ML20207T484

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-400/87-11 on 870226-0301.No Violations or Deviations Noted
ML20207T484
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 03/13/1987
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML20207T485 List:
References
NUDOCS 8703240063
Download: ML20207T484 (2)


See also: IR 05000400/1987011

Text

' ,

f ,

y

~

MAR 13 B87

. Docket No. 50-400

License No. NPF-53.

. Carolina Power and. Light Company

(NITN: . Mr. E. E. Utley- .

s

Senior Executive Vice . President

.

Power Supply and Engineering

and Construction

P. O. Box 1551

Raleigh,.NC- 27602

Gentlemen:

SUBJECT: NRC INSPECTION REPORT N0. 50-400/87-11

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

W. M.-Sartor on February 26-March 1, 1987. The inspection included a review of

activities authorized for your Shearon Harris facility. At the conclusion of.

the inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the' report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative. records, interviews with personnel, - and observation of

-

activities in progress.

Within the scope of the inspection, no violations or deviations were

identified.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

,_

will be placed in the NRC Public Document Room.

~ Should you ha've any questions concerning this letter, please contact us.

Sincerely,

ORIGNAL SIGNED BY

DAVID M. VERRELLI

David M. Verrelli, Chief

Reactor Projects Branch 1

Division of Reactor Projects

Enclosure:

. Inspection Report

cc w/ encl: (See page 2)

I

'

B703240063 R70313

PDR ADOCK 05000400

G PDR

5\

{ 7E I

r_.

.

{

1

Carolina Power and Light Company 2

1

I

_cc w/ encl:.

E. A. Watson..Vice President-

g.HarrisNuclearProject-

L. Tibbitts, Director of Regulatory

[. Compliance

L. Willis, Plant General Manager

bec w/ encl:

f.Barth,OGC

J Moore, 0GC

C Resident Inspector

~

Document Control Desk

State of North Carolina

4 J'. C. Heard, Jr. , FEMA RIV

dVB. Matthews, EPB/IE

-e )./D. Jamison, Battelle, PNL

4

WSart 'r TDec er ' DCollins Fredrickson

3/g/ 3/g/87 3/jj/87 /ft/87

!

i

?

-L -- - , _ _ , _ . _ _ . , _ . _ _ . . . _ . - , . _ . ,_____ , _ , _ _ _ _ _ _ _ _ . _ . . _ _ , _ _ _ _ _ _ , _ _