ML20005F272
| ML20005F272 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom, Limerick, 05000000 |
| Issue date: | 01/09/1990 |
| From: | Butler W Office of Nuclear Reactor Regulation |
| To: | Hunger G PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| References | |
| GL-88-20, TAC-74427, TAC-74428, TAC-74448, TAC-74449, NUDOCS 9001160111 | |
| Download: ML20005F272 (4) | |
Text
,
~
/'goasag s
f'g UNITE 3 STATES
['
.g f q
NUCLEAR RE ULATCRY COMMIS$lON F
g I
W A$HINGTON, D. C, PMH
- g...../
f li January 9. 1990 r
Docket Nos.: 50-352/353 50-277/278 l
Mr. George A. Hunger, Jr.
Director-Licensing, MC 5-2A-5 Philadelphia Electric Company Correspondence Control Desk P.O. Box No. 195 l
Wayne, Pennsylvania 19087-0195 O m Mr. Hunger:
SUBJECT:
REVIEW OF 60-DAY RESPONSE TO GENERIC LETTER 88-70, INDIVIOUAL PLANT EXAMINAT10NS (IPE) (TAC NOS. 74427/74428/74448/74449) 1 RE:
LIMERICK GENERATING STATION, UNITS 1 AND 2 I
PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 I
Generic Letter 88-20 requires in part, that each operating reactor licensee I
and construction permit holder: (1) identify the appr0ach and method selected forperformingtheIPE,(2)describethemethodtobeused,and(3) identify the schedule for performing the IPE and submitting the results to the NRC.
This information was to be submitted to the NRC within 60 days of issuance of Supplement 1 6f the generic letter.
l 5
We have reviewed your letter dated October 31, 1989 submitted in responsetothereportingrequirementsofthegenerIcletter, We conclude
'3 L
that your IPE approach, methodology and schedule are acceptable. However, as we stated in Generic Letter 88-20, we expect that uti1 M ies with extensive PRA 5
experience, which would include the Philadelphia Electric Company, will submit 1
their IPE results on a shorter schedule than 3 years. We therefore encourage i
you ta submit your IPE results on a more expeditious schedule to help avoid any possible delays between your completion of the IPE and our review process due to the expected backlog at the end of the 3-year period. We anticipate l
l' that any possible additional analysis or reporting requirements, such as those
,from external events or from the Containment Performance Improvement Program, I
will not have any adverse effect on your schedule. However, if your schedule
- should change, please notify the NRC of the proposed change and the reason for 3
the change.
l t
k 5
i t
9001160111 900109 0
/
r~~~w
+
d Mr. George A. Hunger, Jr.
Limerick Generating Station Philadelphia Electric Company Units 1 & 2 l
CC:
Troy B. Conner, Jr., Esquire Thomas Gerusky, Director Conner and Wetterhahn Bureau of Radiation Protection 1747 Pennsylvania Ave., N.W.
PA Dept. of Environmental Resources Washington, D. C.
20006 P. O. Box 2063 i
Mr. Rod Krich 52A 5 Philadelphia Electric Company Single Point of Contact 955 Chesterbrook Boulevard P. O. Box 11880 3
Wayne, Pennsylvania 19087-5691 Harrisburg, Pennsylvania 17108-1880 Mr. Graham M. Leitch, Vice President Mr. Philip J. Duca i
Limerick Generatirg Station Superintendent Technical Post Office Box A Limerick Generating Station Sanatoga, Pennsylvania 19464 P. O. Box A Sanatoga, Pennsylvania 19464 j
Mr. James Linville U.S. Nuclear Regulatory Comission Marty J. McCormick, Jr.
t Region I Plant Manager i
475 Allendale Poad Limerick Generating Station King of Prussia, PA 19406 P.O. Box A Sanatoga, Pennsylvania 19464 1
Mr. Thomas Kenny Senior Resident Inspector US Nuclear Regulatory Comission P. O. Box 596 Pottstown, Pennsylvania 19464 Mr. Ted Ullrich Manager - Pro.iects limerick Generating Station P. O. Box A Sanatoga, Pennsylvania 19464 4
Mr. John Doering Superintendent-Operations Limerick Generating Station P. O. Box A Sanatoga, Pennsylvania 19464
IN Mr. George A. Hunger, Jr.
Peach Bottom Atomic Power Station, Philadelphia Electric Company Units 2 and 3 i
L cc:
1 Troy B. Conner, Jr., Esq.
Single Point of Contact 1747 Pennsylvania Avenue, N.W.
P. O. Box 11880 i
Washington, D.C.
20006 Harrisburg, Pennsylvania 17108-1880 Philadelphia Electric Company Mr. Thomas M. Gerusky, Director ATTN: Mr. D. M. Smith, Vice President Bureau of Radiation Protection Peach Bottom Atomic Power Station Pennsylvania Department of I
Route 1. Box 208 Environmental Resources Delta, Pennsylvania 17314 P. O. Box 2063 Harrisburg, Pennsylvania 17120 Philadelphia Electric Company ATTN:
Regulatory Engineer, Al-2S Mr. Albert R. Steel, Chairman Peach Bottom Atomic Power Station Board of Supervisors Route 1 Box 208 Peach Bottom Township Delta, Pennsylvania 17314 R. D. #1 Delta, Pennsylvania 17314 Resident Inspector i
U.S. Nuclear Regulatory Comission Public Service Commission of Maryland Peach Bottom Atomic Power Station Engineering Division P.O. Box 399 ATTN: Chief Engineer De'ta, Pennsylvania 17314 231 E. Baltimore Street i
Baltimore, MD 21202-3486 Regional Administrator, Region I U.S. Nuclear Regulatory Comission Mr. Tom Magette 475 Allendale Road Power Plant Research Program King of Prussia, Pennsylvania 19406 Department of Natural Resources B-3 L
Mr. Roland Fletcher Tawes State Office Building l
Department of Environment Annapolis, Maryland 21401 201 West Preston Street Baltimore, Maryland 21201 1
L L
l l
1 i
y,
.,,... i Should you have any questions concerning the requirements of the generic letter, please contact Mr. Michael L. Boyle, NRR at (301) 492-1308 or Mr. John H. Flack, RES at (301) 492-3979.
[
Sincerely, f
/$/
f Walter R. Butler Directnr-Project Directorate 1-2 Division of Reactor Projects 1/11 Office of Nuclear Reactor Regulation cc: See next page DISTRIBUTION:
DocteL U le.
M0'Brien NRC PDR/LPDR OGC SVarga/BBoger PDI-2 Reading EJordan ACRS(10)
WButler BGrimes RClark/GSuh M. Boyle J. Flack
((PDI-2
)
Pil p
fYPDI-2/PM PDI-2/D MlH n
RClark:tr GSuh:tr WButler
/90
[//90
/ /90 l / /00
.