MONTHYEARML18017A9241999-10-15015 October 1999 Provides Supplemental Info Re 981223 Lar,Placing Plant Spent Fuel Pools 'C' & 'D' in Service.Info Provided Does Not Change Util Initial Determination That Proposed License Amend Represents No Significant Hazards Consideration ML18017A9141999-10-12012 October 1999 Forwards Addl Info Re Second 10-year ISI Program Plan Relief Requests,As Requested During 990923 Telcon ML18017A9131999-10-0606 October 1999 Provides Notification That Three SROs Licensed at Shnpp Have Been Reassigned from Position for Which Util Previously Certified Need for SRO License.Name,Docket Number & License Number for Subject Sros,Encl.Encl Withheld ML18017A8911999-09-30030 September 1999 Submits Comment on Encl 2 to 990617 Memo Titled Summary of Meeting with Nuclear Energy Inst. Encl 2 Was Titled Draft Technical Study of Spent Fuel Pool Accidents for Decommissioning Plants. Rept Which Provides Info Encl Also ML20216G3501999-09-29029 September 1999 Confirms Conversations Re NRC Staff Voluntary Response to Orange County Discovery Requests.Staff Will Voluntarily Answer Discovery Requests & Will Not Waive Any Objection or Privilege Under NRC Regulations.Related Correspondence ML20212M1081999-09-29029 September 1999 Confirms Intent to Meet with Utils on 991025 in Atlanta,Ga to Discuss Pilot Plants,Shearon Harris & Sequoyah Any Observations & Lessons Learned & Recommendations Re Implementation of Pilot Program ML20212J0741999-09-29029 September 1999 Refers to Proposed License Amend for Harris NPP Which Would Allow Licensee to Activate Two of Plant Spent Fuel Pools.Serves Copy of Orange County Second Set of Document Requests to NRC Staff,Dtd 990929.Related Correspondence ML18017A8941999-09-29029 September 1999 Forwards Response to NRC 990414 RAI Re GL 95-07, Pressure- Locking & Thermal-Binding of SR Power-Operated Gate Valves. ML18017A8881999-09-27027 September 1999 Submits Info Re Estimated Effect of Changes or Errors in ECCS Evaluation Models or in Application of Models,Per 10CFR50.46(a)(3)(ii) ML18017A8861999-09-21021 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations. ML18017A8821999-09-14014 September 1999 Provides Notification That RO Licensed on Harris Plant No Longer Meets Requirements of 10CFR50.21,effective 990826. Name,Docket Number & License Number for Individual Provided in Encl.Encl Withheld,Per 10CFR2.790(a)(6) ML18017A8651999-09-0808 September 1999 Requests Relief from Section XI,IWA-5242(a) Requirement for HNP Class 2 Bolted Connections in Borated Sys.Compliance with Requirement Would Result in Unusual Difficulty Without Compensating Increase in Level of Quality & Safety ML18017A8581999-09-0303 September 1999 Provides Response to NRC 990805 RAI Re Amend Request to Increase Fuel Storage Capacity ML18017A8551999-09-0101 September 1999 Forwards Marked Up Copy of Approved FSAR Section 17.3 with Applicable Duplicated TS Requirements,As Committed to in 990602 Application for Rev to TS ML18017A8541999-08-20020 August 1999 Submits Closure Info for Rev 1,Suppl 1 to GL 92-01, Reactor Vessel Structural Integrity. Identified Discrepancies from Review of NRC Rvid Provided HNP-99-134, Forwards Rev 11 to Physical Security & Safeguards Contingency Plan,Iaw 10CFR50.54(p)(2) & 10CFR50.4(b)(4). Description of Changes Is Provided as Encl 2 to Ltr.Rev Withheld,Per 10CFR73.211999-08-18018 August 1999 Forwards Rev 11 to Physical Security & Safeguards Contingency Plan,Iaw 10CFR50.54(p)(2) & 10CFR50.4(b)(4). Description of Changes Is Provided as Encl 2 to Ltr.Rev Withheld,Per 10CFR73.21 ML18017A8351999-08-10010 August 1999 Corrects Statement Made in 980923 Ltr,By Clarifying That Operation of Inner & Outer Pal Doors Can Be Operated by Control Panels Located Inside & Outside Containment ML18016B0531999-08-0606 August 1999 Forwards Exercise Scenario with Controller Info & Simulation Data for Harris Nuclear Plant Emergency Preparedness Exercise Scheduled for 990921.Without Encl ML18016B0461999-08-0404 August 1999 Forwards LER 99-006-01 Describing Condition Which Resulted in Exceeding TS Requirements for CIVs & TS 4.0.4 for Generic Requirements for Surveillance Testing.Rev Includes Results of Investigation Into Failure to Recognize TS Requirements ML18016B0391999-07-30030 July 1999 Forwards Rev 35 to PLP-201, Emergency Plan. Rev Replaces All Pages of Previous Rev with Exception of EAL Flow Path, Side 1 & 2 & Annex H,Operations Map & Aperature Card. Changes Made by Rev,Listed ML18016B0421999-07-30030 July 1999 Informs That in Ltr Dtd 950330 CP&L Committed to Complete Assessment of Severe Accident Mgt Capabilities & Make Any Identified Enhancements by 981231.Actions Were Completed in July 1998 ML18016B0221999-07-26026 July 1999 Informs That CP&L Proposes to Provide Response to NRC 990414 RAI Re GL 95-07, Pressure-Locking & Thermal-Binding of SR Power-Operated Gate Valves, by 990930 ML18016B0171999-07-16016 July 1999 Forwards Corrected Pages to Annual Radioactive Effluent Release Rept, for 1998 for HNP ML18016B0051999-07-0101 July 1999 Informs of Scheduled Emergency Preparedness Exercise for Shnpp on 990921,per Requirements of 10CFR50,App E.List of 26 Objectives Selected for Evaluation During Exercise,Encl. Without Encl ML20212H7741999-06-23023 June 1999 Responds to Re Petition Filed by Orange County Board of Commissioners Re Proposed Expansion of Sf Storage Capacity at Shearon Harris Npp.Public Meeting Will Be Held at Later Date.With Certificate of Svc.Served on 990624 ML18016A9871999-06-14014 June 1999 Forwards Response to NRC 990429 RAI Re License Amend Request to Place Spent Fuel Pools C & D in Service,Dtd 981223.Info Does Not Change Initial Determination That Proposed License Amend Represents No Significant Hazards Consideration ML18016A9831999-06-10010 June 1999 Submits Notification That Reactor Operator Licensed at HNP Has Terminated Employment with Cp&L.Reactor Operator Info Encl.Effective 990528,individuals License Is No Longer Required & CP&L Requests That License Be Terminated ML20212H7521999-06-0404 June 1999 Encourages NRC to Schedule Open Public Forum Which Would Allow Local Citizens to Express Concerns Re Proposed Expansion of high-level Radwaste Storage Capacity at Shearon Harris Npp.With Certificate of Svc.Served on 990624 ML18016A9721999-05-28028 May 1999 Responds to 990309 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. ML18016B0011999-05-26026 May 1999 Forwards Ltr Received from Hj Jaffe Expressing Concern Re Cpl Proposal to NRC on Dec of 1998 to Make Harris Nuclear Plant Largest Storage Area for High Level Nuclear Waste in Nation ML18016A9631999-05-25025 May 1999 Forwards Periodic Update to FSAR for Hnp.Amend 49 Is Current Through 981128 (End of RFO 8).Some Changes & Analysis Completed After 981128 Have Also Been Included in Amend ML20206R2511999-05-19019 May 1999 Responds to Addressed to Chairman Jackson Requesting That NRC Grant Standing to Orange County Board of Commissioners in Shearon Harris Proceeding Currently Before Board.With Certificate of Svc.Served on 990519 ML20206Q5281999-05-17017 May 1999 Responds to 990304 Request for Two Rail Routes to Be Used for Transport of Spent Fuel from Brunswick Steam Electric Plant,Southport,Nc & Hb Robinson Steam Electric Plant, Hartsville,Sc to Shearon Harris Npp,Near New Hill,Sc ML18016A9511999-05-13013 May 1999 Submits Info Re Estimated Effect of Change to ECCS Evaluation Model,As Required by 10CFR50.46 ML18016A9601999-05-11011 May 1999 Forwards Resolution Adopted by Carrboro Board of Aldermen at 990504 Meeting.Resolution Expresses Town Concern Re Util Plans to Double high-level Nuclear Waste Storage at Shnpp ML18016A9481999-05-0606 May 1999 Forwards NRC Form 396, Certification of Medical Examination by Facility Licensee, for Senior Reactor Operator Licensed to Operate Hnp.Individuals Info Is Proprietary & Is Being Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20206R2611999-05-0505 May 1999 Requests That NRC Grant Standing to Intervention Sought by Orange County Board of Commissioners Re Proposal by CP&L to Expand Storage of Hlrw at Shnpp.With Certificate of Svc. Served on 990519 ML18016A9451999-05-0404 May 1999 Provides Proprietary Notification That One SRO Has Been Reassigned from Position for Which Util Certified Need for SRO License & Another SRO Has Terminated Employment with Util.Proprietary Info Withheld,Per 10CFR2.790(a)(6) ML18016A9441999-05-0404 May 1999 Notifies NRC of Util Completion of Actions Re GL 96-01, Testing of Safety-Related Logic Circuits at Plant ML18016A9351999-04-30030 April 1999 Forwards Info Requested in 990324 RAI as Suppl to 981223 Application for Amend to License NPF-63 for Alternative Plan for Spent Fuel Pool Cooling & Cleanup Sys Piping ML18016A9311999-04-30030 April 1999 Forwards Annual Radioactive Effluent Release Rept for Jan- Dec 1998 & Rev 11 to ODCM for Shnpp HNP-99-068, Forwards Rev 0 to Physical Security & Safeguards Contingency Plan. Description of Changes Provided.Encl Withheld1999-04-28028 April 1999 Forwards Rev 0 to Physical Security & Safeguards Contingency Plan. Description of Changes Provided.Encl Withheld ML18016A9211999-04-27027 April 1999 Provides Rev 2 to ISI Relief Request 2RG-008, ISI of Class 1,2 & 3 Snubbers (Code Category F-A) Per Plant TS in Lieu of ASME Code Section XI, in Response to 990408 Telcon with NRC ML18016A9221999-04-27027 April 1999 Forwards Proprietary Notification That SRO Licensed on Shnpp Has Terminated Employment with Cp&L,Per 10CFR50.74(b). Proprietary Info Withheld,Per 10CFR2.790(a)(6) ML18016A9161999-04-22022 April 1999 Forwards Proprietary NRC Form 396, Certification of Medical Exam by Facility Licensee, for SRO Licensed to Operate Hnp. License for Individual Should Be Amended IAW Change Noted on Form.Proprietary Encl Withheld,Per 10CFR2.790(a)(6) ML18016A9201999-04-20020 April 1999 Informs of HNP Personnel Changes to Facilitate Proper Distribution of Correspondence.Records Should Be Updated to Reflect Noted Change ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR ML18016A9121999-04-12012 April 1999 Forwards Diskette Containing Data Re Annual Exposure Rept for Individual Monitoring for Personnel Shnpp,Per 10CFR20.2206(b).Without Encl ML18016A9021999-04-12012 April 1999 Forwards Rev 34 to PLP-201, Shearon Harris NPP Emergency Plan, Replacing All Pages of Previous Rev with Exception of EAL Flow Path,Side 1 & 2 & Annex H Operations Map & Aperture Card.Changes,Listed.Rev Summary,Encl IR 05000400/19982011999-04-12012 April 1999 Discusses Safeguards Insp Rept 50-400/98-201 (Operational Safeguards Response Evaluation) on 980908-11.No Violations Noted.Licensee Performance During Evaluation Indicated Excellent Overall Contingency Response Capability 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML18017A9241999-10-15015 October 1999 Provides Supplemental Info Re 981223 Lar,Placing Plant Spent Fuel Pools 'C' & 'D' in Service.Info Provided Does Not Change Util Initial Determination That Proposed License Amend Represents No Significant Hazards Consideration ML18017A9141999-10-12012 October 1999 Forwards Addl Info Re Second 10-year ISI Program Plan Relief Requests,As Requested During 990923 Telcon ML18017A9131999-10-0606 October 1999 Provides Notification That Three SROs Licensed at Shnpp Have Been Reassigned from Position for Which Util Previously Certified Need for SRO License.Name,Docket Number & License Number for Subject Sros,Encl.Encl Withheld ML18017A8911999-09-30030 September 1999 Submits Comment on Encl 2 to 990617 Memo Titled Summary of Meeting with Nuclear Energy Inst. Encl 2 Was Titled Draft Technical Study of Spent Fuel Pool Accidents for Decommissioning Plants. Rept Which Provides Info Encl Also ML20212J0741999-09-29029 September 1999 Refers to Proposed License Amend for Harris NPP Which Would Allow Licensee to Activate Two of Plant Spent Fuel Pools.Serves Copy of Orange County Second Set of Document Requests to NRC Staff,Dtd 990929.Related Correspondence ML18017A8941999-09-29029 September 1999 Forwards Response to NRC 990414 RAI Re GL 95-07, Pressure- Locking & Thermal-Binding of SR Power-Operated Gate Valves. ML18017A8881999-09-27027 September 1999 Submits Info Re Estimated Effect of Changes or Errors in ECCS Evaluation Models or in Application of Models,Per 10CFR50.46(a)(3)(ii) ML18017A8861999-09-21021 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations. ML18017A8821999-09-14014 September 1999 Provides Notification That RO Licensed on Harris Plant No Longer Meets Requirements of 10CFR50.21,effective 990826. Name,Docket Number & License Number for Individual Provided in Encl.Encl Withheld,Per 10CFR2.790(a)(6) ML18017A8651999-09-0808 September 1999 Requests Relief from Section XI,IWA-5242(a) Requirement for HNP Class 2 Bolted Connections in Borated Sys.Compliance with Requirement Would Result in Unusual Difficulty Without Compensating Increase in Level of Quality & Safety ML18017A8581999-09-0303 September 1999 Provides Response to NRC 990805 RAI Re Amend Request to Increase Fuel Storage Capacity ML18017A8551999-09-0101 September 1999 Forwards Marked Up Copy of Approved FSAR Section 17.3 with Applicable Duplicated TS Requirements,As Committed to in 990602 Application for Rev to TS ML18017A8541999-08-20020 August 1999 Submits Closure Info for Rev 1,Suppl 1 to GL 92-01, Reactor Vessel Structural Integrity. Identified Discrepancies from Review of NRC Rvid Provided HNP-99-134, Forwards Rev 11 to Physical Security & Safeguards Contingency Plan,Iaw 10CFR50.54(p)(2) & 10CFR50.4(b)(4). Description of Changes Is Provided as Encl 2 to Ltr.Rev Withheld,Per 10CFR73.211999-08-18018 August 1999 Forwards Rev 11 to Physical Security & Safeguards Contingency Plan,Iaw 10CFR50.54(p)(2) & 10CFR50.4(b)(4). Description of Changes Is Provided as Encl 2 to Ltr.Rev Withheld,Per 10CFR73.21 ML18017A8351999-08-10010 August 1999 Corrects Statement Made in 980923 Ltr,By Clarifying That Operation of Inner & Outer Pal Doors Can Be Operated by Control Panels Located Inside & Outside Containment ML18016B0531999-08-0606 August 1999 Forwards Exercise Scenario with Controller Info & Simulation Data for Harris Nuclear Plant Emergency Preparedness Exercise Scheduled for 990921.Without Encl ML18016B0461999-08-0404 August 1999 Forwards LER 99-006-01 Describing Condition Which Resulted in Exceeding TS Requirements for CIVs & TS 4.0.4 for Generic Requirements for Surveillance Testing.Rev Includes Results of Investigation Into Failure to Recognize TS Requirements ML18016B0421999-07-30030 July 1999 Informs That in Ltr Dtd 950330 CP&L Committed to Complete Assessment of Severe Accident Mgt Capabilities & Make Any Identified Enhancements by 981231.Actions Were Completed in July 1998 ML18016B0391999-07-30030 July 1999 Forwards Rev 35 to PLP-201, Emergency Plan. Rev Replaces All Pages of Previous Rev with Exception of EAL Flow Path, Side 1 & 2 & Annex H,Operations Map & Aperature Card. Changes Made by Rev,Listed ML18016B0221999-07-26026 July 1999 Informs That CP&L Proposes to Provide Response to NRC 990414 RAI Re GL 95-07, Pressure-Locking & Thermal-Binding of SR Power-Operated Gate Valves, by 990930 ML18016B0171999-07-16016 July 1999 Forwards Corrected Pages to Annual Radioactive Effluent Release Rept, for 1998 for HNP ML18016B0051999-07-0101 July 1999 Informs of Scheduled Emergency Preparedness Exercise for Shnpp on 990921,per Requirements of 10CFR50,App E.List of 26 Objectives Selected for Evaluation During Exercise,Encl. Without Encl ML18016A9871999-06-14014 June 1999 Forwards Response to NRC 990429 RAI Re License Amend Request to Place Spent Fuel Pools C & D in Service,Dtd 981223.Info Does Not Change Initial Determination That Proposed License Amend Represents No Significant Hazards Consideration ML18016A9831999-06-10010 June 1999 Submits Notification That Reactor Operator Licensed at HNP Has Terminated Employment with Cp&L.Reactor Operator Info Encl.Effective 990528,individuals License Is No Longer Required & CP&L Requests That License Be Terminated ML20212H7521999-06-0404 June 1999 Encourages NRC to Schedule Open Public Forum Which Would Allow Local Citizens to Express Concerns Re Proposed Expansion of high-level Radwaste Storage Capacity at Shearon Harris Npp.With Certificate of Svc.Served on 990624 ML18016A9721999-05-28028 May 1999 Responds to 990309 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. ML18016B0011999-05-26026 May 1999 Forwards Ltr Received from Hj Jaffe Expressing Concern Re Cpl Proposal to NRC on Dec of 1998 to Make Harris Nuclear Plant Largest Storage Area for High Level Nuclear Waste in Nation ML18016A9631999-05-25025 May 1999 Forwards Periodic Update to FSAR for Hnp.Amend 49 Is Current Through 981128 (End of RFO 8).Some Changes & Analysis Completed After 981128 Have Also Been Included in Amend ML18016A9511999-05-13013 May 1999 Submits Info Re Estimated Effect of Change to ECCS Evaluation Model,As Required by 10CFR50.46 ML18016A9481999-05-0606 May 1999 Forwards NRC Form 396, Certification of Medical Examination by Facility Licensee, for Senior Reactor Operator Licensed to Operate Hnp.Individuals Info Is Proprietary & Is Being Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20206R2611999-05-0505 May 1999 Requests That NRC Grant Standing to Intervention Sought by Orange County Board of Commissioners Re Proposal by CP&L to Expand Storage of Hlrw at Shnpp.With Certificate of Svc. Served on 990519 ML18016A9451999-05-0404 May 1999 Provides Proprietary Notification That One SRO Has Been Reassigned from Position for Which Util Certified Need for SRO License & Another SRO Has Terminated Employment with Util.Proprietary Info Withheld,Per 10CFR2.790(a)(6) ML18016A9441999-05-0404 May 1999 Notifies NRC of Util Completion of Actions Re GL 96-01, Testing of Safety-Related Logic Circuits at Plant ML18016A9351999-04-30030 April 1999 Forwards Info Requested in 990324 RAI as Suppl to 981223 Application for Amend to License NPF-63 for Alternative Plan for Spent Fuel Pool Cooling & Cleanup Sys Piping ML18016A9311999-04-30030 April 1999 Forwards Annual Radioactive Effluent Release Rept for Jan- Dec 1998 & Rev 11 to ODCM for Shnpp HNP-99-068, Forwards Rev 0 to Physical Security & Safeguards Contingency Plan. Description of Changes Provided.Encl Withheld1999-04-28028 April 1999 Forwards Rev 0 to Physical Security & Safeguards Contingency Plan. Description of Changes Provided.Encl Withheld ML18016A9221999-04-27027 April 1999 Forwards Proprietary Notification That SRO Licensed on Shnpp Has Terminated Employment with Cp&L,Per 10CFR50.74(b). Proprietary Info Withheld,Per 10CFR2.790(a)(6) ML18016A9211999-04-27027 April 1999 Provides Rev 2 to ISI Relief Request 2RG-008, ISI of Class 1,2 & 3 Snubbers (Code Category F-A) Per Plant TS in Lieu of ASME Code Section XI, in Response to 990408 Telcon with NRC ML18016A9161999-04-22022 April 1999 Forwards Proprietary NRC Form 396, Certification of Medical Exam by Facility Licensee, for SRO Licensed to Operate Hnp. License for Individual Should Be Amended IAW Change Noted on Form.Proprietary Encl Withheld,Per 10CFR2.790(a)(6) ML18016A9201999-04-20020 April 1999 Informs of HNP Personnel Changes to Facilitate Proper Distribution of Correspondence.Records Should Be Updated to Reflect Noted Change ML18016A9121999-04-12012 April 1999 Forwards Diskette Containing Data Re Annual Exposure Rept for Individual Monitoring for Personnel Shnpp,Per 10CFR20.2206(b).Without Encl ML18016A9021999-04-12012 April 1999 Forwards Rev 34 to PLP-201, Shearon Harris NPP Emergency Plan, Replacing All Pages of Previous Rev with Exception of EAL Flow Path,Side 1 & 2 & Annex H Operations Map & Aperture Card.Changes,Listed.Rev Summary,Encl ML18016A8911999-04-0505 April 1999 Forwards non-proprietary App 4A,pages 20-25 & Proprietary Page 4-6 to re-issued Rev 3 of Holtec International Licensing Rept HI-971760.Pages Were Inadvertently Omitted from Reissued Rept.Proprietary Page 4-6 Withheld ML18016A8891999-04-0101 April 1999 Forwards Rev 99-1 to Plant EALs for NRC Review & Approval, Per 10CFR50,App E.Encl Provides Comparison of Currently Approved EALs & Proposed Rev 99-01.Approval of EALs Prior to June 1999,requested.With Four Oversize Drawings ML18016A8811999-03-31031 March 1999 Responds to NRC 990301 Ltr Re Violations Noted in Insp Rept 50-400/98-11.Corrective Actions:Post Trip/Safeguards Actuation Rept for 981023,RT Was Corrected,Required Reviews Completed & Approval Obtained on 990219 ML18016A8671999-03-19019 March 1999 Submits Response to RAI Re Spent Fuel Pool Water Level & Revised Fuel Handling Accident Analyses,Per 990317 Telcon with NRC ML18016A8631999-03-19019 March 1999 Forwards Shnpp Operator Training Simulator,Simulator Certification Quadrennial Rept, IAW 10CFR55.45(b)(5)(ii). NRC Form 474 & Required Info Re Simulator Performance Test Results & Schedules Also Encl ML18016A8691999-03-18018 March 1999 Forwards Resolution Adopted by Lee County,North Carolina Board of Commissioners Re Proposed Expansion of high-level Radioactive Waste Storage Facilities at Carolina Power & Light Shearon Harris Nuclear Power Plant ML18016A8511999-03-15015 March 1999 Forwards Proprietary & non-proprietary Version of Rev 3 to HI-971760, Licensing Rept for Expanding Storage Capacity in Harris SFPs 'C' & 'D'. Repts Are Reissued to Reflect Reduction in Proprietary Info.Proprietary Info Withheld ML18016A8601999-03-15015 March 1999 Informs NRC of Mod to Commitment for Hnp,Re Comprehensive Review of Implementation of TS Sr.Upon Completion of Listed Reviews,Surveillance Procedure Review Project Will Be Considered Complete 1999-09-08
[Table view] |
Text
r . . ,
SAFEGUARDS INFORMATION l
! l 1 . .
wwmORIZEDDISCL.OSURE SUEECT CP&L Tocn*oca=* sac =8 mrm.e0 1
Carolmo Power & Ligid co;of James 5corola I PO Box 165 Vice President j NewHill NC 27562 Harris Nuclear Plant 1
APR 2 61999 1 SERIAL: HNP-99-068 10 CFR 50.4 (b)(4) j l United States Nuclear Regulatory Commission l
ATTENTION: Document Control Desk l Washington, DC 20555 l
SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/ LICENSE NO. NPF-63 SUBMITTAL OF REVISION 0 TO THE PHYSICAL SECURITY AND SAFEGUARDS CONTINGENCY PLAN !
Dear Sir or Madam:
In accordance with 10 CFR 50.54 (p)(2) and 10 CFR 50.4 (b)(4), Carolina Power & Light Company is providing Revision 0 of the " Physical Security and Safeguards Contingency Plan" for the Harris Nuclear Plant. A copy of the Physical Security and Safeguards Contingency Plan is being provided as Enclosure 1 to this letter. A description of the changes is provided as Enclosure 2 to this letter. l The changes to the Physical Security and Safeguards Contingency Plan include: (1) administrative changes to clarify existing utles and to correct grammar,(2) changes to reflect revisions to 10 CFR 73.55, (3) increases the minimum number of armed guards / armed responders on shift, (4) converts the Physical Security and Safeguards Contingency Plan to a site specific versus a two site generic plan and deletes references to the Brunswick Nuclear Plant, and (5) added the use of coiled razor wire on top of the Protected Area Fence and the use of razor concertina ribbon in the isolation zone. The enclosed revision does not decrease the effectiveness of the plan or the level of security provided.
Enclosure I contains Safeguards Information and requires protection in accordance with 10 CFR 73.21. When separated from Enclosure 1, handle this cover letter and Enclosure 2 as decontrolled.
Please refer any questions regarding this submittal to Mr. J. H. Eads, at (919) 362-2646, or Mr. D. A. Braund at (919) 362-2065.
. i n '.- /} d
!. MIEN SEPI. RATED FROM ENCLO2ttES, Sin erely*
HDiCLE THIS Docunf.ENT i AS DECONTROLLEO.
) (
SAFEGUARDS INFORMATION .
9905040271 990428 PDR ADOCK 05000400 F PDR M13 Sheoron Harris Road New Hill, NC Tel 919 362-2502 Fox 919 362 2095
Document Control Desk tillEN SCP/MTED FROM ThC10S'JRES.
, SERIAL: HNP-99-068 ut.FDLE Tills 00CWUli
. . AS DECONTROLLED MGW i
Enclosures:
l I. Physical Security and Safeguards Contingency Plan, Revision 0 (SAFEGUARDS i INFORMATION) i
- 2. Description of Physical Security and Safeguards Contingency Changes !
c: Mr. J. B. Brady (NRC Senior Resident Inspector, HNP) w/o Enclosures Mr. Rich Laufer (NRR Project Manager, HNP) w/o Enclosures Mr. L. A. Reyes (NRC Regional Administrator, Region II) with Enclosures i l
l 1
-- Document Control Desk 3.s mtmiED FROM Ehtt0 JJRES, SERIAL: HNP-99-065 HI.FDti THIS D00tWEUT
. AS DECONTROLLED s
. . Enclosure 2 Description of Physical Security and Safeeuards Contineency Channes J
Physical Security and Safeguards Contingency Plan, Revision 0.
. . The revisions in items 8,10,16,18,21,22,23,26,27,28,29,30,3132,33,34,35,36, and 37 are administrative or clerical in nature to clarify titles for consistency and correct grammar. ;
- The purpose of the revision in items 1,2,3,4, and 5, are to change the plan from a generic plan applicable to both the Brunswick and Harris Nuclear Plants to a site specific plan and delete all references to the Brunswick Plant.
e The purpose of the revision in item 6 is to change (increase) the minimum number of Armed Guards / Responders per shift, e The purpose of the revision in item 7 is to clarify existing titles and restrict duties to alarm monitoring.
- The purpose of the revision in item 9 is to funherjustify the minimum number of Armed Guards / Responders per shift.
- The purpose of the revision in item 11 is because it was redundant with paragraph 6.1.
e The purpose of the revision in item 12 is to show the addition of razor ribbon to the top of the Protected Area Fence.
- The purpose of the revision in item 13 is to further identify the location at the Emergency Service Water Screening structure.
- The purpose of the revision in item 14 is to describe the addition of the razor concenina ribbon in the isolation zones.
. . The purpose of the revision in item 15 is to add an additional means of recording access.
- The purpose of the revision in items 17 and 19 are to reflect revisions to 10 CFR 73.55 as indicated.
- The purpose of the mvision in item 20 is to allow 5 working days for removal of unescorted access authorization of favorably terminated or those that no longer require unescorted access.
- ' The purpose of the revision in item 24 is to delete the requirement for search of vehicles and equipment that have been escorted and observed by a member of the security force when-moving from one Protected Area to another Protected Area, e The Purpose of the revision in item 25 is to delete the requirement for search of hand carried items of personnel that are escorted and under observation by a member of the security force when moving from one Protected Area to another Protected Area.
Summary Matrix - Revision 0 hem No. Referenced Para Summary 1 Cover Page . Changed Carohna Power & Light Company to Hams Nuclear Plant and deleted the approval hnes for Director . ;
Nuclear Security and superintendent . security BNP .
Revision 0 converts the PssCP to a site specific plan rather than a two site generic plan. Changed all revision '
numbers to 0.
2 10 Para 1,2 & 3 Deleted paragraphs I. 2 and 3 which refer to the two site generic plan and BNP specifics ;
3 1.0 [)elete General Arrangement and Site PkW Plan Drawings for HNP 4 10 Last sentence: Change "Each Site" to "The Site's" and delete "for each plant".
5 2.0 . Delete " Brunswick and" change " Plants to Plant".
I 1- '
Document Control Desk l SERI AL: HNP-99-065
- 6 3.1 para 1 & 2 Combined into I paragraph with these changes: Change " armed and unarmed secunty officers" to " armed and unarmed members secunty force". Ciianged the number of Armed MSF's and deleted " guards".
7 31 para 3 Added "(CAS)" and changed " Armed Secunty Officer" to "MSF" Added "The MSF shall have no other duties other than alarm tnonitoring "
8 3.1 para 4 Added "(S AS)" and changed "Secunty Officer" to "MSF" 9 3 I para 5 Added sub paragraphs k and I.
10 3 2 para 2 Changed " Support Analyst (s) Security" to "Secunty Staff Member available" l
I1 3 3 para 2 Deleted para hecause it was repeated in paragraph 61 l
12 4 I para 2 Added the followmp sentence " Additionally, the Protected Area Rarner is equipped with coiled razor wire "
i 13 4.31 para 1 Added " West side" before Emergency Service Water l
14 4 3 I para 2 Added "ra7or concertina nbbon" 15 51.2 para 1. sub para 3 Added "or the secunty computer record" after authonred access list l 16 51.2 para 2 Added "except as noted in Sections 7 0 and 7.3" 17 5.3 para 3 Deleted " Cores for secunty locks used for Protected and Vital Areas shall be changed or rotated at least once each 12 months." On December 2,1997, the NRC published a final rule in the Federal Register which revised 10CFR l 73 55(d)(8) This revision deleted the requirement for changing or rotating security locks every twelve months.
l 18 5.3 I para 2 Changed " badge" to " card reader card" d
19 6.2.1 para I Changed 2 sentence to read "A current access list for vital areas must be updated at least once every 31 days and l must be reapproved by the cognizant licensee manager or supervisor at least quarterly". On December 2,1997,the NRC published a final rule in the Federal Register which revised 10CFR 73.55(d)(7)(1)( A). This revision changed the requirement toreapprove the list once ewry 31 days to quarterly. j 20 6.2.1 para I Changed the fourth sentence to read: " Personnel whose employment is termmated or who no longer require I unescorted access are removed from unescorted access authorization within five (5) working days " l 21 6 3 2 para 5 1" sentence - deleted " preferably in the vic nity of the collar at chest / shoulder height."
22 64 Changed " Owner-Controlled Area" to Owne Fontrolled Exclusion Area (OCEA) throughout 23 642 Added " testing" to last sentence.
24 7.0 para 1 Changed " point of ongm" to "arca of search." Added sentence " Vehicles that are being moved from within one Protected Area to another Protected Area will not require search provided that the vehicle is escorted by a member of the security force "
l 25 7 0 8 para 2 Deleted "At HNP" and added after Other personnel"and their hand carned items" 26 7.1.1 para 4 Changed 7" sentence to read: "T1us annunciauon provides immediate nouficauon of the use of a lost / stolen card to the Central and Secondvy Alarm Station Operators. The Central Alarm Station Operator evaluates the annunciation and promptly dispatches an armed response."
27 7.1.1 para 6 Added "Under emergency condiuons personnel will be pat down searched and idenuficauon venfied by an MSF with an Access List or via the CAS/SAS".
28 7.1.1 para 6 Changed last sentence to read. " Individuals granted unescorted access who require passage shall have been previously processed through hand geometrv readers and caid readers prior to entry "
29 7 2 sub para I (2) changed to read: "the packages and matenal are under the observation of an armed secunty officer, and (3) the packages and materials for other consiences are not unloaded in the Protected Area "
30 8.3 4 para 1 Last sentence changed to read " Backup power is supplied by a dedicated diesel generator that annunciates in the CAS*
31 12.2.1 para 1 Changed TP&L's nuclear plants" to "De Harns Nuclear Pl?nt (HNP)"," undesirable" to "senous adverse" and added
- safeguards" after " comprehensive".
32 12.2.1 sub para 1(d) Changed to read: " hand carned equipment includmg incapacitating agents and explosives for use as tools or entry or for otherwise destroying reactor and facility, transporter, or container integnty or features of the safeguards system."
33 12.2 2 Changed " Purpose of the Contingency Plan" to " Purpose of the Safeguards Contingency Plan" 34 12.2 3 Changed
- Scope of the Contmgency Plan" to " Scope of the Safeguards Contmgency Plan" 35 12.2.5 2" sentence changed to read "Not covered m the Safeguards Conungency Plan are acuons to be implemented m the event of successful sabotage which results in radiological release "
36 12.3 Changed to read. " Wake County Shenff's Department (WCSD)- The pnmary law enforcement junsdicuon for the area in which the plant is located is the WCSD. A letter of understanding / agreement has been reached with the WCSD This letter of understanding is renewed, when appropr ate, i and maintained on site "
37 Glossary and Terms Change OCA Owner Controlled Area to OCEA Owner Controlled Exclusion Area WliEN SEP/EED FROM D,007)REi H/SDLE TH.S 000W,EUT AS DKONTROLLED 2