o-d NOV 121971 Docket Nos. 50-398 and 50-399 Nathan M. Neinmark Consulting Engineering services 1114 Civil Engineertag Building University of Illinois Urbana, 1111acis 61807 Centlemen:
l l
Contract No. AT(49-5)-2667
^
Esthan M. Naineark Consulting Engineering services is hereby requested, pursuant to the conditions of Centract AT(49-5)-2667 to. provide tha l
l fo11 ewing services for. the commission eeneerning the construction permit safety review of Pacific Gas and Electric Company's Mendocimo Power Plant - Units 1 and 2 1.
Perform a general review and evaluation of the seismic design and l
analyses applicable to Seismic Design Category I structures, systems.
and components, other than those pressure-containing components such as pumps, valves, piping and vessels covered by the applicable ASME Component Codes and ANSI Piping Codes, with specific attention to the adequacy of the following:
i l
(a) Proposed response spectra and/or time histeries with respect j
to horisontal, vertical, and torsional esaponents of seismic ground and floor motion.
(b) The desiga criteria applicable to Category I structures, and the safety margins associated with these criteria taking into aceoent the proposed load factors and those loading combi-nations which include seismie loads.
(c) The specified limits of allowable design stresses, ultimate strengths, strains, and deformation for the various construe-tien materials which will be used in Category I structures.
t (d) stiffness and flexibility properties of Category. I structures with relation to material properties, stress level and CA geometric shapes.
111 e 1J
.n 8710200133 871014 PDR FOIA Pud.:.f' 4
omes >
SCHARA87-462 PDR
$URNAME>
i DATE>
Form ABC-Ste (Rev.9-$3) ABCM 0240
- u s oovtaweNT NNTWO OFFICE 1,71 416 468 l
35 a
u m...,,,,
Nathan M. Neumark
- Consulting Engineering Services (e) The seismie design eriteria applicable to Category I systmas and
'l components, other than those components such as pisaps, valves, piping and vessels covered by the applicable ASME Component Codes and ANSI Piping Codes.
(f) Damping factors as related to the stress levels and modal distribution applied to structures, systems, and components.
(g) Mathematical models and associated analytical methods and procedures for seismic system design of structures, including structure-soil interaction.
(h) Testing methods proposed in lieu of specific analyses or in justification of seismic design methods.
(i) Seismic design eensideration applied to common boundaries between Category I and either Category II or Category III structures and related plant fontures.
o 2.
Prepare and furnish a sessmentary on the items reviewed and any areas of eencarn within the scope of 1 above, including preliminary con-clusions which may serve as a basis for the final summary conclusions of item 3 below.
3.
Propers and furnish a " Seismic Design Consultant Report for Mendocino Power Plant - Units 1 and 2" containing a summary of the conclusions reached, based on the evaluation of the preliminary design within the scope of 1 above, taking into secount (a) the information submitted by the applicant, (b) discussions held with the AEC regulatory staff, and (c) AEC meetings with the applicant and its seismic design consultants in which ye4 may have participated.
4.
Serve es an expert witness in the public hearing on this facility, if required.
Your initial review of the documents enclosed should include the identifi-estion of areas of concern and areas requiring additional information, within the scope of 1 above. Please advise us, at the earliest opportunity, of. the results of this initial review and any additional information needed so that we may add your information requests, as appropriate, to those whiah the ABC will transmit to the appliaant. Copies of the amendments prepared by the applicant. La response of these AEC requests for supple-meetal information will be forwarded to you upon receipt.
~
omes>
suuAut >
earr >
Foran AEC-318 (Rev 9 53) AECM 0240
- v s covERNMENT MilNTlHQ OFFICE 1 71 4 l,=46,
[ b-s]L O ' i
~-?
' _' ~i f -
Y C'
^~
~I
~
~
1 i
Nathan M Newmark NOV i2 1p1 l
Consulting Engineering Services
.)
l J
l Volumes I through VI of the PSAR for this facility are enclosed for your use.
All correspondence and reports as may be required to comply with this Work Directive for services shall be addressed to Mr. Edson G. Case, Director, Division of Reactor Standards, U. S. Atomic Energy c-insion.
I Washington, D.C.
20545. All costs shall be itemized and requests for reimbursement shall be submitted on a monthly basis.
The initial amount payable to your firm in order to perform the services requested in 1 through 3 above is $4,000; item 4, if required, will be j
costed separately. You will be advised of our; schedule requirements for the initial review, the c - tary and the final report.
l Reports"concerning work for others shall be made in accordance with l
Article I, paragraph (d) and Article XV of the Contract.
This constitutes a Work Directive pursuant to Artic1= I, paragraph (b) of Contract AT(49-5)-2667. Allotherrequirementsspecifiedin Contract AT(49-5)2667 remain unchanged.
1 Sincerely, odgint Si:nd S
'i E G. Can Edson G. Case, Director Division of Reactor Standards (Authorized Representative for the Contracting Officer)
Enclosures Volumes 1 through VI of the PSAR bcc: HKShepar, OGC EGCase, DRS JIAmith, DC REMaccary, DRS DDandois, DE DFLange, DRS KYorro, DRS v8Devison, DRS RSBoyd, DRL BWR-2 DEL g-7 SKari, DEL g,
h//M-y pg yoggcEN_...g g
..... -fe)S s pII, R
E D
.Cadd
_I A
- . =g e
fil Ref-1-4 Yorro tt Smith Da son Lange ry summe >
10/26/71 mr> _104.../11.....19L2.7/71
.10ff,J71,,,,,_10py_/71 10 # /71 if/G/7f Foran ABC-Si8 (Rev 9-53) ABCM 0240
- u s cov man =t enwvino oreca. t,71 4ie-ae s l
.ni,p. +v vpe
- ,7
=e e A
.e*.*/"
4 W "'* f%
9, j 9 ? P~'1>
dd*"
'?-
P
,4 g
- .'*=
%*i S+{ D'
?
--*g**
"8W*-
"q 44F