Forwards Insp Rept 50-400/87-08 on 870209-13 & Notice of Violation.Concern Re Implementation of Security Program Expressed.Notice of Violation Withheld (Ref 10CFR2.790 & 73.21)
ML20205S204
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 03/31/1987
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML20205S208 List:
References
NUDOCS 8704060545
Download: ML20205S204 (2)


See also: IR 05000400/1987008

Text

-

.a

SAFEGUARDS INFORMAiiON

MAR 311987

Docket No. 50-400

License No. NPF-53

Carolina Power and Light Company

ATTN:

Mr. E. E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. O. Box 1551

Raleigh, NC 27602

Gentlemen:

SUBJECT: NOTICE OF VIOLATION

(NRC INSPECTION REPORT NO. 50-400/87-08)

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

Ms. C. D. Perny on February 9-13, 1987. The inspection included a review of

activities authorized for your Shearon Harris facility. At the conclusion of

the inspection, the findings were discussed with those members of your staff

identified in the enclosed 1.ispection report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

[

The inspection findings indicate that certain activities appeared to violate

NRC requirements.

The violation, references to pertinent requirements, and

';

elements to be included in your response are described in the enclosed Notice

of Violation.

In addition to the need for corrective action regarding the specific matters

,

identified in the enclosed Notice, we are concerned about the implementation of

your Security Program that permitted this situation to develop. Consequently,

your response should describe those particular actions taken or planned to

improve the effectiveness of your program.

In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and

security measures are exempt from public disclosure; therefore, the enclosures

to this letter, with the exception of the report cover page which presents a

nonexempt summary, will not be placed in the NRC Public Document Room,

The responses directed by this letter and its enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

ENCLOSURE CONTAINS

GAFEGUARDS INPCRifATIO

3AFEGUARDS INFORMATION Rg;7Agt;ong'

8704060545 870331

PDR

ADOCK 05000400

E

{

&

%FEGUARDS INFORMATION

e

g 7 } *g @

Carolina Power and Light Company

2

Should you have any questions concerning this letter, please contact us.

Sincerely,

Original Signed by

Luis A. Reyes

Luis A. Reyes, Director

Division of Reactor Projects

Enclosures:

1.

Notice of Violation

(Safeguards Information)

2.

NRC Inspection Report

(Safeguards Information)

cc w/encls:

R. A. Watson, Vice President

Harris Nuclear Project

D. L. Tibbitts, Director of Regulatory

Compliance

J. L. Willis, Plant General Manager

bec w/encls:

C. Barth, OGC

J. Moore, OGC

IE File

NMSS/SGPL

NRR/DL/SSPB

bec w/ Inspection Summary:

Document Control Desk, 016

NRC Resident Inspector

State of North Carolina

,

RII

RII

CDP

er

uire

Cline

JS h

03/

87

QJg/87

03/ 2 087

as/27/87

O

RI

US4%

RII^ 4

$ctPFredric(~en

$<n

.

,

D.

errelli

G'Jen ns

'

0$/ / /87

['Flo3URE coNrarns

03 0-)/87

OW3u 87

r

3

q

>^FEGUARD3 yggyggy,TI

Ubo:t Scppngyny Ty 3

" ^ " '

SAFEGUARDS INFORMA f loN

Sco"raouro