IR 05000400/1986052

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-400/86-52 on 860618-19.No Violations or Deviations Identified
ML20202J702
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 07/14/1986
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML20202J706 List:
References
NUDOCS 8607170131
Download: ML20202J702 (2)


Text

,

~

car,m...- u vn e i u unn ua u v. - -rvalVIA I iud JUL 141986 Docket No. 50-400 License No. CPPR-158 Carolina Power and Light Company ATTN: Mr. E. E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. O. Box 1551 Raleigh, NC 27602 Gentlemen:

SUBJECT: NRC INSPECTION REPORT N0. 50-400/85-52 This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by W. Tobin on June 18-19, 1986. The inspection included a review of activities authorized for your Shearon Harris facility. At the conclusion of the inspection, the findings were discussed with those members of your staff identified in the enclosed inspection repor Areas examined during the inspection are identified in the report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observation of activities in progres Within the scope of the inspection, no violations or deviations were identifie In accordance with 10 CFR 2.790(d) and 10 CFR 73.21 safeguards activities and security measures are exempt from public disclosure; therefore, the enclosure to this letter, with the exception of the report cover page which presents a nonexempt summary, will not be placed in the NRC Public Document Roo Should you have any questions concerning this letter, please contact u

Sincerely, David M. Verrelli, Chief Reactor Projects Branch 2 Division of Reactor Projects

,

'

Enclosure:

NRC Inspection Report cc w/ encl: (See page 2)

SArro m n- .. j ?%ogD

- nw a_ ta A730 g = ,,!' ll!gp2agg s% p;n?;"p

.

.,, ,

8607170131 860714 DR ADOCK 0500 0 ,

.g

'

- Carolina Power and Light Company 2 g

cc w/ enc 1:

R. A. Watson, Vice President Harris Nuclear Project R. M. Parsons, Project General Manager -

D. L. Tibbetts, Director of Regulatory Compliance J. L. Willis, Plant General Manager bcc w/ enc 1:

IE File NMSS/SGPL NRR/DL/SSPB C. Barth, ELD J. Moore, ELD bec w/ Inspection Summary:

Document Control Desk, 016 NRC Resident Inspector State of North Carolina

'

RII RII (Rl' RII ? RII

WTobin.-:hlm h(

DMcGu\,

ire U

K rr JS hr PFrederickson 6/1 /86 (/$/86 -}/gl/86 J y f//86 y/ /86

'l ENCLOSURE COliTAINS S AFEGUARDS INFORMATION UPON SEPARATION THIS excc Isorco"'" ""-

.