Notice of Violation from Insp on 870301-0430.Violation Noted:Class E Colored Cables Stored in Outside Cable Reel Yard Improperly Protected from Exposure to Sunlight
ML20237G299
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 08/05/1987
From:
NRC OFFICE OF SPECIAL PROJECTS
To:
Shared Package
ML20237G293 List:
References
50-445-87-06, 50-445-87-6, 50-446-87-05, 50-446-87-5, NUDOCS 8708140009
Download: ML20237G299 (2)


Text

,

APPENDIX A NOTICE OF VIOLATION TU Electric Dockets: 50-445/87-06 i 50-446/87-05 Comanche Peak Steam Electric Station, Permits: CPPR-126 Units 1 and 2 CPPR-127 During an NRC inspection conducted on March 1 through April 30, 1987, in accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1987), the following violation was identified:

Criterion V of Appendix B to 10 CFR Part 50, as implemented by Section 5.0, Revision 3, dated July 31, 1984, of the TU Electric Quality Assurance Plan, requires that activities affecting quality shall be prescribed by and accomplished in accordance with documented instructions, procedures, or drawings.

Section E-6.5 of Brown & Root Procedure MCP-10, Revision 9,

" Storage and Storage Maintenance of Mechanical and Electrical Equipment," requires that "All colored cables stored in type class

'E' storage shall have the cable covered for protection against exposure to sunlight (i.e., replacement of shipping cardboard or similar material)."

Contrary to the above, on March 12, 1987, the NRC inspector identified colored cables stored in the outside (type class "E")

cable reel yard which were improperly protected from exposure to '

sunlight. The opaque plastic covering installed to protect the cables from sunlight failed to cover a significant portion of the cable. These cables were noted to have begun fading in the exposed area. Examples of the above condition were noted on cable reels W-416-1, W-316-1A, W-745-1CC, W-117-1, W-117-3, W-117-4 and W-118-12C.

This is a Severity Level V violation (Supplement II)

(445/8706-V-12; 446/8705-V-06).

8700140009 070005 PDR ADOCK 05000445 -

g G PDR

2 Pursuant to the provisions of 10 CFR 2.201, TU Electric is hereby required to submit to this office, within 30 days of the date of the letter transmitting this Notice, a written statement or explanation in reply, including for each violation: (1) the reasons for the violations if admitted, (2) the corrective steps which have been taken and the results achieved, (3) the corrective steps which will be taken to avoid further violations, and (4) the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending your response time.

Dated at Comanche Peak, Glen Rose, Texas this 5th day of August, 1987 l