l
SAFEGUARDS INFORMATION-
.
.
OCT131999
I
Docket No. 50-400
License No. NPF-63
a
Carolina Power and Light Company
ATTN: Mr. E. E. Utley
Senior Executive Vice Fresident
Power Supply and Engineering
!
and Construction
!
P. O. Box 1551
i
Raleigh, NC 27602
SARGUARDS NORMAD0tl RB'0WD
L
Gentlemen:
SUBJECT: NRC INSPECTION REPORT NO. 50-400/88-37
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted
1
by J. D. Ennis on September 26-30, 1988.
The inspection' included a review of
activities authorized for your Shearon Harris facility. At'the conclusion of
4
the inspection, the findings were discussed with those members of your staff
f
'
identified in the en-losed inspection report.
,
i
Areas examined d' iring the inspection are identified in the report. Within
l
1
these areas, the inspection consisted of selective examinations of procedures
!
and representative records, interviews with personnel, and observation of
,
!
activities in progress.
r
!
i
i
The inspectic., findings indicate that certain activities appeared to violate
i
NRC requirements. The violations described in the enclosed Inspection Report
!
j
are under consideration for escalated enforcement action.
Accordingly, no
I
Notice of Violation is being issued at this time, and no response to this
!
letter is required. However, please be advised that the number and character-
i
ization of violations described in the enclosed Inspection Report may change as
a result of further NRC review. An Enforcement Conference to discuss these
!
2
violations has been scheduled for November 3,1988. You will be advised by
{
,
q
separate correspondence of the results of our deliberations on this matter.
'
1
-
l
In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and
i
security measures are exempt from public disclosure. Therefore, the e.nclosure
!
'
to this lettir, with the exception of the report cover page, which presents a
nonexempt summary, will ny be placed in the NRC Public Document Room.
l
t
]
Should you have any ques'. ions concerning this letter, please contact us.
Sincerely,
)
-
!
l
Malcolm L. Ernst
/g
!
Acting Regional Administrator
/
Enclosure:
(See page 2)
/I
l
[
!
SS10260224 891013
% **W
h
W
7
i
DR
ADUCK 05000400
sed
!
,
- N 8**ese % '
j
er'
L
sm-t. GUARDS INFORMATION-
"% %
!
- - - - - - - - - - - - - --
- --
-
f5'
SAFEGUARDS INFORMATION-
0071.3 403g
~
l
'. . . .
.
..
Carolina Power and Light Company
2
Enclosuie:
NRC Inspection Report
(SafeguardsInfermation)
cc w/snel:
R. A. Watson, Vice President
Harris Nuclear Project
D. L. Tibbitts, 01 rector of Regulatory
Compliance
C. S. Hinnant, Plant General Manager
cc w/ Inspection Summary:
State of North Carolina
bec w/ enc 1:
NRR/DRIS/SB
B. Murray, RIV
bec w/ Inspection Summary:
C. Barth, OGC
NRC Resident Inspector
A. Upchurch, Chairman, Triangle J
Council of Governments
ORS. Technical Assistant
Document Control Desk (RIOS IE 04), 016
f
R
RI
' g
.
RII
RII
.
Ennis:tj
DMcGuire
I
line
dCollins
B arroll
10/4/88
10/j/88
10///' /88
10// J /88
10////88
Dxument kernmeed hereith
4
cuwent wstw ure3essfies
RII
RII
RII
RII
m w e on*d bem
g
g ,'
en.eu cocumeai sim !
PFr r clsoc
DVer alli
LRey h
GJe
ns
JS{ r
'. M
10/g)/88
10/ p /08
10/((/88
10/ti/88
10/j 2d88
,,j,y
SAFEGUARDS INFORMATION
L