March 3, 2008
SUBJECT:
ANNUAL ASSESSMENT LETTER - SHEARON HARRIS NUCLEAR POWER PLANT (NRC INSPECTION REPORT 05000400/2008001)
Dear Mr. Duncan:
On February 06, 2008, the NRC technical staff completed its performance review of the Shearon Harris Power Plant for the period from January 1 through December 31, 2007. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and the enclosed inspection plan do not include security information.
A separate letter designated and marked as Official Use Only - Security-Related Information will include the security cornerstone review and a resultant inspection plan.
Overall, Shearon Harris operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for Shearon Harris Unit 1 for the most recent quarter, as well as the first three quarters of the assessment cycle, was in the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan on conducting several non-ROP inspections which include operator licensing, and Temporary Instructions 171 (B.5.b) and 172 (Reactor Coolant System Dissimilar Metal Butt Welds).
The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through June 30, 2009. The inspection plan is provided to minimize the resource impact on your staff and to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review meeting.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (404) 562-4603 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Randall A. Musser, Chief Reactor Projects Branch 4
Division of Reactor Projects
Docket No.:
50-400 License No.: NPF-63
Enclosure: Harris Inspection/Activity Plan
cc w/encl: (See page 3)
_________________________
OFFICE RII:DRP RII:DRP
SIGNATURE RAM GJW
NAME RMusser GWilson
DATE 03/03/2008 02/27/2008
E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO
Chris L. Burton, Manager Performance Evaluation and Regulatory Affairs CPB 9 Carolina Power & Light Company Electronic Mail Distribution
Robert II Director of Site Operations Carolina Power & Light Company Shearon Harris Nuclear Power Plant Electronic Mail Distribution
Eric McCartney Plant General Manager--Harris Plant Progress Energy Carolinas, Inc.
Shearon Harris Nuclear Power Plant Electronic Mail Distribution
J. Wayne Gurganious Training Manager-Harris Plant Progress Energy Carolinas, Inc.
Harris Energy & Environmental Center Electronic Mail Distribution
Christos Kamilaris, Manager Support Services Carolina Power & Light Company Shearon Harris Nuclear Power Plant Electronic Mail Distribution
David H. Corlett, Supervisor Licensing/Regulatory Programs Carolina Power & Light Company Shearon Harris Nuclear Power Plant Electronic Mail Distribution
David T. Conley Associate General Counsel - Legal Department Progress Energy Service Company, LLC Electronic Mail Distribution
John H. O'Neill, Jr.
Shaw, Pittman, Potts & Trowbridge 2300 N. Street, NW Washington, DC 20037-1128
Beverly Hall, Chief, Radiation Protection Section N. C. Department of Environmental Commerce & Natural Resources Electronic Mail Distribution
Public Service Commission State of South Carolina P. O. Box 11649 Columbia, SC 29211
Chairman of the North Carolina Utilities Commission c/o Sam Watson, Staff Attorney Electronic Mail Distribution
Robert P. Gruber Executive Director Public Staff NCUC 4326 Mail Service Center Raleigh, NC 27699-4326
Herb Council, Chair Board of County Commissioners of Wake County P. O. Box 550 Raleigh, NC 27602
Tommy Emerson, Chair Board of County Commissioners of Chatham County Electronic Mail Distribution
Report to R. from Randall A. Musser dated March 3, 2008,
SUBJECT:
ANNUAL ASSESSMENT LETTER - SHEARON HARRIS NUCLEAR POWER PLANT (NRC INSPECTION REPORT 05000400/2008001)
C. Patel, NRR C. Evans, RII L. Slack, RII RIDSNRRDIRS ROP Reports INPO OE Mail RIDSNRRDIRS PUBLIC
Harris Inspection / Activity Plan 03/03/2008 - 06/30/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/03/2008 15:28:06 Report 22
OL EXAM
- INITIAL EXAM Not Applicable HARRIS/MARCH 2008 EXAM AT POWER FACILITIES 03/10/2008 03/14/2008
V23296
EB1-CDBI
- COMPONENT DESIGN BASIS INSPECTION Baseline Inspections Component Design Bases Inspection 03/31/2008 04/04/2008
7111121 IP Baseline Inspections Component Design Bases Inspection 04/14/2008 04/18/2008
7111121 IP Baseline Inspections Component Design Bases Inspection 04/28/2008 05/02/2008
7111121 IP Baseline Inspections Component Design Bases Inspection 05/12/2008 05/16/2008
7111121 IP
PSB1-EP
- EP INSP EP Baseline Inspection Alert and Notification System Testing 04/07/2008 04/11/2008
7111402 IP EP Baseline Inspection Emergency Response Organization Augmentation Testing 04/07/2008 04/11/2008
7111403 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 04/07/2008 04/11/2008
7111404 IP EP Baseline Inspection Correction of Emergency Preparedness Weaknesses and Deficiencies 04/07/2008 04/11/2008
7111405 IP Baseline Inspections Drill/Exercise Performance 04/07/2008 04/11/2008
71151-EP01 IP Baseline Inspections ERO Drill Participation 04/07/2008 04/11/2008
71151-EP02 IP Baseline Inspections Alert & Notification System 04/07/2008 04/11/2008
71151-EP03 IP
TI-171
- B.5.B PHASE 2&3 Generic Safety Inspectio Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 06/02/2008 06/06/2008
2515/171 IP
EB3TI172
- TI-172 Generic Safety Inspectio Reactor Coolant System Dissimiliar Metal Butt Welds 07/14/2008 07/18/2008
2515/172 IP
PSB1-RP
- RADIATION PROTECTION PREINSPECTION VISIT Baseline Inspections Access Control to Radiologically Significant Areas 07/21/2008 07/23/2008
7112101 IP
PSB1-RP
- RADIATION PROTECTION PUBLIC BASELINE Baseline Inspections Access Control to Radiologically Significant Areas 08/25/2008 08/29/2008
7112101 IP Baseline Inspections Radiation Monitoring Instrumentation and Protective Equipment 08/25/2008 08/29/2008
7112103 IP Baseline Inspections Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 08/25/2008 08/29/2008
7112201 IP Baseline Inspections Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 08/25/2008 08/29/2008
7112203 IP Baseline Inspections Occupational Exposure Control Effectiveness 08/25/2008 08/29/2008
71151-OR01 IP Baseline Inspections RETS/ODCM Radiological Effluent 08/25/2008 08/29/2008
71151-PR01 IP
EB2-TFP
- TRIENNIAL FIRE PROTECTION Baseline Inspections Fire Protection-NFPA 805 Transition Period [Triennial]
09/22/2008 09/26/2008
7111105P IP Baseline Inspections Fire Protection-NFPA 805 Transition Period [Triennial]
10/06/2008 10/10/2008
7111105P IP
OL EXAM
- INITIAL EXAM PREP Not Applicable HARRIS/MARCH 2009 EXAM AT POWER FACILITIES 02/09/2009 02/13/2009
V23298
PSB1-RP
- RADIATION PROTECTION PREINSPECTION VISIT Baseline Inspections Access Control to Radiologically Significant Areas 02/23/2009 02/25/2009
7112101 IP This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Harris Inspection / Activity Plan 03/03/2008 - 06/30/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/03/2008 15:28:06 Report 22
OL EXAM
- INITIAL EXAM WEEK 1 Not Applicable HARRIS/MARCH 2009 EXAM AT POWER FACILITIES 03/02/2009 03/06/2009
V23298
PSB1EP
- EP EXERCISE EP Baseline Inspection Exercise Evaluation 03/02/2009 03/06/2009
7111401 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 03/02/2009 03/06/2009
7111404 IP Baseline Inspections Drill/Exercise Performance 03/02/2009 03/06/2009
71151-EP01 IP Baseline Inspections ERO Drill Participation 03/02/2009 03/06/2009
71151-EP02 IP Baseline Inspections Alert & Notification System 03/02/2009 03/06/2009
71151-EP03 IP
OL EXAM
- INITIAL EXAM WEEK 2 Not Applicable HARRIS/MARCH 2009 EXAM AT POWER FACILITIES 03/16/2009 03/20/2009
V23298
- REQUAL INSPECTION Baseline Inspections Licensed Operator Requalification Program 03/30/2009 04/03/2009
7111111B IP
PSB1-RP
- RADIATION PROTECTION OCCUPATIONAL WK1 Baseline Inspections Access Control to Radiologically Significant Areas 04/06/2009 04/10/2009
7112101 IP Baseline Inspections ALARA Planning and Controls 04/06/2009 04/10/2009
7112102 IP Baseline Inspections Radioactive Material Processing and Transportation 04/06/2009 04/10/2009
7112202 IP Baseline Inspections Occupational Exposure Control Effectiveness 04/06/2009 04/10/2009
71151-OR01 IP Baseline Inspections RETS/ODCM Radiological Effluent 04/06/2009 04/10/2009
71151-PR01 IP
EB3ISI
- ISI Baseline Inspections Inservice Inspection Activities - PWR 04/13/2009 04/17/2009
7111108P IP
PSB1-RP
- RADIATION PROTECTION OCCUPATIONAL WK2 Baseline Inspections Access Control to Radiologically Significant Areas 04/20/2009 04/24/2009
7112101 IP Baseline Inspections ALARA Planning and Controls 04/20/2009 04/24/2009
7112102 IP Baseline Inspections Radioactive Material Processing and Transportation 04/20/2009 04/24/2009
7112202 IP This report does not include INPO and OUTAGE activities.