      Docket No. 50-456
      Docket No. 50-457
      Commonwealth Edison Company
      ATTN:  Mr. Cordell Reed
              Vice President
      Post Office Box 767
      Chicago, IL 60690
      Gentlemen:
      This refers to the special safety inspection conducted by Messrs. J. W. Muffett,
      J. M. Jacobson, and D. E. Jones of this office on October 16-18, 29, 30 and
      November 5-7, 13, 14, 1985, of activities at Braidwood Station, Units 1 and 2,
      authorized by NRC Construction Permits No. CPPR-132 and No. CPPR-133 and to
      the discussion of our findings with Mr. C. W. Schroeder at the conclusion of
      the inspection.
      The enclosed copy of our inspection report identifies areas examined during
      the inspection. Within these areas, the inspection consisted of.a selective
      examination of procedures and representative records, observations, and
      interviews with personnel.
      No violations of NRC requirements were identified during the course of this
      inspection.
      In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
      Title 10, Code of Federal Regulations, a copy of this letter and the
      enclosures will be placed in the NRC Public Document Room.
      We will gladly' discuss any questions you have concerning this inspection.
                                              Sincerely,                  . .
                                                                                                3
                                  -,
    86o1070651 85 #o456                                                                          '
    PDR    ADOCK O$ oPDR                    J. J. Harrison, Chief
    G                                        Engineering Branch
      Enclosure: Inspection Report
        No. 50-456/85050(DRS);
        No. 50-457/85048(DRS)
      See Attached Distribution
          Y
      RIII-
                      f
                      RIII
                                  f65
                                  RII      RIII
                                                          W
                                                          RIII      RIII        RIII
        u fett/jp      a    n            Da    on      e        Li  le      a ris n
                                                          t%2.'l    I 87      ' /  L7 l'J'
1
i
                                                                                          ,sia'
                                                                                                  ,
                                                              _
 
.
  .
                                                  DEC 2 71985
  Commonwealth Edison Company          2
  Distribution
  cc w/ enclosure:
  D. L. Farrar, Director
    of Nuclear Licensing
  M. Wallace, Project Manager
  D. Shamblin, Construction
    Superintendent
  E. E. Fitzpatrick, Station
    Superintendent
  C. W. Schroeder, Licensing and
    Compliance Superintendent
  DCS/RSB (RIDS)
  Licensing Fee Management Branch
  Resident Inspector, RIII
    Braidwood
  Resident Inspector, RIII Byron
  Phyllis Dunton, Attorney
    General's Office, Environmental
    Control Division
  D. W. Cassel, Jr., Esq.
  J. W. McCaffrey, Chief, Public
    Utilities Division
  H. S. Taylor, Quality Assurance
    Division
  E. Chan, ELD
  J. Moore, ELD
  G. Berry, ELD
  J. Stevens, NRR
  The Honorable Herbert Grossman, ASLB
  The Honorable A. Dixon Callihan, ASLB
  The Honorable Richard F. Cole, ASLB
                                              _a!
                                            AL      -
                              hg#        -
              ,r b
        /                                                  -
}}
}}

Latest revision as of 01:48, 22 July 2020

Forwards Special Safety Insp Repts 50-456/85-50 & 50-457/85-48 on 851016-1114.No Violations Noted
ML20141E267
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 12/27/1985
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20141E272 List:
References
NUDOCS 8601070651
Download: ML20141E267 (2)


See also: IR 05000456/1985050

Text

- .

DEC 271985

t

,

Docket No. 50-456

Docket No. 50-457

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the special safety inspection conducted by Messrs. J. W. Muffett,

J. M. Jacobson, and D. E. Jones of this office on October 16-18, 29, 30 and

November 5-7, 13, 14, 1985, of activities at Braidwood Station, Units 1 and 2,

authorized by NRC Construction Permits No. CPPR-132 and No. CPPR-133 and to

the discussion of our findings with Mr. C. W. Schroeder at the conclusion of

the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of.a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the

enclosures will be placed in the NRC Public Document Room.

We will gladly' discuss any questions you have concerning this inspection.

Sincerely, . .

3

-,

86o1070651 85 #o456 '

PDR ADOCK O$ oPDR J. J. Harrison, Chief

G Engineering Branch

Enclosure: Inspection Report

No. 50-456/85050(DRS);

No. 50-457/85048(DRS)

See Attached Distribution

Y

RIII-

f

RIII

f65

RII RIII

W

RIII RIII RIII

u fett/jp a n Da on e Li le a ris n

t%2.'l I 87 ' / L7 l'J'

1

i

,sia'

,

_

.

.

DEC 2 71985

Commonwealth Edison Company 2

Distribution

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

M. Wallace, Project Manager

D. Shamblin, Construction

Superintendent

E. E. Fitzpatrick, Station

Superintendent

C. W. Schroeder, Licensing and

Compliance Superintendent

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. Cassel, Jr., Esq.

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

E. Chan, ELD

J. Moore, ELD

G. Berry, ELD

J. Stevens, NRR

The Honorable Herbert Grossman, ASLB

The Honorable A. Dixon Callihan, ASLB

The Honorable Richard F. Cole, ASLB

_a!

AL -

hg# -

,r b

/ -