IR 05000400/1986013

From kanterella
Jump to navigation Jump to search
Preoperational Insp Rept 50-400/86-13 on 860310-13.No Violation or Deviation Noted.Major Areas Inspected:Security Program & Organization,Security Audit & Physical Barriers. Details Withheld (Ref 10CFR2.790(d) & 73.21)
ML20202J368
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 04/04/1986
From: Mcguire D, Tobin W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20202J367 List:
References
50-400-86-13-01, 50-400-86-13-1, NUDOCS 8604160011
Download: ML20202J368 (1)


Text

AFEGUARDS INFORMhTION y

[em af Cgo,^

UNITED STATES NUCLEAR REGULATORY COMMISSION

\\

f/

?

R EGION 11 h (I.M

,

101 MARIETTA STREET. N.W.

  • r e

ATL ANTA. GEORGt A 30323 y/

  • " * *

APR 09 986'

Report No. 50-400/86-13 Licensee:

Carelina Power and Light Company 411 Lafayette Street Raleigh, NC 27602 Docket No. 50-400 License No. CPPR-158 Facility Name:

Shearon Harris Nuclear Power Plant Inspection Date:

March 10-13, 1986 Inspector:

1tf)CAbl tfn

'/b b

.hW.Tobid, nior Securitp Inspector Date Signed Approved by: h v

_ _4o

-

// 86 D. R. McGuire, Chief, Physical Security Section Ddte ' Signed

~

Nuclear Materials Safety and Safeguards Branch Division of Radiation Safety and Safeguards SUMMARY Scope: This announced pre-operational inspection involved 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> inspecting the following areas:

Plan / Procedures, Security Program and Organization, Security Audit, Maintenance, Physical Barriers, Compensatory Measures, Communications, and Contingency Plan.

Results:

The licensee continues to meet its schedule for the final installation and implementation of its security program.