ML20209C676

From kanterella
Jump to navigation Jump to search
Forwards Exam Rept 50-400/OL-87-01 of Exam Administered on 870223-27
ML20209C676
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 04/03/1987
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML20209C679 List:
References
NUDOCS 8704290048
Download: ML20209C676 (1)


Text

.

April 3, 1987 Docket No. 50-400 License No. NPF-53 Carolina Power and Light Company ATIN: Mr. E. E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. O. Box 1551 Raleigh, NC 27602 Gentlemen:

SUBJECT:

SHEAR 0N HARRIS NUCLEAR POWER PLANT EXAMINATION REPORT - i 50-400/0L-87-01 The NRC administered simulator examinations on February 23-27, 1987, to employees of your company licensed or applying for a license to operate the Shearon Harris Nuclear Plant. At the conclusion of the site visit, preliminary findings on these examinations were discussed with those members of your staff identified in the Examination Report, Enclosure 1.

In accordance with 10 CFR 2.790(a), a copy of this letter and its enclosure will be placed in NRC's Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely, MICINAL SfmNED PY DAVID M. VERREIU David M. Verrelli, Chief Reactor Projects Branch 1 Division of Reactor Projects

Enclosure:

Exam Report 50-400/0L-87-01 cc w/ encl:

A. W. Powell, Director.

Training-HTU J. L. Willis, Plant Manager C. Olexik, Training Director n704pjoo4g g70403 Pun ADucK 05000000 bec w/ encl: V PDH B. Buckley, Project Manager, NRR State of North Carolina SeniorResidentInspector(Harris)

Operator Licensing Branch, DHFT:NRR Document Control Desk RII RII N

3/lJ87 w:tj CCasto 3/ th87 J nro

/

CAJdlian N

(>cej'fredrickon' kFt kcu 3/p/87 3/ /87 3l /87 y!L 3 1Fw ,