Forwards Insp Rept 50-029/87-02 on 870127-0417 & Notice of Violation.Violation Re Inadequate Reviews of Temporary Change Permitting Incorrect Removal of Main Coolant Pressure Chanel from Svc Assigned Severity Level IV
ML20214D155
Person / Time
Site: Yankee Rowe
Issue date: 05/12/1987
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Heider L
YANKEE ATOMIC ELECTRIC CO.
Shared Package
ML20214D157 List:
References
RTR-NUREG-0660, RTR-NUREG-0737, RTR-NUREG-660, RTR-NUREG-737 NUDOCS 8705210223
Download: ML20214D155 (2)


See also: IR 05000029/1987002

Text

-

,

-

s

c1

i MAY 131987

\

Docket No. 50-29

4

Yankee Atomic Electric Company

ATTN: Mr. L. H. Heider

Vice President of Operations

1671 Worcester Road

Framingham, Massachusetts 01701

Gentlemen:

Subject: Inspection No. 50-29/87-02

This transmits the January 27 - April 17, 1987 resident inspection findings by

Mr. H. Eichenholz of this office at the Yankee Nuclear Power Station, Rowe, Massa-

chusetts. Those findings were based on observation of activities, interviews, in-

dependent measurements, and document reviews, and have been discussed with

Mr. N. St. Laurent of your staff.

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth in the

Notice of Violation, enclosed herewith as Appendix A. This violation has been

categorized by severity level in accordance with the " General Statement of Policy

and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (Enforcement

Policy). You are required to respond to this letter and in preparing your response,

you should follow the instructions in Appendix A.

The violation (described in Appendix A) concerns the inadequate reviews, by both

the cognizant department supervisor and the shift supervisor, of a temporary change

request that permitted the incorrect removal of a main coolant pressure channel

from service, which resulted in the inadvertent actuations of a safety injection

and nonessential containment isclation systems.

Additionally, on March 18, 1987, Mr. Eichenholz provided Mr. B. Drawbridge of your

staff a detailed evaluation of licensee event report (LER) quality, Attachment I

to the enclosed inspection report, which was used as input to the Systematic As-

sessment of Licensee Performance of Yankee Nuclear Power Station for the period

from February 1, 1985 to October 6, 1986. The LER evaluation was made by the NRC

using the basic methodology presented in NUREG/CR-4178, March 1985.

Your cooperation with us in this matter is appreciated.

Sincerely,

CriRinal Sisued BgL

Edward C. Wenzinger, Chief j

Projects Branch No. 3 '

-

Division of Reactor Projects j

070521%

PDR A $hho$29

PDR

G

( (

. - - -

-

Yankee Atomic Electric Company 2 MAY 121!BT

Enclosures:

1. Appendix A, Notice of Violation

2. NRC Region I Inspection Report Number 50-29/87-02

cc w/encls:

N. N. St. Laurent, Plant Superintendent

J. E. Tribble, President

G. J. Papanic, Jr. , Senior Project Engineer - Licensing

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Massachusetts (2)

bcc w/encls:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encls)

DRP Section Chief

M. McBride, RI, Pilgrim

W. Raymond, SRI, Vermont Yankee

J. Clifford, LPM,-NRR

Robert J. Bores, DRSS

I:D,p RI: .

ZU

E chenholz/meo Els(asser e zipger

5/H/87 Slts/gy [jglgy

0FFICIAL RECORD COPY

J