ML18017A854

From kanterella
Jump to navigation Jump to search
Submits Closure Info for Rev 1,Suppl 1 to GL 92-01, Reactor Vessel Structural Integrity. Identified Discrepancies from Review of NRC Rvid Provided
ML18017A854
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 08/20/1999
From: Alexander D
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-92-01, HNP-99-130, NUDOCS 9908310239
Download: ML18017A854 (4)


Text

REGULA RY INFORMATION DISTRIBUT SYSTEM (RIDS)

ACCESSION NBR:9908310239 DOC.DATE: 99/08/20 NOTARIZED: NO DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400

~ lAUTH NAME AUTHOR AFFILIATION ALEXANDER,D.B. Carolina Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)

SUBJECT:

Submits closure info for rev 1,Suppl 1 to GL 92-01, "Reactor Vessel Structural'ntegrity." Identified discrepancies from C review of NRC RVID provided.

A DISTRIBUTION CODE: A028D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Generic Letter 92-01, Rev 1, Suppl 1 Responses (Reactor Vessel Struct 7 NOTES:Application"for permit renewal filed. 05000400 E RECIPIENT, COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL 0 LAUFER,R.

INTERNAL: ACRS FILE CENTER 01 NUDOCS-ABSTRACT GGC/M 1 RES/DET/MEB EXTERNAL: NOAC NRC PDR D

U

'E NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.'TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 8 ENCL

I~

y4 Carolina Power & Ught Company Harris Nuclear Plant P.O. Box 165 New Hill NC 27562 AUG 2 0 I999 SERIAL: HNP-99-130 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 CLOSURE INFORMATIONFOR GENERIC LETTER 92-01, REVISION 1, SUPPLEMENT 1, "REACTOR VESSEL STRUCTURAL INTEGRITY"

Dear Sir or Madam:

By letter dated June 30, 1999, the NRC requested that Carolina Power & Light Company (CP&L) review the Harris Nuclear Plant (HNP) information contained in the NRC's Reactor Vessel Integrity Database (RVID) for accuracy.The data has been reviewed for HNP, and the identified discrepancies are presented below.

1 Surveillance Data Summar Table The following corrections should be made to the Surveillance Data Summary Table.

Type/Direction Heat ID/Capsule, Lead Measured USE Measured USE Factor Current Database Value Correct Value for HNP Plate/Lon itudinal B4197-2/U, 2.875 90.0 92.0 P1atefI'rans verse B4197-2/U, 2.875 69.0 68.0 Weld 5P6771/U, 2.875 82.0 83.0 The correct Measured Upper Shelf Energy (USE) values for capsule "U" were redefined per ASTM standard E185-82 and submitted to the NRC by letter dated April 2, 1992 in the capsule "V" summary report, Table 7-4, column "Upper Shelf Observed USE."

U er Shelf Ener Summar Re ort The following note should be added to the Plant References and Beltline Material Notes:

The licensee submitted a.USE I 5OL 4 '/4 7 of 55 ft.-lbs. for intermediate shell (heat number B4197-2) based on Position 1 of Regulatory Guide 1.99, Revision 2.

This information was provided to the NRC in the initial review of the RVID, by letter dated November 16, 1995.

3 ) l ting O eeoSS<02S9 e908ia PDR ADQCK 05000400 P PDR

~~i~ ~>>~i~i rlarris Road New Hill NC

Document Control Desk SERIAL: HNP-99-130 Page 2 Questions regarding this matter may be referred to Mr. J. H. Eads at (919) 362-2646.

Sincerely, D. B. Alexander Manager, Regulatory Affairs Harris Plant c: Mr. J. B. Brady (NRC Senior Resident Inspector, HNP)

Mr. R. J. Laufer (NRR Project Manager, HNP)

Mr. L. A. Reyes (NRC Regional Administrator, Region II)

0 4 ~

'L