IR 05000456/1979015: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20126B752
| number = ML20126B752
| issue date = 03/04/1980
| issue date = 03/04/1980
| title = Ack Receipt of 800215 Ltr Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-456/79-15 & 50-457/79-15
| title = Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-456/79-15 & 50-457/79-15
| author name = Fiorelli G
| author name = Fiorelli G
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 8003190837
| document report number = NUDOCS 8003190837
| title reference date = 02-15-1980
| package number = ML20126B755
| package number = ML20126B755
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE

Latest revision as of 14:12, 22 August 2022

Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-456/79-15 & 50-457/79-15
ML20126B752
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 03/04/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20126B755 List:
References
NUDOCS 8003190837
Download: ML20126B752 (1)


Text

  • . l'/Ci -

gaterg UNITED ST ATES

"

3+$ 0., NUCLEAR REGULATORY COMMIS510N e

f a

[

C REGION lli 799 Roo1EVELT ROAD

- 9 M G LEN E LLY N, lLLINOIS 60137

.....

MAR 4 1980 Docket No. 50-456 Docket No. 50-457 Commonwealth Edison Company ATTN: Mr. Cordell Reed Vice President Post office Box 767 Chicago, IL 60690 Gentlemen:

Thank you for your letter dated February 15, 1980, informinb us of the steps you have taken to correct the items of noncompliance which we brought to your attention in Inspection Reports No. 50-456/79-15 and N /79-15 forwarded by our letter dated January 18, 1980. It is our unde rs tancine; tha t the date when full compliance will be achieved for your ref e renced evalua tion is April 33, 1980. This was confirmed during a telephone conversation on February 22, 1980 between W. Naughton of your staff and E. R. Schweibinz of this offic We will examine these matters during a subsequent inspectio Your cooperation with us is appreciate Since rely ,

-

WlY G. Fiore111, Chief Reactor Construction aed Engineering Support 7,ra nc h cc: Mr. .D. L. peopics , Director of Nuclear Licensing M R. Cosaro, Project Superintendent cc w/1tr dtd 2/15/80:

Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Mr. Dean Hansell, Office of Assistant Attorney General 8 003190 D2 l l