2.790(a)(6) ML18016A9201999-04-20020 April 1999 Informs of HNP Personnel Changes to Facilitate Proper Distribution of Correspondence.Records Should Be Updated to Reflect Noted Change ML18016A9121999-04-12012 April 1999 Forwards Diskette Containing Data Re Annual Exposure Rept for Individual Monitoring for Personnel Shnpp,Per 10CFR20.2206(b).Without Encl ML18016A9021999-04-12012 April 1999 Forwards Rev 34 to PLP-201, Shearon Harris NPP Emergency Plan, Replacing All Pages of Previous Rev with Exception of EAL Flow Path,Side 1 & 2 & Annex H Operations Map & Aperture Card.Changes,Listed.Rev Summary,Encl ML18016A8911999-04-0505 April 1999 Forwards non-proprietary App 4A,pages 20-25 & Proprietary Page 4-6 to re-issued Rev 3 of Holtec International Licensing Rept HI-971760.Pages Were Inadvertently Omitted from Reissued Rept.Proprietary Page 4-6 Withheld ML18016A8891999-04-0101 April 1999 Forwards Rev 99-1 to Plant EALs for NRC Review & Approval, Per 10CFR50,App E.Encl Provides Comparison of Currently Approved EALs & Proposed Rev 99-01.Approval of EALs Prior to June 1999,requested.With Four Oversize Drawings ML18016A8811999-03-31031 March 1999 Responds to NRC 990301 Ltr Re Violations Noted in Insp Rept 50-400/98-11.Corrective Actions:Post Trip/Safeguards Actuation Rept for 981023,RT Was Corrected,Required Reviews Completed & Approval Obtained on 990219 ML18016A8671999-03-19019 March 1999 Submits Response to RAI Re Spent Fuel Pool Water Level & Revised Fuel Handling Accident Analyses,Per 990317 Telcon with NRC ML18016A8631999-03-19019 March 1999 Forwards Shnpp Operator Training Simulator,Simulator Certification Quadrennial Rept, IAW 10CFR55.45(b)(5)(ii). NRC Form 474 & Required Info Re Simulator Performance Test Results & Schedules Also Encl ML18016A8691999-03-18018 March 1999 Forwards Resolution Adopted by Lee County,North Carolina Board of Commissioners Re Proposed Expansion of high-level Radioactive Waste Storage Facilities at Carolina Power & Light Shearon Harris Nuclear Power Plant ML18016A8511999-03-15015 March 1999 Forwards Proprietary & non-proprietary Version of Rev 3 to HI-971760, Licensing Rept for Expanding Storage Capacity in Harris SFPs 'C' & 'D'. Repts Are Reissued to Reflect Reduction in Proprietary Info.Proprietary Info Withheld ML18016A8601999-03-15015 March 1999 Informs NRC of Mod to Commitment for Hnp,Re Comprehensive Review of Implementation of TS Sr.Upon Completion of Listed Reviews,Surveillance Procedure Review Project Will Be Considered Complete 1999-09-08
[Table view] |
Text
~
i REGULAT Y INFORMATION DISTRIBUTIO SYSTEM (RIDS)
ACCESSION NBR:9906210117 DOC.DATE: 99/06/14 NOTARIZED: NO DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION ALEXANDER,D.B. Carolina Power & Light Co.
RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)
SUBJECT:
Forwards response to NRC 990429 RAI re license amend request to place spent fuel pools C & D in service,dtd 981223.Info does not change initial determination that proposed license amend represents no significant hazards consideration.
DISTRIBUTION CODE: A001D TITLE: OR COPIES RECEIVED:LTR Submittal: General Distribution g ENCL ~ SIZE:
E NOTES:Application for permit renewal filed. 05000400 Q
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL LPD2-2 LA 1 1 LPD2-2 PD 1 1 LAUFER,R. 1 1 INTERNAL: ACRS 1 1 CENTER 01 1 1 NRR/DE/EEIB 1 1 NRR/DE/EMC 1 1 NRR/DE/EMEB 1 1 NRR/DSSA/SPLB 1 1 NRR/DSSA/SRXB 1 1 NRR/SPSB JUNG,I 1 1 HUDOCS-ABSTRACT 1 1 OGC/RP 1 0 EXTERNAL: NOAC 1 1 NRC PDR D pqiip~~~, I" I NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 15 ENCL 14
Carolina Power & Ught Company Harris Nuclear Plant P.O. Box 165 New Hill NC 27562 SERIAL: HNP-99-094 zux 14 1999 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 RESPONSE TO NRC REQUEST FOR ADDITIONALINFORMATION REGARDING THE LICENSE AMENDMENTREQUEST TO PLACE HNP SPENT FUEL POOLS 'C' 'D'N SERVICE
Dear Sir or Madam:
By letter dated April 29, 1999, the NRC issued a request for additional information (RAI) regarding the Harris Nuclear Plant (HNP) license amendment request, submitted by CP&L letter Serial: HNP-98-188, dated December 23, 1998, to place spent fuel pools C and D in service. The HNP response to the NRC RAI is enclosed. The enclosed information is provided as a supplement to our December 23, 1998 license amendment request and does not change our initial determination that the proposed license amendment represents a no significant hazards consideration.
Please refer any questions regarding the enclosed information to Mr. Steven Edwards at (919) 362-2498.
Sincerely, Donna B. Alexander Manager, Regulatory Affairs Harris Nuclear Plant r
KWS/kws Enclosure 990b2i0ii7 990bi4 05000%GO PDR ADOCK P PDR 5413 Shearon Harris Road New Hill NC
~
Document Control Desk SERIAL: HNP-99-094 Page 2 Mr. J. B. Brady, NRC Senior Resident Inspector Mr. Mel Fry, N.C. DEHNR Mr. R. J. Laufer, NRC Project Manager Mr. L. A. Reyes, NRC Regional Administrator - Region II
~l
~ "'g
. Document Control Desk e
Serial: HNP-99-094 Page 3 bc:
Mr. K. B. Altman Ms. L. N. Hartz Mr. G. E. Attarian Mr. W J. Hindman Mr. R. H. Bazemore Mr. C. S. Hinnant Mr. C. L. Burton Mr. W. D. Johnson Mr. S. R. Carr Mr. G. J. Kline Mr. J. R. Caves Ms. W. C. Langston (PE&RAS File)
Mr. H. K. Chernoff (RNP) Mr. R. D. Martin Mr. B. H. Clark Mr. T. C. Morton Mr. W. F. Conway Mr. J. H. O'eill, Jr.
Mr. G. W. Davis Mr. J. S. Scarola Mr. W. J. Dorman (BNP) Mr. J. M. Taylor Mr. R. S. Edwards Nuclear Records Mr. R. J. Field Harris Licensing File Mr. K. N. Harris Files: H-X-0511 H-X-0642
A
. Enclosure to Serial: HNP-99-094 Page1of4 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 RESPONSE TO NRC REQUEST FOR ADDITIONALINFORMATION REGARDING THE LICENSE AMENDMENTREQUEST TO PLACE HNP SPENT FUEL POOLS 'C' 'D'N SERVICE Re uested Item 1 Although the burnup criteria for storage in Pools C or D will be implemented by administrative procedures to ensure verified burnup prior to fuel transfer into these pools, an administrative failure should be assumed and evaluation of a fuel assembly misloading event (i.e., a fresh pressurized-water reactor (PWR) assembly inadvertently placed in a location restricted to a burned assembly as per Technical Specifications (TS) Figure 5.6.1) should be analyzed.
Res onse to Re uested Item 1 The presence of soluble boron in the spent fuel pool water will assure that the reactivity is maintained substantially less than the design limitation in the event of a misloading event as described above. The Double Contingency Principle provides that neither the utility nor the staff is required to assume two unlikely, independent, concurrent events. Therefore, a failure of the administrative controls related to fuel assembly placement and the inadvertent dilution of the spent fuel pool water need not be considered to occur simultaneously. As a result, credit for the presence of soluble boron in the spent fuel pool water may be taken for an assembly misloading event as described. A minimum spent fuel pool boron concentration of 2000 ppm is maintained in accordance with HNP chemistry procedure CRC-001. This minimum boron concentration is more than adequate to offset the reactivity addition from a postulated fuel assembly misloading event. Based on analysis performed by Holtec International, it has been determined that a soluble boron concentration of 400 ppm would be sufficient to maintain k,ir less than 0.95 in the event of a fuel assembly misloading event (i.e., a fresh pressurized-water reactor (PWR) assembly inadvertently placed in a location restricted to a burned assembly as per TS Figure 5.6.1).
Re uested Item 2 How will the burnup requirements needed to meet TS Figure 5.6.1 be ascertained for fuel assemblies shipped from other PWR plants (Robinson)?
Res onse to Re uested Item 2 The burnup curve (proposed TS Figure 5.6.1) applies to the Robinson 15 x 15 fuel assembly types identified in Table 4.3.1 of Enclosure 6 to CPSs license amendment request, dated 12/23/98.
The selection of spent fuel for shipment to Harris is made in accordance with procedure NFP-NGGC-0003, entitled "Procedure for Selection of Irradiated Fuel for Shipment in the IF-300 Spent Fuel Cask." The purpose of this procedure is to assure that the requirements of the IF-300
~ Enclosure to Serial: HNP-9 -094 Page 2 of 4 Cask Certificate of Compliance No. 9001 are met with regard to the selection of irradiated fuel to be shipped and that the fuel selected for shipment is acceptable for storage at CPSs Harris plant. This procedure has been in use since 1990 for Robinson spent fuel shipments.
A computer program, which has also been in use since 1990 for Robinson spent fuel shipments, is used in conjunction with the above-referenced fuel selection procedure. For candidate assemblies to be shipped, the program retrieves the fuel type, enrichment, burnup, and decay heat from the special nuclear materials database. The initial enrichment data for each fuel assembly is contained in this database along with the other fuel data, and this data is based on manufacturing records. The burnup data for each fuel assembly is also included in the database along with the other isotopic inventories, and this data is obtained from the core monitoring software used for the Robinson plant. The special nuclear material database and core monitoring software have also been in use since 1990 for Robinson shipments.
The burnup curve proposed as TS Fig. 5.6.1 for pools C and D has already been programmed into the software for use in conjunction with fuel selection procedure NFP-NGGC-0003; however, this version is not yet in production as testing and documentation per COL's computer code quality assurance requirements are in progress. This new version will screen candidate PWR (Robinson) fuel against the burnup curve.
Revision to fuel selection procedure NFP-NGGC-0003 to reflect criticality screening requirements for fuel to be stored in Harris pools C or D has begun, but will not be completed until after: (1) the software changes identified above have been tested and the revised software placed in production status, and (2) the NRC has approved CP8cL's license amendment application to place spent fuel pools C and D in service.
Re uested Item 3 The fuel enrichment tolerance is specified in Section 4.5.2.5 as+0.0/-0.05. Why isn't a positive tolerance of +0.05 assumed (i.e., 5.0+0.05 weight percent U-235)?
Res ouse to Re uested Item 3 A maximum U-235 enrichment of 5.0 weight percent was specified, because it is the maximum enrichment allowed by both the Robinson and Harris Technical Specifications. Robinson TS 4.3.1.1.a states that the spent fuel racks shall be maintained with fuel assemblies having a maximum U-235 enrichment of 5.0 weight percent. Robinson TS 4.3.1.2.a states that the new fuel racks shall be maintained with fuel assemblies having a maximum U-235 enrichment of 5.0 weight percent. Harris TS 5.3.1 states that the initial core loading shall have a maximum enrichment of 3.5 weight percent U-235 and that reload fuel shall have a maximum enrichment of 5.0 weight percent U-235.
Also, the manufacturing facility of Siemens Power Corporation (SPC), the current fuel supplier for both the Robinson and Harris plants, is limited by license to a maximum U-235 enrichment of 5.0 weight percent. The SPC manufacturing tolerance is 0.05 weight percent U-235. Therefore, for enrichments with a tolerance of +/- 0.05%, the nominal design enrichment may not exceed
k 8 ~ L% 1 s
~
Enclosure to Serial: HNP-9 -094 Page 3 of 4 4.95 weight percent U-235 to ensure that the nominal plus the tolerance does not exceed 5.0 weight percent. The fuel enrichment and density tolerances specified in Section 4.5.2.5 appropriately supports a maximum allowable enrichment of 5.0 weight percent U-235.
Re uested Item 4 Justify that the allowance that was assumed for possible differences between the fuel vendor and the Holtec calculations is sufficient to also encompass burnup calculational uncertainties.
Res onse to Re uested Item 4 The Criticality Safety Calculations for the BWR Fuel Racks are summarized in Table 4.2.2 of Enclosure 6 to CP&L's license amendment request, dated 12/23/98. An uncertainty on depletion was not explicitly included in the uncertainties summarized in Table 4.2.2. Instead, the 0.01 additive allowance for comparisons to vendor calculations discussed in Section 4.4.2.2 also accounts for burnup uncertainty. This practice is acceptable for the following two reasons:
First, the BWR calculations consider the peak reactivity during burnup. The k;i in the rack corresponding to a peak k;r in the Standard Cold Core Geometry (SCCG) of 1.32 was calculated in the analysis. The burnup corresponding to this peak reactivity value is simply a by-product of this calculation and, in contrast to PWR analysis, burnup is not used as a criteria for establishing acceptability for fuel storage. Any uncertainty in the burnup calculation would simply decrease or increase, with burnup, the location of the peak reactivity. However, the k;r in the SCCG and the k;r in the rack would remain the same at the peak in reactivity. As a result, an additional uncertainty on depletion is not necessary. r Second, the fuel vendor performs similar depletion calculations to those discussed in Section 4.
Therefore any uncertainty in depletion is an inherent part of the comparison between those calculations in Section 4 and those performed by the vendor to determine the peak k;r in SCCG as a function of burnup. Again, it is noted that the actual burnup at which the peak occurs is not used in the BWR acceptable fuel storage criteria.
Re uested Item 5 The summary of criticality safety calculations shown in Tables 4.2.1 and 4.2.2 indicates that the total uncertainty is a statistical combination of the manufacturing tolerances but do not indicate methodology biases and uncertainties. Were these included?
Res onseto Re uested Item 5 Section 4.4.1 of Enclosure 6 to COL's license amendment request, dated 12/23/98, discusses the fact that CASMO-3, because it is a two-dimensional code, can not be directly compared to critical experiments and as a result a calculational/methodology bias is not available for CASMO-3. This section also discusses MCNP, which is a full three-dimensional Monte Carlo code, which has been benchmarked against critical experiments. CASMO-3 was used as the
T ~
~
Enclosure to Serial: HNP-9 -094 Pa'ge 4 of 4 primary method of calculation and the results from CASMO-3 were compared to the regulatory limit of k,rr(0.95 in Tables 4.2.1 and 4.2.2. As noted, the methodology bias and uncertainty
'were not included in these tables. However, these factors were implicitlyincluded in a code-to-code comparison between CASMO-3 and MCNP shown in Table 4.5.1.
As discussed above, a methodology bias can not be developed for CASMO-3. Therefore, CASMO-3 results were compared to MCNP results to either verify that it produces conservative results relative to the benchmarked MCNP, or to determine a code-to-code bias. This comparison is discussed in Sections 4.5.1 and 4.6.1 with the results presented in Table 4.5.1. In the comparison between MCNP and CASMO-3, the methodology bias, uncertainty on the bias, calculational statistics, and a correction from 20'C to 4'C were added to the MCNP results.
These results indicate that CASMO-3 is conservative relative to the benchmarked code MCNP and therefore the code-to-code bias was 0.0 for CASMO-3. Since the code-to-code bias was 0.0, it was not included in Tables 4.2.1 and 4.2.2. In conclusion, it can be stated that even though a methodology bias'nd uncertainty were not directly included in the final results shown in Tables 4.2.1 and 4.2.2, they were implicitly included through comparison of CASMO-3 and the benchmarked MCNP, provided in Table 4.5.1.
~ ~ ~