IR 05000400/1986076: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20207T625
| number = ML20207T625
| issue date = 03/02/1987
| issue date = 03/02/1987
| title = Ack Receipt of 870123 Ltr Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-400/86-76
| title = Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-400/86-76
| author name = Reyes L
| author name = Reyes L
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 8703240189
| document report number = NUDOCS 8703240189
| title reference date = 01-23-1987
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 1
| page count = 1

Latest revision as of 12:59, 5 December 2021

Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-400/86-76
ML20207T625
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 03/02/1987
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
References
NUDOCS 8703240189
Download: ML20207T625 (1)


Text

._ _

- _____ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

-

. -

.

cys March 2, 1987

,

Carolina Power and Light Company MTTN: Mr. E. E. Utley

' Senior Executive Vice President-Power Supply and Engineering j and Construction P. O. Box 1551 Raleigh, NC 27602 Gentlemen:

'

SUBJECT: NOTICE OF VIOLATION (NRC INSPECTION REPORT NO. 50-400/86-76)

Thank you for your response of January 23, 1987, to our Notice of Violation issued December 29, 1986, concerning activities conducted at your Shearon Harris facilit We have -evaluated your response and found that it meets the requirements of 10 CFR 2.201. We will examine the implementation of your corrective actions during future inspection We appreciate your cooperation in this matte

Sincerely,

Original Signed by Luis A. Reyes Luis a. Reyes, Director Division of Reactor Projects cc: tr. A. Watson, Vice President Harris Nuclear Project

&: L. Tibbitts, Director of Regulatory Compliance

& L. Willis, Plant General Manager bec: M Barth, 0GC W. Moore, 0GC

,

>NRC Resident Inspector Document Control Desk State of North Carolina f

RII RII RI RII I p

T0'Connor:btm MS %n V/aqciera tredrickson 2/M/87 ,2/p/87 C

2 87 /2/J /87 2/24/87 Id f

B703240189 870302

= ^=" 5 882 ilo seo l