Forwards Insp Rept 50-400/88-37 on 880926-30.Violations Noted Under Consideration for Escalated Enforcement Action
ML20205B338
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/13/1988
From: Ernst M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML20205B345 List:
References
NUDOCS 8810260224
Download: ML20205B338 (2)


See also: IR 05000400/1988037

Text

_- _ _ . - - - _ _- - . . ._

t

l

. .

SAFEGUARDS INFORMATION-

I

OCT131999

Docket No. 50-400

License No. NPF-63

a

Carolina Power and Light Company

ATTN: Mr. E. E. Utley

Senior Executive Vice Fresident

Power Supply and Engineering  !

and Construction  !

P. O. Box 1551 i

L

Raleigh, NC 27602 SARGUARDS NORMAD0tl RB'0WD

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NO. 50-400/88-37

1 This refers to the Nuclear Regulatory Commission (NRC) inspection conducted

by J. D. Ennis on September 26-30, 1988. The inspection' included a review of

4

activities authorized for your Shearon Harris facility. At'the conclusion of

'

the inspection, the findings were discussed with those members of your staff f

identified in the en-losed inspection report. ,

i

l

Areas examined d' iring the inspection are identified in the report. Within

1 these areas, the inspection consisted of selective examinations of procedures  !

and representative records, interviews with personnel, and observation of ,

! activities in progress. r

! i

i The inspectic., findings indicate that certain activities appeared to violate i

NRC requirements. The violations described in the enclosed Inspection Report  !

j are under consideration for escalated enforcement action. Accordingly, no I

Notice of Violation is being issued at this time, and no response to this

! letter is required. However, please be advised that the number and character-

i ization of violations described in the enclosed Inspection Report may change as

2

a result of further NRC review. An Enforcement Conference to discuss these  !

,

violations has been scheduled for November 3,1988. You will be advised by {

q separate correspondence of the results of our deliberations on this matter. '

1 -

l In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and  ;

i security measures are exempt from public disclosure. Therefore, the e.nclosure  !

'

to this lettir, with the exception of the report cover page, which presents a  ;

nonexempt summary, will ny be placed in the NRC Public Document Room. l

t

] Should you have any ques'. ions concerning this letter, please contact us.

Sincerely,

) -

!  !

l Malcolm L. Ernst

Acting Regional Administrator /

/g  !

Enclosure: (See page 2) /I l [

SS10260224 891013 W

% **W

! 7

h i

,

DR ADUCK 05000400 sed  !

j PDC er' * N 8**ese % ' L

sm-t. GUARDS INFORMATION- "% %  !

-

f5'

'. . . . SAFEGUARDS INFORMATION-

~ l

0071.3 403g

.. .

Carolina Power and Light Company 2

Enclosuie:

NRC Inspection Report

(SafeguardsInfermation)

cc w/snel:

R. A. Watson, Vice President

Harris Nuclear Project

D. L. Tibbitts, 01 rector of Regulatory

Compliance

C. S. Hinnant, Plant General Manager

cc w/ Inspection Summary:

State of North Carolina

bec w/ enc 1:

NRR/DRIS/SB

B. Murray, RIV

bec w/ Inspection Summary:

C. Barth, OGC

NRC Resident Inspector

A. Upchurch, Chairman, Triangle J

Council of Governments

ORS. Technical Assistant

Document Control Desk (RIOS IE 04), 016

f

R RI

'

g .

RII RII .

Ennis:tj DMcGuire I line dCollins B arroll

10/4/88 10/j/88 10///' /88 10// J /88 10////88

Dxument kernmeed hereith

4

cuwent wstw ure3essfies

RII PII RII RII RII m w e on*d bem

g g ,'  ;

en.eu cocumeai sim !

PFr r clsoc DVer alli LRey h GJe ns JS{ r '. M

10/g)/88 10/ p /08 10/((/88 10/ti/88 10/j 2d88 ,,j,y

SAFEGUARDS INFORMATION

L