ML20205S204
| ML20205S204 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 03/31/1987 |
| From: | Reyes L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Utley E CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML20205S208 | List: |
| References | |
| NUDOCS 8704060545 | |
| Download: ML20205S204 (2) | |
See also: IR 05000400/1987008
Text
-
.a
SAFEGUARDS INFORMAiiON
MAR 311987
Docket No. 50-400
License No. NPF-53
Carolina Power and Light Company
ATTN:
Mr. E. E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P. O. Box 1551
Raleigh, NC 27602
Gentlemen:
SUBJECT: NOTICE OF VIOLATION
(NRC INSPECTION REPORT NO. 50-400/87-08)
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
Ms. C. D. Perny on February 9-13, 1987. The inspection included a review of
activities authorized for your Shearon Harris facility. At the conclusion of
the inspection, the findings were discussed with those members of your staff
identified in the enclosed 1.ispection report.
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
[
The inspection findings indicate that certain activities appeared to violate
NRC requirements.
The violation, references to pertinent requirements, and
';
elements to be included in your response are described in the enclosed Notice
of Violation.
In addition to the need for corrective action regarding the specific matters
,
identified in the enclosed Notice, we are concerned about the implementation of
your Security Program that permitted this situation to develop. Consequently,
your response should describe those particular actions taken or planned to
improve the effectiveness of your program.
In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and
security measures are exempt from public disclosure; therefore, the enclosures
to this letter, with the exception of the report cover page which presents a
nonexempt summary, will not be placed in the NRC Public Document Room,
The responses directed by this letter and its enclosures are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
ENCLOSURE CONTAINS
GAFEGUARDS INPCRifATIO
3AFEGUARDS INFORMATION Rg;7Agt;ong'
8704060545 870331
ADOCK 05000400
E
{
&
%FEGUARDS INFORMATION
e
g 7 } *g @
Carolina Power and Light Company
2
Should you have any questions concerning this letter, please contact us.
Sincerely,
Original Signed by
Luis A. Reyes
Luis A. Reyes, Director
Division of Reactor Projects
Enclosures:
1.
(Safeguards Information)
2.
NRC Inspection Report
(Safeguards Information)
cc w/encls:
R. A. Watson, Vice President
Harris Nuclear Project
D. L. Tibbitts, Director of Regulatory
Compliance
J. L. Willis, Plant General Manager
bec w/encls:
C. Barth, OGC
J. Moore, OGC
IE File
NMSS/SGPL
NRR/DL/SSPB
bec w/ Inspection Summary:
Document Control Desk, 016
NRC Resident Inspector
State of North Carolina
,
RII
RII
er
uire
Cline
JS h
03/
87
QJg/87
03/ 2 087
as/27/87
O
RI
US4%
RII^ 4
$ctPFredric(~en
$<n
.
,
D.
errelli
G'Jen ns
'
0$/ / /87
['Flo3URE coNrarns
03 0-)/87
OW3u 87
r
3
q
>^FEGUARD3 yggyggy,TI
Ubo:t Scppngyny Ty 3
" ^ " '
SAFEGUARDS INFORMA f loN
Sco"raouro