ML20153E151: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20153E151
| number = ML20153E151
| issue date = 02/14/1986
| issue date = 02/14/1986
| title = Ack Receipt of 851204 Ltr Informing NRC of Steps Taken to Correct Noncompliance Noted in Insp Repts 50-456/85-21 & 50-457/85-22.Based on Response to Violation,Item 1.a. Will Be Deleted
| title = Ack Receipt of Informing NRC of Steps Taken to Correct Noncompliance Noted in Insp Repts 50-456/85-21 & 50-457/85-22.Based on Response to Violation,Item 1.a. Will Be Deleted
| author name = Harrison J
| author name = Harrison J
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 8602240423
| document report number = NUDOCS 8602240423
| title reference date = 12-04-1985
| package number = ML20153E154
| package number = ML20153E154
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE

Latest revision as of 17:17, 10 December 2021

Ack Receipt of Informing NRC of Steps Taken to Correct Noncompliance Noted in Insp Repts 50-456/85-21 & 50-457/85-22.Based on Response to Violation,Item 1.a. Will Be Deleted
ML20153E151
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 02/14/1986
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20153E154 List:
References
NUDOCS 8602240423
Download: ML20153E151 (2)


See also: IR 05000456/1985021

Text

m -

,

.

..

. .

..

h FEB 141986

!

i

l  : Docket'No. 50-456

l Docket,No. 50-457

l

'

Comonwealth Edison Company

ATTri
Mr. Cordell Reed

' Vice President

Post Office Box 767

Chicago, IL 60690

!

Gentlemen:

Thank you for your letter dated December 4,1985, infonning us.of the steps ..s

you have taken to correct the nonccmpliance which we brought to your attention

in our letter dated November 4,1985. Based on'your response to violation.

Item 1.a., we will delete this portion of the violation..

We will gladly discuss any questions you have concerning this matter.

'

C:hhRCh=S'50 O. U^TiW'

J. J. Harrison, Chief

Engineering Branch s'

See Attached Distribution

!

l

l

l

i

8602240423 e60214

PDR ADOCK 05000456

i G PDR

f

RIII RIjlg. I R.l,

RI

i

/? hn

.Mendez/jk '"mes

A

. ... = W1 Litt' e H soli

02/05/86 .02/i4 /86 ,2/ 02/t /86 02/t 86

~l I..

t Y 8 0 /_.

-

,

.Comonwealth Edison Company 2

cc: D. L. Farrar, Director

of Nuclear Licensing

M. Wallace, Project Manager

D. Shamblin, Construction

Superintendent

E. E. Fitzpatrick, Station

Superintendent

C. W. Schroeder, Licensing and

Compliance Superintendent

cc w/ltr dtd 12/04/85:

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. Cassel, Jr. , Esq.

.J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

E. Chan, ELD

J. Moore, ELD

G. Berry, ELD

J. Stevens, NRR

The Honorable Herbert Grossman, ASLB

The Honorable A. Dixcn Callihan, ASLB

The Honorable Richard F. Cole, ASLB