Forwards Insp Rept 50-400/86-94 on 861220-870120.No Violations or Deviations Identified
ML20205N185
Person / Time
Site: Harris 
Issue date: 03/24/1987
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML20205N188 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8704020615
Download: ML20205N185 (2)


See also: IR 05000400/1986094

Text

1

.

MAR 2 41987

/

l

l

l

Docket No. 50-400

License No. NPF-53

i

l

Carolina Power and Light Company

l

LXfTN: Mr. E. E. Utley

!

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. O. Box 1551

Raleigh, NC 27602

Gentlemen:

l

SUBJECT: NRC INSPECTION REPORT NO. 50-400/86-94

l

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

G. F. Maxwell on December 20, 1986 - January 20, 1987. The inspection included a

'

review of activities authorized for your Harris facility. At the conclusion of

the inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

Your attention is invited to an unresolved item identified in the inspection

report.

This matter will be pursued during future inspections.

In accordance with Section 2.7.90 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

ORIGINAL SIcygn gy

.

HUGH C narce

8704020615 870324

!

PDR

ADOCK 05000400

David M. Verre111, Chi f

G

PDR

Reactor Projects Branch 1

Division of Reactor Projects

Enclosure:

NRC Inspection Report

cc w/ enc 1:

(See page 2)

\\

\\

Z:GCI

.

. . . . .-

_

_ _ _ _ .

.

.

MAR 2 41987

.e

e e

Carolina Power and Light Company -

2

.

cc.w/ enc 1:

t)t' A. Watson, Vice President

Jarris Nuclear Project

(D'. L. Tibbitts, Director of Regulatory

Compliance

LJ/ L. Willis, Plant General Manager

c w/ enc 1:

- L

Barth, 0GC

Moore, 0GC

f,NftC Resident Inspector

Document Control Desk

.

P

h

f'

q

/LSMellen:cgd

redr ekson

,

ayejm

,pr

-

,