ML20206Q528

From kanterella
Jump to navigation Jump to search
Responds to 990304 Request for Two Rail Routes to Be Used for Transport of Spent Fuel from Brunswick Steam Electric Plant,Southport,Nc & Hb Robinson Steam Electric Plant, Hartsville,Sc to Shearon Harris Npp,Near New Hill,Sc
ML20206Q528
Person / Time
Site: Harris, Brunswick, Robinson  Duke energy icon.png
Issue date: 05/17/1999
From: Shankman S
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Morton T
CAROLINA POWER & LIGHT CO.
References
NUDOCS 9905190156
Download: ML20206Q528 (4)


Text

. _ . . . .

l May 17, 1999 Mr. Terry Morton Manager- Performance Evaluation and Regulatory Affairs Carolina Power & Light Nuclear Generation Group PO Box 1551 CPB 9A Raleigh, NC 27602

Dear Mr. Morton:

This is in regard to your request dated March 4,1999, for two rail routes to be used for transport .

of spent fuel from the Brunswick Steam Electric Plant, Southport, North Carolina, and the H. B.

Robinson Steam Electric Plant, Hartsville, South Carolina, to the Shearon Harris Nuclear Power Plant, near New Hill, South Carolina.

The routes, as set forth in Enclosure 1 of each route, meet the regulatory requirements of 10 CFR 73.37. Enclosure 2 of each route constitutes the route approval. Unless renewed, these route approvals will expire two years from the date of this letter. Note that transportation of licensed radioactive material must be conducted in compliance with applicable U.S.

Department of Transportation regulations.

Note that 10 CFR 73.37(d)(3) requires rail shipments to be accompanied by escorts who have communications capability to summon assistance in case of an emergency. NRC staff have completed the arrangements with law enforcement agencies required by 10 CFR 73.37(b)(6).

Information on these arrangements is provided in Enclosure 2 for each route, and is to be incorporated into your shipment plans and provided to your carrier along with instructions regarding its use.

The notification requirements of 10 CFR 73.37(f) and 73.72, and the information protection I requirements of 10 CFR 73.21, apply for each shipment made under these approvals. When making notification to this office under 10 CFR 73.72, please confirm that the appropriate governors or designees will or have been notified.

Should you require additional information or have questions concerning this matter, please contact Gloria Bennington of my staff at (301) 415-8524.

h fl 9905190156 990517 Susan F. Shankman, Deputy Director PDR ADOCK 05000261 Licensing and Inspection Directorate P PDR Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards Docket Nos. 50-324, 50-261 N,N NINE 8 IIEU $

Enclosures:

' 0N - ^

1. Rail Route #130 _6ac[oswit, l t's @classTed
2. Rail Route #135 (G\cp&l130&5.wpd) C = COVER E = COVER & ENCLQthlRE N = NO COPY OFC / CFPO [ _SFPO h SF{Q- ! S NAME ghGBennington/gb' JRCook Er)g Shankman DATE 05/ 6 /99 05/N/99 05/ /99 05// [/99 OFFICIAL RECORD COPY Document Transmitted Herewith r-Contains Safeguards loformation

-uw3 L b)Esev

\

T y M I

\lVjd M v iT '

puhuu$ us - '

UNIVTORONTO/SRS (#194)

DISTRIBUTION:

w/ enclosures: w/o enclosures:

Docket File 050-00261/00324 NMSS R/F SFPO R/F Case File 050-00261290R0/00324660R NJensen, OGC MMessier, OCFO Region ll ANorris (L22857 & L22858) i l

1

. 130 Enclosure 1 RAIL TRANSPORTATION ROUTE BRUNSWICK STEAM ELECTRIC PLANT SOUTHPORT, NORTH CAROLINA TO SHEARON HARRIS NUCLEAR POWER PLANT NEAR NEW HILL, NORTH MAOLINA NORTH CAROLINA

1. Brunswick Steam Electric Plant, Southport, NC through the Sunny Point Military Ocean Terminal to Leland, NC 18 miles
2. Leland, NC west over CSX tracks to Hamlet, NC 119 miles
3. Hamlet, NC north over CSX tracks to Bonsal, NC 10 miles Total 207 miles

/

Individual receiving advance notification of spent fuel shipment pursuant to 10 CFR 73.37(f):

Line Sgt. Mark Dalton,919-733-5282; after hours,919-733-3861. I

~

May 1999

1

) l 135 Enclosure 1 RAll TRANSPORTATION ROUTE H. B. ROBINSON STEAM ELECTRIC PLANT HARTSVILLE, SOUTH CAROLINA

. TO SHEARON HARRIS NUCLEAR POWER PLANT NEAR NEW HILL, NORTH CAROLINA SOUTH CAROLINA

1. H. B. Robinson Steam Electric Plant, Hartsville, SC to McBee, SC 6 miles
2. McBee, SC north to the NC state line 40 mitqg Subtotal 46 miles NORTH CAROLINA
3. NC state line north over CSX tracks to Bonsal, NC 83 miles
4. Bonsal, NC west tp Shearon Harris Nuclear Power Plant 3 miles Subtotal 86 miles TOTAL 132 miles SOUTH CAROLINA Individual receiving advance notification of spent fuel shipment pursuant to 10 CFR 73.37(f):

Virgil Autry, 803-896-4244; after hours, 803-253-6488.

NORTH CAROLINA Individual receiving advance notification of spent fuel shipment pursuant to 10 CFR 73.37(f):

Line Sgt. Mark Dalton, 919-733-5282; after hours, 919-733-3861.

May 1999 l

l