{DocketNo'50-029
-November 8, 1990-s Mr. George Papanic, Dr.
1 O4
. Senior Project Engineer --Licensing d
Yankee Atomic Ele'.tric_ Company
>580 Main Street
' ~
Bolton, Massac>.usetts 01740-1398 1
Dear Mr. Paranic:
'SUBdECT: MAINTENANCEACTIVITYFORYANKEENUCLEARPOWERSTATION-(YNPS) CONTROL R0D RELATCH By Yankee Atomic Electric Company letter dated November 3,1990, N. N. St. Laurent stated that after the summer refueling outage, control rod number twenty four-(24) l was found to be disconnected from its drive shaft.. The reactor had been up to
. Mode.2:while pre-start testing was being done. The reactor was put into Mode 5
,^
whichdidnotconstituterefuelingoperations(Mode 6).
In Mode 5, the reactor
_headLis in place and all studs are fully tensioned. The. manipulator crane and the-universa1' handling. tool; are routinely used to_ latch onto control rods but
-this_ requires'the reactor.to be in Mode 6 with-the head removed. With the reactor-theadsin; place.however, the proper location of the manipulator crane and the tuniversall handling tool was not feasible.
., kthe-November 3,1990 letter, Yankee outlined the approach for performing.
'lthe maintenance evolution,to relatch the control rod. That maintenance effort
' was alsoidiscussed in telephone conferences on November 2, 1990 and Hovember 3,
<s i
1990.: NRC evaluated the information provided in both the letter and telephone 4",
i conference calls ~ and concluded that your method for~ relatching the rod was
. acceptable. This,was communicated in a phune call on November 3, 1990, 1
The maintenance operation was witnessed by^ Thomas Koshy,.NRC's Sr. Resident
'. Inspector-at' YHPS on November 4,1990 who reported that the maintenance'
-operation was successful and-the control rod was relatched.
l Sincerely, y
y
' Original signed by:
y.
Patrick M. Sears, Project Manager 1
j.
Project Directorate I-3
'I
,w Division of Reactor Projects I/II Office of Nuclear Reactor Regulation -
F t
Lcc:_LSee next page-f
")*See previous concurrence 3 --
PC 3(A)*
MR ro k P Sears:ces C
/
90-11/07/90 1 f/90 j
.0FFICIAL RECORD COPY c
Document Name:. MAINTENANCE ACTIVITY YR d0 o
". ',~
PDR ADOCK 05000029 9011130232 901108
- i i
P PDC
.j
L
~
' Docket-No.50-029 i
Mr. George Papanic, Jr.
Senior Project Engineer - Licensing 4
Yankee Atomic Electric Company 580 Main Street
- Bolton, Massachusetts 01740-1398
Dear Mr. Papanic:
i y
SUBJECT:
MAINTENANCE ACTIVITY FOR YANKEE NUCLEAR POWER STATION (YNPS) CONTROL-ROD RELATCH ByLYankee Atomic Electric Company letter dated November 3,1990. N. ' N. St. Laurent i
-stated that after the summer refueling outage, control rod number twenty four (24)
- was found to be disconnected from its drive shaft. The' reactor had been up to-Mode'2 while pre-start testing was being done. The reactor was put into Mode 5
=which did not constitute refueling operations (Mode 6).
In Mode 5, the reactor-head is in place and all studs are fully tensioned. The manipulator crane and
cthe universal handling tool;,are routinely used to latch onto control rods but-4 this requires the reactor to be in Mode 6 with the head removed. -With the-reactor head.in place however,- the proper location of the manipulator crane and the universal; handling tool was not feasibic.
In the November 3 1990-letter, Yankee outlined the approach for performing
- the' maintenance evolution to relatch the control rod. That maintenance effort-was'also discussed:in telephone conferences on. November 2, 1990 and November 3, 1990.- NRC evaluated the information provided in both the letter and telephone conference ils and concluded that your method for relatching the-rod was acceptable..
This was communicated on a phone call on November 3, 1990..
The maintenance operation was witnessed by Thomas Kosby NRC's Sr. Resident inspector'at YNPS;on November 4,1990 who reported that the maintenance operation was successful:and-the control rod was relatched.
Sincerely,.
l 4
Patrick H. Sears, Project Manager Project Directorate I-3
. Division of Reactor Projects I/II Office of Nuclear Reactor Regulation i
cc: See next-page g
LA:PDI-3 PD:PDI-3 )*
MRushbrook PMSears:mes CCowgill
/ /90 l\\ /1/90 Il/q /90 0FFICIAL RECORD COPY
. Document'Name: MAINTENANCE ACTIVITY YR t
i l
gp !
1;
- ~
l1 (S
i p
f Mr. George Papanic, Jr.
. Yankee Rowe s
CC:.
. Dr. Andrew C. Kadak. President Mr. Jay K. Thayer and. Chief Executive Officer.
Vice-President And Manager
-Yankee Atomic Electric Company of Operations u
580 Main Street Yankee Atomic Electric Company Bolton, Massachusetts, 01740-1398 580 Main Street i
Bolton, Massachusetts 01740-1398 Thomas Dignan, Esquire Ropes and. Gray-225 Franklin Street-Boston, Massachusetts 02110 f
P
~ Mr.' N. N. St. Laurent
' Plant Superintendent-Yankee Atomic Electr.ic Company Star Route-
~'Rowe, Massachusetts 01367 g
/
! Resident' Inspector LYankee. Nuclear: Power Station iU.S. Nuclear Regulatory Consnission Post Office Box 28 Monroe Bridge, Massachusetts 01350 Regional Administrator, Region I
't -
U.S.' Nuclear Regulatory Consission
- 475 Allendale Road
~
- King of Prussia,' Pennsylvania-.-19.406 i
- Robert M. Ha111sey,' Director
~
Radiation Control: Program 1
Massachusetts:Departmenm of Public Health
!150 Tremont' Street. 7th:'loor' JBoston, Massachusetts 02:11
-Mr. George Sterzinger Consissioner Vermont Department of Public Sery;ce o
120 State' Street, 3rd Floor Montpelier, Vermont 05602'
. Ms. - Jane M.' Grant--
Senior Engineer - License Renewal Yankee Atomic Electric Company
-580 Main Street a
- Bolton,. Massachusetts 01740-1398 y
W
- ['
i v i:
-4*
i i
DISTRIBUTION:
qm 0fiTIQ -
NRC PDR-Local PDR' PDI-3 Reading 1
S. Varga-B. Boger o
M. Rushbrook-P. Sears C. Cowgill-OGC - 15 G18-E. Jordan - MNBB 3201 ACRS(10)-P135
~J. Johnson, Region I.
j e
,i
-i
-.:-....