IR 05000400/1986092

From kanterella
Jump to navigation Jump to search
Partially Withheld Security Insp Rept 50-400/86-92 on 861201-05 (Ref 10CFR2.790 & 73.21).Two Violations Noted. Major Areas Inspected:Plan/Procedures,Records/Repts, Barriers,Illumination,Access Controls & Detection Aids
ML20207P985
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 12/22/1986
From: Mcguire D, Tobin W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20207P984 List:
References
50-400-86-92, NUDOCS 8701200535
Preceding documents:
Download: ML20207P985 (1)


Text

_-

'

. .. .

pn [t3,,

%FEGUARDS INFORMATION UNITE] STATES p 'o NUCLEAR REGULATORY COMMISSION y ", REGION ll y j 101 MARIETTA STREET. * g ATLANTA, GEORGI A 30323

'+i...../ JAN 141987 Report No.: 50-400/86-92 G Licensee: Carolina Power and Light Company P. O. Box 1551 Raleigh, NC 27602 Docket No.: 50-400 License Nos.: NPF-53 Facility Name: Shearon Harris Inspection Conducted: December 1-5 , 1986 Inspector: \ (d Physical Security Inspector (dP2ff W.Tob'n, Seq ) ate' Signed Approved by: l, ,

=" h [

~D. R. McGuire," Chief, Physical Security Section Dra te4igned Nuclear Materials Safety and Safeguards Branch Division of Radiation Safety and Safeguards

,

,

SUMARY Scope: This unannounced security inspection reviewed the licensee's program relative to: Plan / Procedures, Records / Reports, Barriers, Illuminatiun, Access Controls, Detection Aids, Alarm Stations and Safeguards Informatio Results: The licensee was determined to be in violation in two areas:

,

Procedures - 50-400/86-92-01 l Procedures - 50-400/86-92-02 l

l l

l

,

! ENCLOSURE CONTAIN$

i SAFEGUARD 5 INFORMATION UPoti SEPAEAIION THIS

^ """**'""

OAFEGUARDS INFORMATION l lE**888MM8ffico PDR