May 16,1997
Ms. Jane M. Grant
Decommissioning Manager
~ Yankee Atomic Electric Company
580 Main Street
'
Bolton, Massachusetts 01740-1398
,
SUBJECT: NRC INSPECTION REPORT NO. 50-29/97-01
-
l
Dear Ms. Grant:
On March 31,1997, the NRC completed an inspection at your Yankee reactor f acility in Rowe,
'
Massachusetts. The enclosed report presents the results of that inspection.
i
During the period covered by this inspection, your conduct of activities at the Yankee facility
was generally characterized by safety-conscious operations and careful radiological controls.
Within the scope of this inspection, you had in place effective programs for protecting the
safety of workers during dismantlement and decommissioning activities. Employee training
and information given to workers regarding working in radiation areas was very good. Internal
and external radiation exposure controls were also very good. Housekeeping in radiological
i
areas was not consistent, and some management attention is required. However, trending of
worker performance indicated better compliance with radiological procedures. Control of
radioactive materialand contamination was effective. Audits, appraisals and self-assessments
continued to improve the quality of the radiation protection program and the physical security
i
program.
Your staff continued to perform good planning for decommissioning and
dismantlement activities, including maintaining occupational exposures ALARA. Radioactive
,
materialand radioactive waste shipments were performed safely, and shipment records were
j
well maintained. The radioactive liquid and gaseous effluent control program and the
'
radiological environmental monitoring program were effectively implemented. The security
program was effectively implemented to protect public health and safety.
No major
,
deficiencies or violations of regulatory requirements were identified.
I
Your cooperation with us is appreciated.
I
Sincerely,
Original Signed By:
John R. White, Chief
f
Radiation Safety Branch
Division of Reactor Safety
/
,
Docket No. 50-29
3Q
,
License No. DPR-03
i
.
.
9705280095 970516
IlgllHillElllllllllllllllEl
i
ADOCK 05000029
IluillEllEmillsiunlalalEl
l
"
G
,
_
_
._
. _ . _
~ .
.__
..
_ _ _
. . _ .
__
_ _ _
. _
,
1
.
i
-
Jane M. Grant'
2
Enclosure: NRC Region i Inspection Report No. 50 29/97-01
cc w/ encl:
A. Kadak, President and Chief Executive Officer
K. Heider, Site Manager
R. Hallisey, Department of Public Health, Commonwealth of Massachusetts
T. Dignan, Esquire
i
B. Holmgren, Engineering / Licensing Manager
R. Sedano, Commissioner, Vermont Department of Public Service
T. Rapone, Massachusetts Executive Office of Public Safety
L. Stevens, New England Conference of Public Utilities Commissioners, Inc.
Citizens Awareness Network
D. Screnci, PAO (2)
Commonwealth of Massachusetts, SLO Designee
State of Vermont, SLO Designee
Distribution w/ encl:
Region i Docket Room (with concurrences)
PUBLIC
Nuclear Safety Information Center (NSIC)
{
J. Wiggins, DRS
J. White, DRS
l
J. Nick. DRS
)
D. Screnci, PAO
DRS File (1)
Distribution w/enci (VIA E-MAIL):
W. Dean, OEDO
M. Fairtile, NRR
S. Weiss, NRR
Inspection Branch, NRR (IPAS)
1
DOCUMENT NAME: G:\\RSB\\ NICK \\YR9701. INS
Ta receive e copy of this document, indicate in the bos: "C" = topy without ettechmentlenclosu,o
- E' = Copy with attechment/ enclosure
- N* = No copy
l
OFFICE
Rl/DRS
l
Ml/DpSj
l
/
l
l
g
NAME
JNICK
JP
@%m
DATE
05/19/97
4f /B7
05/
/97
05/
/97
05/
/97
l
OFFICIAL RECORD COPY
t
l