Ack Receipt of Re Violations Noted in Insp Rept 50-029/89-80
ML20056A744
Person / Time
Site: Yankee Rowe
Issue date: 07/25/1990
From: Gallo R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Kadak A
YANKEE ATOMIC ELECTRIC CO.
References
NUDOCS 9008090139
Download: ML20056A744 (2)


Text

{{#Wiki_filter:a.

y

.c i i . . r c JUL 2 51990 ' Docket No. 50-29 Yankee Atomic Electric Company , ! ATTN: Dr. Andrew C. Kadak President and Chief Operating Officer 580 Main Street ! Bolton, Massachusetts 01740-1398 Gentlemen: (- l Subject:. Inspection Report No. 50-29/89-80 ! This refers to your letter dated April 23, 1990, in response to our letter j dated February 16, 1990.

g Thank you for informing us of the corrective and preventive actions documented ' in your letter. These actions will be examined during a future inspection of , your licensed program.

.Your cooperation with us.is appreciated.

Sincerely, , n 5 cinal cicma DD t r ROBERT M. GALLO Robert M. Gallo, Chief Operations Branch Division of Reactor Safety CC N. St. Laurent, Plant Superintendent G. Papanic, Jr., Senior Project Engineer - Licensing R.' Hallisey, Dept of Public Health, Commonwealth of Massachusetts L_ Public Document Room (PDR) , Local Public Document Room (LPDR) Nuclear Safety Information Center (NSIC) NRC Resident inspector Commonwealth of Massachusetts, SLO Designee , State of Vermont, SLO Designee 9000090139 900725 T' h PDR ADOCK 05000029

PNV , t(( 000007 0FFICIAL RECORD COPY RL YR 89-80 - 0001.0.0 07/06/90 ' f0l \\/

p iv. - i -f ,. '

' t., .- ,;. . ' . - , Mag;. ' fs 4.r; ., h'. '. f,d 5 $. - 4:' l.;. ', L,' 6 P , .c - riv .f,, d;, gj i - n o, , , . ,f

4 sy (1 m; R .,qf Q, ' m'- , ' H wyr, o - - e; , ' f 'c ' ' -LYankee4tuicE1EctricCompany: '2 -; ' .

.i

.; . . ., m }$ e> - ' . , s , ., o " c,:s 5r Ebec w/ enc 1:- l

Region'I. Docket Room.(with1 concurrences)-

$f' ~M.-Perkins,DRMA(w/oenc1), '; d's R.~Bellamy, DRSS t; i -' J.-Rogge, DRP-- i ' , ' s a R.-Gallo DRS: UE, .T. Koshy,,: SRI . Yankee'('w/ concurrences) .

, 4-d , ~ ..H. Eichenholz,< SRI - Vermont Yankee ,! EJ,' Johnson, DRP. fjj% < ' > 4' $- K. Abraham,PA0(20)SALPReportand(2)AllInspection-Reports ' ' ' J.?Caldwell, EDO~ ' ' ' ' i ' , s% - M. Fairtile,.NRR - '! , ! >P.-Eselgroth' DRS i . W' m, ' .L2. Briggs,DRS ..

-DRSFiles(3)

. ;

.; . +

i - .- e , - ' ' y, :

' ' . jA l ' , . , n ,.%- .: o. m.. s ..,e . . , g, ._- , - .. I' 'E

,-:

, a g _.; l 0 } ' !4-i ' } p.' Jf '

, '

-l ' . ,

y t i ' ,g

9-[;l ! '

a

,

w . y q ~- ; :<. , , . cy jN ' , i ,& , (

hW 7 j , ., y l :i. e

-

..

, LRI:DR RI:0RS R RS

c.. , [[ g Brig'g kl-seigjoth G.1 p 07[r

)4 07// 0 /90 07//f/90 ] 0- ' i ,b@

, ?>< OFFICIAL RECORD COPY RL:YR 89-80 - 0002'0.0 J . " ' 07/06/90 .e ,s.

, ' t 4f f pg { ' , ,,

  • 'I.',

I t ,

_.. . . - , - . , .... - -... . . - . - .. - .

r.- ._ YANKEE ATOMICELECTRIC COMPANY "%@"l,1. *,)l7,'l" ' c -

. . i W~... 580 Main Street, Bolton, Massachusetts 017401398

YANKEE ./ April 23, 1990 BYR 90-57 United States Nuclear Regulatory Commission . Document Control Desk Washington, DC 20555 References: (a) License No. DPR-3 (Docket No. 50-29) (b) Letter, USNRC to YAEC, " Inspection Report No. 50-029/89-80," dated February 16, 1990 Subject: Response to List of Identified Items in Inspection Report i No. 50-029/89-80 Dear Sir , Reference (b) documents a special team inspection of the emergency procedures conducted on November 6 through 14, 1989 at the Yankee Nuclear Power Station, Rowe, Massachusetts. Reference (b) requested that Yankee ! Atomic ' respond ta the identified concerns sununarized in Attachment 3 to the ! inspection report.

Yankee Atomic's response to each of the items is provided below: Item No. 89-80-01: Develop and implement off-normal Operating Procedure (OP) to_ address an SGTR that is greater than Technical Specification but less than make-up capability.

Response Appropriate plant procedures were implemented on February 14, 1990 to address this concern. This item can j

, ' be considered closed.

! Item No. 89-80-02: Upgrade Deviation Justification documentation to more

fully detail justification for deviations.

,- ' ? , I.

l -.- .- - - - - - - - - - - - - . - - - - - - - - - -.

- - - . ,. . . United States Nucloor R3gulatory Commission April 2.1, 1990 Attention: Document Control Desk Page 2 f , t These actions will be completed prior to restart f rom the Response Core 21 refueling outage.

Item No. 89-80-03: Review E0Ps to determine conformity with Writer's Guide (WG) and correct identified deficiencies.

Responset These actions will be completed prior to restart from the Core 21 refueling outage.

Item No. 89-80-04: Correct in-plant labeling of equipment associated with the performance of E0Ps, Off-Norma *. ops and procedures directly referenced from E0Pa.

Response Identification of in-plant and in-Control Room labeling needs have been completed.

Except for containment and rotating equipment, the in-plant corrections have been implemented.

Control Room changes await final review and approval.

In all cases, the corrections will be completed prior to restart from the Core ?.1 refueling outage.

Item No. 89-80-05: Review level of detail of E0Ps and their attachment 6 and the deficiencies identified in Attachment 2 of this report . and incorporate appropriate changes.

These actions will be completed prior to restart from the Responset Core.21 refueling outage.

Item No. 89-80-06: Develop and implement an EOF maintenance program and an objective means to determine the level and type of operator training required to address revisions to E0Ps.

Responset These actions will be completed prior to April 30, 1990.

Item No. 89-80-07: Perf orm in-plant walkdowns of all Of f-Normal ops and EOP attachments and all procedures directly referenced from the E0Ps.

Revise AP-0001 to requiro in-plant walkdowns of ops during their biennial review.

All Off-Normal ops and procedures directly referenced from Responset the E0Ps have received in-plant walkdowns. These actions were completed prior to February 28, 1990.

In-plant walkdowns of E0P attachments will be completed prior to restart f rom the Core 21 refueling outage. AP-0001 has been revised to require in-plant walkdowns of ops during their biennial review.

I lll

' ' ~. , - . s f United St.:t:s Nucle:r R:gulot:ry Commissitn April 23, 1990

. ' Attention: Document Control Desk Pcge 3 ,- ' i , If you have any questions or desire additional information, please ) - contact us.

l ! Very truly yours, YANKEE KtOMIC ELECTRIC COMPANY J. DeVincentis i Vice President JDC/tlp/WPP77/44-cc USNRC Region I USNRC Resident Inspector, YNPS , l

. < I

+ ., YANKEE ATOMIC ELECTRIC COMPANY "'Q"l,1.*,*,ylf,'l" ' . , 'm.

. , . S80 Main Street, Bolton, Massachusetts 01740-1398 ~ . w eE . KE , i April 23, 1990 BYR 90-57 , United States Nuclear Regulatory Commission Document Control Desk - Washington, DC 20555 f References (a) License No. DPR-3 (Docket No. 50-29) ' (b) Letter, USNRC to YAEC, " Inspection Report No. 50-029/89-80," dated February 16, 1990 ! Subject: Response to List of Identified Items in Inspection Report No. 50-029/89-80 , Dear Sir ' i Reference (b) documents a special team inspection of the emergency procedures conducted on November 6 through 14, 1989 at the Yankee Nuclear Power Station, Rowe, Massachusetts. Reference (b) requested that Yankee . Atomic respond to the identified concerns summarized in Attachment 3 to the , inspection report. Yankee Atomic's response te each of the items is provided below: Item No. 89-80-01: Develop and implement off-normal Operating Procedure (OP) to address an SGTR that is greater than Technical Specification but less than make-up capability.

Response: Appropriate plant procedures were implemented on February 14, 1990 to address this concern. This item can , be considered closed.

Item No. 89-80-02: Upgrade Deviation Justification documentation to more fully detail justification for deviations.

! l l l-- i - - _ _ _ _ _. _, , . m , . -,

g ,. - -. _ _ _ _ _ _ - , . .

Unit:d St t s Nucle:r R:gul ttry Commissitn April 23, 1990 l - Attention: Document Control Desk Pcg3 2 - , , Response These actions will be completed prior to restart from the ! Core 21 refueling outage.

Item No. 89-80-03: Review ECPs to determine conformity with Writer's Guide (WG) and correct identified deficiencies.

Response These actions will be completed prior to restart from the Core 21 refueling outage.

Item No. 89-80-04: Correct in-plant labeling of equipment associated with the performance of E0Ps, Of f-Nornal ops and procedures directly referenced from E0Ps.

- Response: Identification of in-plant and in-Control Room labeling

needs have been completed.

Except for containment and rotating equipment, the in-plant corrections have been implemented. Control Room changes await final review and

approval.

In all cases, the corrections will be completed prior to restart from the Core 21 refueling outage.

Item No. 89-80-05 ' Review level of detail of E0Ps and their attachments and

the deficiencies 149ntified in Attachment 2 of this report . and incorporate appropriate changes.

I Response: These actions will be completed prior to restart from the Core 21 refueling outage.

Item No. 89-80-06: Develop and implement an E0P maintenance program and an objective means to determine the level and type of operator training required to address revisions to E0Ps.

Response: These actions will be completed prior to April 30, 1990.

Item No. 89-80-07: Perform in-plant walkdowns of all Off-Normal ops and E0P attachments and all procedures directly referenced _from the E0Ps.

Revise AP-0001 to require in-plant walkdowns of ops during ' their biennial review.

' Response All Off-Normal ops and procedures directly referenced from the E0Ps have received in-plant walkdowns. These actions were completed prior to February 28, 1990.

In-plant walkdowns of E0P attachments will be completed prior to restart from the Core 21 refueling outage. AP-0001 has been revised to require in-plant walkdowns of ops during their biennial review.

.

i '. .... ' g.

g United States Nuclear Regulatory Conunission ' April 23, 1990 ' Attention Document. Control Desk Page 3 , - ,

. ,. If you have any questions or desire additional information, please contact us.

Very truly yours.

YANKEE ATOMIC ELECTRIC COMPANY J. DeVincentis Vice President JDC/tlp/WPP77/44 cet USNRC Region I USNRC Resident Inspector, YNPS . }}