ML20210U849
| ML20210U849 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 01/28/1987 |
| From: | Verrelli D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Utley E CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML20210U853 | List: |
| References | |
| NUDOCS 8702180613 | |
| Download: ML20210U849 (2) | |
Text
_ _ _ _ _ _ _ _ _ _ _ _
t January 28, 1987 Docket No. 50-400 Carolina Power and Light Company ATTN: Mr. E. E..Utley Senior Executive Vice. President Power Supply and Engireering and Construction P. O. Box 1551 Raleigh,.NC' 27602 Gentlemen:
l
SUBJECT:
SHEARON HARRIS EXAMINATION REPORT 400/0L-86-04 The NRC administered examinations on November.4-6,1986, to employees of your
)
company who had applied for licenses to operate the_Shearon Harris Nuclear Plant.
At the conclusion of the site visit, preliminary findings on the operating examinations were discussed with those members of your staff identified in the Examination Report, Enclosure 1.
In accordance with 10 CFR 2.790(a), a copy of this letter and its enclosures will be placed in NRC's Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely, (Original signed by B.A. Wilson for)
David M. Verrelli Reactor Projects Branch 1-Division of Reactor Projects
Enclosure:
Exam Report 50-400/0L-86-04 cc w/ encl:
A. W. Powell, Director, Training HTU J. L. Willis, Plant Manager l
C. Olexik, Site Training Director bec w/ encl:
(See page 2)
G702180613 870120 (DR ADOCK 05000400 PDR
.h ann
f l Carolina Power and. Light' Company 2
January 28, 1987 bec w/ encl:
Project Manager, NRR State of North Carolina Senior Resident Inspector Operator Licensing Branch, DHFT:NRR Document Control Desk i
i l
RI RII [
RII[
II RII
(,h y
aw:bhg CAQasto C
lian VP ciera 1/ lT/87 1/g%/87 1/jf/. 7 1/ /87 1/ F/87 i
,