Ack Receipt of 850311,870202 & 1106 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-445/84-32 & 50-446/84-11.Disagrees W/Licensee Conclusion That 1983 Audit Program Coverage of Design & Const Adequate
ML20237A808
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 12/04/1987
From: Charemagne Grimes
NRC OFFICE OF SPECIAL PROJECTS
To: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
References
NUDOCS 8712150276
Download: ML20237A808 (9)


Text

- - _ _ _ - _ - _ . - _ _

.

.

.

DEC -4 Igg7-November v, 1907 In Response Reply To:

Dockets: 50-445/84-32 50-446/84-11 TU Electric ATTN: Mr. William G. Counsil Executive Vice President 400 North Olive Street, Loek Box 81 Dallas, Texas 75201 Gentlemen:

Thank you for your letters dated March 11, 1985, February 2, 1987, and November 6, 1987, (TXX-4435, 6144, and 6895, respectively) informing us of the steps you have taken to correct the violations which we brought to your attention in Inspection Report No. 50-445/8432, 50-446/84-11 forwarded by our letter dated February 15, 198 With respect to item 2.b, we disagree with your conclusion that

" ... the 1983 audit program coverage of the design and construction phase of CPSES was adequate" and we consider this to be a valid example of the violation. However, since the design is being revalidated, the construction is being assessed by the Corrective Action Program, and the current audit program (inspected and documented in Inspection Reports 50-445/86-03, 50-446/86-02 and 50-445/87-16, 50-446/87-13) appears to be adequate, no additional information was requested and no further response is require With respect to item 2.c, we believe it would have been prudent for the applicant to audit Westinghouse onsite activities because of the safety significance of the onsite work for which Westinghouse had responsibility. Therefore, we consider this to be a valid example of the violation; however, no further response is require RUJ IP:CPPD:OSP AD:IP:CPPD:OSP CPPD:OS IPrcnprose SPhillips:ww RWarnick CGrimes HALE M 11/

/87 11/30/87 1A/3/87 /fj/ g g G

.

.

.

TU Electric 2 DEC - 41987 I

The NRC will examine your corrective actions during a future ,

I inspectio

Sincerely, Original signed by C. I. Grimes C. I. Grimes, Director Comanche Peak Project Division Office of Special Projects cc:

See next pag j i

j l

)

i l

I w _________ _______ _ _________________________._ __ __ _. _J

__ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _

-

  1. s oscw
  1. o

'g UNITED STATES

!" , u g NUCLEAR REGULATORY COMMISSION g :j WASHING TON, D. C. 20555

\..../

In Response Reply To:

Dockets: 50-445/84-32 50-446/84-11 TU Electric ATTN: Mr. William G. Counsil Executive Vice President 400 North Olive Street, Lock Box 81 Dallas, Texas 75201 Gentlemen:

Thank you for your letters dated March 11, 1985, February 2, 1987, and November 6, 1987, (TXX-4435, 6144, and 6895, respectively) informing us of the steps you have taken to correct-the violations which we brought to your attention in Inspection Report No. 50-445/8432, 50-446/84-11 forwarded by our letter ,

dated February 15, 198 With respect to item 2.b, we disagree with your conclusion that

"

. . . the 1983 audit program coverage of the design and construction phase of CPSES was adequate" and we consider _this to be a valid example of the violation. However, since the design is being revalidated, the construction is being assessed by the Corrective Action Program, and the current audit program (inspected and documented in Inspection Reports 50-445/86-03, 50-446/86-02 and 50-445/87-16, 50-446/87-13) appears to be adequate, no additional information was requested and no further response is require With respect to item 2.c, we believe it would have been prudent for the applicant to audit Westinghouse onsite activities because of the safety significance of the onsite work for which Westinghouse had responsibility. Therefore, we consider this to be a valid example of the violation; however, no further response is require .

TU Electric 2 The NRC will examine your corrective actions during a future inspectio

Sincerely,

b&L C. I. Grimes, Director Comanche Peak Project Division Office of Special Projects !

\

CC*

See next pag j I

i l

,

i i

I

1

!

l l

i l

l l

.

TU Electric l

i cc w/ enclosure:

Roger D. Walker Bureau of Radiation Control Manager, Nuclear Licensing State of Texas Texas Utilities Electric Company 1100 West 49th Street Skyway Tower Austin, TX 78756 400 North Olive Street, L.B. 81 Dallas, TX 75201 Nancy H. Williams CYGNA Energy Services Juanita Ellis Suite 390 I President - CASE 2121 N. California Blvd 1426 South Polk Street Walnut Creek, CA 94596 Dallas, TX 75224 l Thomas G. Dignan, J Renea Hicks, Es Ropes & Gray Assistant Attorney General 225 Franklin Street Environmental Protection Division Boston, MA 02110 P.O. Box 12548, Capitol Station Austin, TX 78711-2548 Robert A. Wooldridge, Es Worsham, Forsythe, Sampels Administrative Judge Peter Bloch and Wooldridge U.S. Nuclear Regulatory Commission 2001 Bryan Tower Washington, DC 20555 Suite 2500 Dallas, TX 75201 Elizabeth B. Johnson Administrative Judge Mr. Homer C. Schmidt Oak Ridge National Laboratory Director of Nuclear Post Office Box X, Building 3500 Services Oak Ridge, TN 37830 TU Electric Skyway Tower Dr. Kenneth A. McCollom 400 N. Olive St., L.B. 81 1107 West Knapp Dallas, TX 75201 Stillwater, OK 74075 Mr. Robert E. Ballard, J Dr. Walter H. Jordan Director of Projects Administrative Judge Gibbs and Hill, In West Outer Drive 11 Penn Plaza Oak Ridge, TN 37830 New York, NY 10001 Anthony Z. Roisman, Es Mr. R. S. Howard Suite 600 Westinghouse Electric 1401 New York Avenue, Corporation Washington, DC 20005 Post Office Box 355 Pittsburgh, PA 15230 Ms. Billie Pirner Garde, Es Government Accountability Project Lanny A. Sinkin Midwest Office Christic Institute 104 East Wisconsin Avenue 1324 N. Capitol Street Appleton, WI 54911 Washington, DC 20002

_

l TU Electric cc: (continued)

David R. Pigott,'Es Jack R. Newman, Es ,

Orrick, Herrington & Sutcliffe Newman & Holtzinger, '

600 Montgomery Street 1615 L Street, San Francisco, CA 94111 Washington, ,

20036 l Robert Jablon Bonnie S. Blair l Spiegel & McDiarmid i

1350 New York Avenue, NW Washington, DC 20005-4798 George A. Parker, Chairman Public Utility Committee Senior Citizens Alliance of Tarrant County, In Wonder Drive Fort Worth, TX 76133 Joseph F. Fulbright Fulbright & Jaworski 1301 McKinney Street Houston, TX 77010 Mr. Jack Redding c/o Bethesda Licensing TU Electric 3 Metro Center, Suite 610 Bethesda, MD 20814 William A. Burchette, Es Counsel for Tex-La Electric Cooperative of Texas Heron, Burchette, Ruckert &

Rothwell suite 700 1025 Thomas Jefferson St., NW Washington, DC 20007

]

James P. McGaughy, J GDS Associates, In Suite 720 1850 Parkway Place Marietta, GA 30067 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011

I

,

- - - _ - - - _ - _ - - - - - _ - - - - - _ . - - - - - _ - - - - - - - - - - - - . - - - - - - _ . - - - - - - - - - -

.

1 .

TU Electric i

cc w/ enclosure:

Roger D. Walker Bureau of Radiation Control Manager, Nuclear Licensing State of Texas Texas Utilities Electric Company 1100 West 49th Street Skyway Tower Austin, TX 78756 400 North Olive Street, L.B. 81 Dallas, TX 75201 Nancy H. Williams ;

CYGNA Energy Services Juanita Ellis Suite 390 President - CASE 2121 N. California Blvd 1426 South Polk Street Walnut Creek, CA 94596 Dallas, TX 75224 Thomas G. Dignan, J Renea Hicks, Es Ropes & Gray Assistant Attorney General 225 Franklin Street Environmental Protection Division Boston, MA 02110 1 P.O. Box 12548, Capitol Station Austin, TX 78711-2548 Robert A. Wooldridge, Es I Worsham, Forsythe, Sampels I Administrative Judge Peter Bloch and Wooldridge l U.S. Nuclear Regulatory Commission 2001 Bryan Tower Washington, DC 20555 Suite 2500 Dallas, TX 75201 Elizabeth B. Johnson Administrative Judge Mr. Homer C. Schmidt Oak Ridge National Laboratory Director of Nuclear Post Office Box X, Building 3500 Services Oak Ridge, TN 37830 TU Electric Skyway Tower Dr. Kenneth A. McCollom 400 N. Olive St., L.B. 81 l 1107 West Knapp Dallas, TX 75201 Stillwater, OK 74075 Mr. Robert E. Ballard, J Dr. Walter H. Jordan Director of Projects Administrative Judge Gibbs and Hill, In West Outer Drive 11 Penn Plaza Oak Ridge, TN 37830 New York, NY 10001 Anthony Z. Roisman, Es Mr. R. S. Howard Suite 600 Westinghouse Electric 1401 New York Avenue, Corporation Washington, DC 20005 Post Office Box 355 Pittsburgh, PA 15230 Ms. Billie Pirner Garde, Es Government Accountability Project Lanny A. Sinkin Midwest Office Christic Institute 104 East Wisconsin Avenue 1324 N. Capitol Street Appleton, WI 54911 Washington, DC 20002

- - _ _ _ - _ _ _ - - - _ _ _ . . _ _ .

-

.

.

TU Electric cc: (continued)

David R. Pigott, Es Jack R. Newman, Es Orrick, Herrington & Sutcliffe Newman & Holtzinger, Montgomery Street 1615 L Street, San Francisco, CA 94111 Washington, Robert Jablon Bonnie S. Blair Spiegel & McDiarmid 1350 New York Avenue, NW l Washington, DC 20005-4798 George A. Parker, Chairman Public Utility Committee Senior Citizens Alliance of Tarrant County, In Wonder Drive Fort Worth, TX 76133

Joseph F. Fulbright  !

Fulbright & Jaworski i 1301 McKinney Street Houston, TX 77010 f

i Mr. Jack Redding j c/o Bethesda Licensing TU Electric 3 Metro Center, Suite 610 Bethesda, MD 20814 William A. Burchette, Es Counsel for Tex-La Electric Cooperative of Texas Heron, Burchette, Ruckert &

Rothwell l

'

Suite 700 1025 Thomas Jefferson St., NW Washington, DC 20007

James P. McGaughy, Jr.

l GDS Associates, Inc.

I Suite 720 l 1850 Parkway Place l Marietta, GA 30067 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011

_

\'

.

DISTRIBUTION:

Docket Files (50-445/446')

NRC PDR LPDR OSP Reading CPPD-LA CPPD Reading (HQ)

Site Reading CPRT Group SRI-OPS SRI-CONST AD for Projects MIS System, RIV RSTS Operator, RIV RPB, RIV RIV Docket File DWeiss, RM/ALF JTaylor JKeppler/JAxelrad CIGrimes PFMcKee JLyons AVietti-Cook MMalloy JMoore, OGC JGilliland, RIV FMiraglia i EJordan  !

JPartlow I BHayes

,