Advises of Applicant 681025 & 1227 Requests for Withdrawal of Applications for Cp.No Further Review of Dept of Water & Power of City of Los Angeles,Southern California Edison & San Diego Gas & Electric Applications Required
ML20235Z166
Person / Time
Site: 05000000, 05000307, 05000308
Issue date: 01/14/1969
From: Boyd R
US ATOMIC ENERGY COMMISSION (AEC)
To: Newmark N
ILLINOIS, UNIV. OF, URBANA, IL
Shared Package
ML20235X376 List: ... further results
References
FOIA-87-462 NUDOCS 8710200649
Download: ML20235Z166 (1)


Text

.

Distribution:

l Suppl. 7 l

l DR Reading

!p 1(N DRL Reading j%

RPB-5 Reading Docket Mos. 50-307 S. M. Kari (2) and 50-308 R. S. Boyd D. F. Knuth T. Conner i

Dr. Nathan M. Newmark l

1114 Civil Engineering Building University of Illinois Urbana, Illinois 61801

Dear Dr. Newmark:

By letter dated October '25,1968, Southern California Edison and

)

San Diego Gas and Electric Company, submitted an application to

-l j

withdraw their joint Application for a Construction Permit for l

the Edison-San Diego unit of the Bolsa Island Project.

Subsequently,

)

l by letter dated December 27, 1968, the Department of Water and l

Power of the City of Los Angeles submitted a similar application for withdrawal of their Application for a Construction Permit to I

operate the Department unit of the Bolsa Island Project.

Copies of related notices which have been transmitted to the Office of the Federal Register for filing and publication are enclosed for your information.

l l

As previously indicated, no further review is required by you on j

these applications.

1 Sincerely yours, 3r4' ?DM l

I rr.c '

a.

Roger S. Boyd, Assistant Director for Reactor Projects i

Division of Reactor Licensing l

l

Enclosures:

l Federal Register Notices l

l l

8710200649 871014

-462.,PDR.

AD omer >.DRL PB-5

/

,,DRL RP 5

B s a ri :ia',,,.,,,,

f' emh D

tv SURNAME >

l<

1 /114/69

_ _ _....,.... -1/ /d/69 om>

..l.T Wm MDC 318 (Rev,9-63)

I Q{,g.

1 U.s.covtRNurm PRiminc omet r isse-o 214-e2s b0 PD w-

n.a a w a..: =.-: w.:.u = a.. m a.a m.,.. m

.a.

u x...~....-

,~

j x]

SG-S$2

)

n/

l I

f DISTRIBUTION:

% DOCUMENT CONTROL DESK 016 l}

d4N 13 yggy GSB RDG LM y"

Dr. S. T. Alaermissan I

U. S. Geological Survey L.J.

P. O. Pox 25046, Pt. S. 966 L;.

Derver, Colorado 80?25 a

.s Pear Ted:

o

[? '

Subject:

WNP-3 OL Review Schedule Ln

(.r Attached is the latest WilP-3 review schedule.

Some of the important detes include (a) Ouastions due by April 5,1983; (b) Draft SER due Oct.

P8, 1983; and (c) Final SEP due June 5, 19R4.

Please infom the USGS reviewers of this schedule.

c Sincerely, OrisiD31 signed by g.E. Jackson Robert E. Jackson, Chief Geoscierces Branch Division of Engineering cc:

J. Devine, USGS l

P. Forris, USnS I

D. Parkins, USGS bec:

S. Brocoum l.

L. Reiter R. McMullen i

J. King

?

1

.J h

0901480498 830113

.EE ADOCK 05000508 gig g.,,. g L,,

1 Lt Li l

l, I\\ n \\\\\\.

......D..E...:.G..S..B.. 3.....

s:.:M..........i ome,,

p..

summe >..Sar.ocaumn.1 NAsks%

F

.....1/.13/.O........1./.1.3../.8. 3........

l om>

.......................(

i NGC FORM 318 (10-80) NACM 0240.

OFFiClAL RECORD COPY use m er-m..e

~

n:.c;:.2=0.:. m m u.:.a:xa w.x u w ::.sa w a.a.u-.:.2:=:w Yd AbHING I ON,0. C. 20bSb

,o,,bgl)@Gg,,

%,, '.v f f

' m. m

.../

JAN 101983 1

j t

.I

'i Docket No.: 50-508 l

l 1

MEMORANDUM FOR: Attached List

, l' 4

FROM:

George W. Knighton, Chief, Licensing Branch No.' 3, DL n

+$J

SUBJECT:

WNP-3 OL REVIEW SCHEDULE Attached for your information and distribution to the appropriate technical

,},)

reviewers is the approved schedule for review of the WNP-3 OL appli. cation.

l The Division of Licensing project manager for WNP-3 Annette Vietti x24449 has received several phone calls over the past few weeks regarding scheduling

+

dates. Therefore, to insure all the technical. reviewers 'have a copy of the.

schedule it is being sent out again.

f A.

L mad 6h GeorgeW/Knighton,'C ef Licens,ing Branch No. 3 Division of Licensing Attachment-As stated I

lI 1r l'(

l L

i

(*,

N) 2( f.

-8301-180502 830110 ADOCK05000g8 WP

~ _ _. -

} :.:...... i a tr.~;.; J 3.:n.:e:1.::ct m.~.c..m s. a.

..w-j '.,.

,3, b'

WNP-3 OL REVIEW SCHEDULE Staff forwards Draf t Environmental Statement (DES)

December 10, 1982

.c questions to Division of Licensing (DL)

DL forwards DES questions to applicant December 17, 1982 Environmental site visit and applicant

  • March 1983 responses to DES questions Staff forwards Safety Evaluation Report (SER)

April 5, 1983 questions to DL DL forwards SER questions to applicant April 12, 1983 Applicant rersponds to questions developed May 2, 1983 at the environmental site visit Staff forwards DES input to DL July 8,1983 Applicant responds to SER questions July 12,1983 DL issues DES September 7,1983 Staff forwards draf t SER input to DL October 28, 1983 DL issues draft SER December 1,1983 Staff forwards Final Environmental Statement (FES)

J anuary 31, 1984 input to DL DL issues FES April 6, 1984 Staff forwards final SER input to DL June 5,1984 DL issues SER Au9ust 9,1984 ACRS meeting September 20, 1984 Staff input to SSER forwarded to DL November 6,1984 DL issues SSER December 13, 1984 Start hearings May 1985 ASLB decision November 1985 Coumission decision December 1985

  • Specific date to be determined after coordination with participants a

t

. _. _... _ - _. ~,.