ML20237H319
| ML20237H319 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 08/27/1987 |
| From: | Julian C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Utley E CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML20237H323 | List: |
| References | |
| NUDOCS 8709030206 | |
| Download: ML20237H319 (2) | |
Text
f N
l l
August 27, 1987 l
I Carolina Power and Light Company ATTN: Mr. E. E. Utley Senior Executive Vice President Pot: > Supply and Engineering and Construction P. O. Box 1551 Raleigh, NC 27602 Gentlemen:
SUBJECT:
SHEARON HARRIS NUCLEAR POWER PLANT EXAMINATION REPORT 400/0L-87-02 Thc NRC administered examinations on August 4-5, 1987, to employees of your company licensed or applying for a license to operate the Shearon Harris Nuclear Power Plant. At the conclusion of the site visit, preliminary findings on the operating tests were discussed with those members of your staff identified in the enclosed Examination Report.
In accordance with 10 CFR 2.790(a), a copy of this letter and its enclosures will be placed in NRC's Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely, (ORIGINAL SIGNED BY C. A. JULIAN)
Caudie A. Julian, Chief i
Operations Branch Division of Reactor Safety
Enclosure:
Exam Report 50-400/0L-87-02 cc w/ encl:
J. Harness, Corporate Training Dir.
I J. L. Willis, Plant Manager I
A. W. Powell, Site Training Director bcc w/ encl:
(See page 2) l 8709030206 970827 l
PDR ADDCK 05000400 V
PDR b\\
r xn 3
5 Carolina Power and Light Company 2
August 27, 1987 bec w/ encl:
B. Buckley, Project Manager, NRR Section Chief, DRP 4
State of North Carolina Senior Resident Inspector Operator Licensing Branch, DLPQ Document Control Desk
)
I i
i i
i I
I l
l 4
1 RII RII RI
/
RShdW Cabtb JFMunro CAJulian o8/a7/87
/e/o g /t+/ s,
g/z / g 7 e
- _ - _ _ _ _ -