Forwards Insp Repts 50-445/87-06 & 50-446/87-05 on 870301- 0430 & Notices of Violation & Deviation
ML20237G291
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 08/05/1987
From: Warnick R
NRC OFFICE OF SPECIAL PROJECTS
To: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20237G293 List:
References
NUDOCS 8708140007
Download: ML20237G291 (6)


See also: IR 05000445/1987006

Text

- - _ - - - - _ - - _ _

.

L A6

i

l

,

AUG - 5 1987

In Reply Refer To:

l Dockets: 50-445/87-06

50-446/87-05

TU Electric

ATTN: Mr. W. G. Counsil

Executive Vice President

400 North Olive Street, Lock Box 81

Dallas, Texas 75201

l Gentlemen:

This refers to the inspection conducted by Mr. I. Barnes and other

inspectors in the Comanche Peak Project Division during the period

March 1 through April 30, 1987, of activities authorized by NRC

Construction Permits CPPR-126 and CPPR-127 for the Comanche Peak

Steam Electric Station, Units 1 and 2, and to the discussions of

our findings with Mr. L. D. Nace and other members of your staff

during and at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas

, examined during the inspection. Within these areas, the inspection

!

consisted of selective examination of procedures and representative

records, interviews with personnel, and observations by the

inspectors.

During this inspection, it was found that certain of your

activities were in violation of NRC requirements, as specified in

the enclosed Notice of Violation. A written response to this

violation is required.

During this inspection, it was also found that certain of your

activities appeared to deviate from commitments made to the NRC, as

specified in the enclosed Notice of Deviation. A written response

to these deviations is requested.

In accordance with 10 CFR 2.790 of the Commission's regulations, a I

copy of this letter, the enclosures, and your response to this l

letter will be placed in the NRC Public Document Room. l

l

l

!

OFC: OSP:Cg3RI

NAME: CHaleN

RI

PWagner

RI h

El ershaw

SPI fg

IBarnes

AD ppt ()

RWarnick

DATE: 8/Jf/87 8/5 /87 8/J"7~87 8/r /87 8/ s /87

7 07o003

koOUljjggxosooou,s

o

- y(h2 ,

,

,

( l

t.

TU Electric 2 AUG - 51987

The responses directed by this. letter and the accompanying Notices

are not subject to the clearance procedures of the Office of

Management and Budget as required by the Paperwork Reduction Act'of

19sd, PL 96-511. .

Should you have any questions ~concerning this inspection, we will

L be pleased to discuss them with you.

! Sincerely,

ORIGINTiL SIGITCD BY R. F. WA3i!!CK  :

,

l

R. F. Warnick,. Assistant Director-

!

for Inspection Programs

Comanche Peak Project Division

Office of Special Projects

!

!

Enclosures:

1. Appendix A - Notice of Violation

2. Appendix B - Notice of Deviation'  !

3. Appendix C - NRC Inspection Report

. 50-445/87-06; 50-446/87-05

l

l cc: See next page

i

!

i

,

- _ _ _ _ _ _ _ _ _ _ _ _ - - - _ _ - _ _ - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _

-. . _ - - - .

i 2 .

I

!

.'m3

'.m .,......~,..:-s,, '

.-

~. '

i

- bec.', to DMB ' (, '301)

'bec'distrib:

CPRT RPB

  • SRI-OPS * MIS System ,
  • SRI-CONS *RSTS Operator I

C. Grimes, OSP RIV File I

H. Schierling, OSP L. Chandler, OGC

J. Lyons, OSP *D. Weiss, RM/ALF

i

  • w/766  !

i

!

!

l

1

,

!

I

l

l

l

l

l

1

_ - - _ _ -_ - i

!

.u cg'o UNITED STATES 1

[]g 7 g NUCLEAR REGULATORY COMMISSION  !

g  ; WASHINGTON, D. C. 20555

% o..

/ ALG - 51987 l

In Reply Refer To: )

Dockets: 50-445/87-06 i

50-446/87-05 ]

TU Electric

ATTN: Mr. W. G. Counsil

Executive Vice President

400 North Olive Street, Lock Box 81

Dallas, Texas 75201

Gentlemen:

This refers to the inspection conducted by Mr. I. Barnes and other

inspectors in the Comanche Peak Project Division during the period

March 1 through April 30, 1987, of activities authorized by NRC

Construction Permits CPPR-126 and CPPR-127 for the Comanche Peak

Steam Electric Station, Units 1 and 2, and to the discussions of

our findings with Mr. L. D. Nace and other members of your staff

during and at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas

examined during the inspection. Within these areas, the inspection

consisted of selective examination of procedures and representative

records, interviews with personnel, and observations by the

inspectors.

During this inspection, it was found that certain of your

activities were in violation of NRC requirements, as specified in

the enclosed Notice of Violation. A written response to this ,

violation is required. '

During this inspection, it was also found that certain of your

activities appeared to deviate from commitments made to the NRC, as

specified in the enclosed Notice of Deviation. A written response

to these deviations is requested.

In accordance with 10 CFR 2.790 of the Commission's regulations, a

copy of this letter, the enclosures, and your response to this l

letter will be placed in the NRC Public Document Room.  !

i

i

I

i

.

- - ~ -

TU Electric 2 AUG - 51987

The responses directed by this letter and the accompanying Notices

are not subject to the clearance procedures of the Office of

Management and Budget as required by the Paperwork Reduction Act of

1980, PL 96-511.

Should you have any questions concerning this inspection, we will

be pleased to discuss them with you.

Sincerely,

R F loa >4 '

R. F. Warnick, Assistant Director

for Inspection Programs

Comanche Peak Project Division {

q

Office of Special Projects i

!

Enclosures:

1. Appendix A - Notice of Violation

2. Appendix B - Notice of Deviation

3. Appendix C - NRC Inspection Report

50-445/87-06; 50-446/87-05

cc: See next page

i

I

i

I

i

.

l

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ._ _ _ _ _ _ _ _ . .J

TU Electric 3

cc w/ enclosures:

TU Electric

ATTN: G. S. Keeley, Manager,

Nuclear Licensing

Skyway Tower

400 North Olive Street

Lock Box 81

Dallas, Texas 75201

Juanita Ellis

President - CASE

1426 South Polk Street

Dallas, Texas 75224

Renea Hicks

Assistant Attorney General

Environmental Protection Division

P.O. Box 12548, Capitol Station i

Austin, Texas 78711-2548

Administrative Judge Peter Bloch

U. S. Nuclear Regulatory Commission

Washington, D.C. 20555

Elizabeth B. Johnson

Administrative Judge

Oak Ridge National Laboratory

P.O. Box X, Building 3500 .

Oak Ridge, Tennessee 37830 l

)

Dr. Kenneth A. McCollom j

1107 Nest Knapp

Stillizater, Oklahoma 74075

Dr. Walter H. Jordan

Administrative Judge

881 West Outer Drive

Oak Ridge, Tennessee 37830

Anthony Roisman, Esq. I

Suite 600

1401 New York Ave., N.W.

Washington, D.C. 20005

Ms. Billie Pirner Garde

Government Accountability Project

Midwest Office

104 E. Wisconsin Avenue

Appleton, Wisconsin 54915-8605

Bureau of Radiation Control

State of Texas '

100 West 49th Street

Austin, Texas 78756