ML18017A886

From kanterella
Jump to navigation Jump to search
Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations.
ML18017A886
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/21/1999
From: Alexander D
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-. AL-99-03, HNP-99-143, NUDOCS 9909280235
Download: ML18017A886 (5)


Text

CATEGORY 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9909280235 DOC.DATE: 99/09/21 NOTARIZED: NO DOCKET FA~<IQ:40-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH;NAME AUTHOR AFFILIATION ALEXANDER,D.B. Carolina Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)

SUBJECT:

Forwards response to NRC Administrative Ltr 99-03, "Preparation & Scheduling of Operator Licensing Examinations."

DISTRIBUTION CODE: N003D COPIES RECEIVED:LTR TITLE: Operator Recpxalification Program I ENCL L SIZE:

NOTES:Application for permit renewal filed. 05000400 E RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL 0 LAUFER,R. 1 1 R

INTERNAL: ACRS 1 1 FILE CENTER 0 1 1 NRR/DIPM/OLHP 1 1 RGN2 1 1 EXTERNAL: NOAC. 1 1 NRC PDR 1 1 D

5IÃBI8$5 M

'E NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, DISTRIBUTION LISTS CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF. COPIES REQUIRED: LTTR 7 ENCL 7

Carolina Power 4 Ught Company Harris Nuclear Plant PO Box 165 New Hill NC 27562 SERIAL: HNP-99-143 SEP 31 1999 United States Nuclear Regulatory Commission AITENTION: Document Control Desk Washington, DC 20555-0001 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 RESPONSE TO NRC ADMINISTRATIVELETTER 99-03, PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS Dear Sir or Madam Carolina Power & Light Company hereby submits a response to NRC Administrative Letter 99-03, "Preparation and Scheduling'of Operator?;icensing Examinations," for the Harris Nuclear Plant (HNP). The enclosed NRC Foim 536; Operator Licensing Examination Data, has been completed for HNP and indicates the proposed examination preparation schedule, initial operator license examinations, and proposed generic fundamentals examination schedule for the time period requested.

Questions regarding this matter may be referred to Mr. Mark Keef at (919) 362-3332.

Sincerely, D. B. Alexander Manager, Regulatory Affairs Harris Nuclear Plant MGW

<1 Enclosure rgspt()O N

QQQQ c: Mr. J. B. Brady (NRC Senior Resident Inspector, HNP)

Mr. H O. Christensen (Chief, Operator Licensing and Human Performance Branch, RII),

Mr. Rich Laufer (NRR Project Manager, HNP)

Mr. L. A. Reyes (NRC Regional Administrator, Region II) 9909280235 9'7092 ADOCK i

05000400I,'DR V PDR ~r~ ~ ~ onearon narris Road New Hill NC

Attachment 1 AL 99-03 NRG FORM 536 U.S NUCLEAR REGULATORY COMMISSION APPROVED BY OMB NO 3150-0131 EXPIRES 07/3I/2002 (7-1999) Estimated burden per response to comply with this vofuntaty information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This Information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records Management Branch (TW E6) U S Nudear OPERATOR LICENSING Renufatoty Commission, Washington, DC 205554001 or by internet email to n)stonrc.oov, and to the Desk Officer, Office of Information and EXAMINATIONDATA Rea~ulatotv Affairs, NEOB.10202, (31500131), Office of Management and Budget Washington DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Harris Nuclear Plant A. PROPOSED EXAMINATIONPREPARATION SCHEDULE PROPOSED NUMBER CY 2000 CY 200'I CY 2002 CY 2003 ESTIMATED NUMBER OF 1 combined RO none 1 combined RO none LICENSEE-PREPARED EXAMINATIONS and SRO and SRO B. INITIALOPERATOR LICENSING EXAMINATIONS PROPOSED NUMBER CY 2000 CY 2001 CY 2002 CY 2003 NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS-INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS-LIMITED PROPOSED DATES week of week of N/A PRIMARY DATE December 11, 2000 June 24, 2002 week of N/A week of N/A ALTERNATE DATE December 4, 2000 July 16, 2002 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION(GFE) SCHEDULE CY 2000 CY 2001 PROPOSED NUMBER FIRST SECOND FIRST SECOND ESTIMATED NUMBER OF CANDIDATES 0 0 0 NRC FORM 538 (7.1999) PRINTED ON RECYCLED PAPER THIS FORM WAS DESIGNED USING INFORMS

0 O.

fa