Forwards Combined Insp Repts 50-029/98-01 & 50-029/98-02 on 980101-0331.No Violations Noted
ML20236F339
Person / Time
Site: Yankee Rowe
Issue date: 06/24/1998
From: Mark Miller
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Williams F
YANKEE ATOMIC ELECTRIC CO.
Shared Package
ML20236F341 List:
References
50-029-98-01, 50-029-98-02, 50-29-98-1, 50-29-98-2, NUDOCS 9807020121
Download: ML20236F339 (3)


See also: IR 05000029/1998001

Text

._ -_ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

'

i

.

UNITED STATES

/'.. . . . . .,*\. NUCLEAR REGULATORY COMMISSION

3  : REGION I

, f 475 ALLENDALE ROAD

KING OF PRUSSIA, PA 19406

%%**/ i

June 24,1998 l

Mr. Frederick N. Williams

Plant Superintendent

Yankee Atomic Electric Company

49 Yankee Road

Rowe, Massachusetts 01367

SUBJECT: COMBINED NRC INSPECTION REPORT NOS. 50-29/98-01 and 50-29/98-02

Dear Mr. Williams:

On March 31,1998, the NRC completed an inspection at your nuclear reactor facility in

Rowe, Massachusetts. The enclosed report presents the results of that inspection. I

During the period covered by this inspection, your conduct of activities at the Rowe facility

was generally characterized by safety-conscious operations and careful radiological

controls. Within the scope of this inspection, you had in place effective programs for

protecting the safety of workers during dismantlement and decommissioning activities.

Internal and external radiatipn exposure controls were very good. Housekeeping in

radiological areas was very good and continued improvement was noted. Control of

radioactive material and contamination was very good and labeling of radioactive material

was excellent. Your staff was properly implementing the modifications to the spent fuel I

pool building. Overall, the YNPS final status survey program was consistent with the

j

recommendations of NRC and pertinent industry standards. Several areas for improvement

were noted for the final status survey program, particularly regarding assessment of scan

sensitivity. Additional decommissioning program elements will be assessed during the next -

-

inspection. No major deficiencies or violations of regulatory requirements were identified. O/

Your cooperation with us is appreciated.

Sincerely,

Original Signed By:

Marie T. Miller, Chief

c10le3 Decommissioning and Laboratory Branch

Division of Nuclear Material Safety

Docket No. 50-29

License No. DPR-03

Enclosure: NRC Region i Combined Inspection Report Nos. 50-29/98-01 and 50-29/98-02

9007020121 900624

PDR ADOCK 0500OO p 9

G

-__-____-_-- __-_- . _ _ _ - _ _ - _ _ _ - _ _ _ - _ _ _ _ _ _ _ _ _ _

__ - __ _ __-___-__--___-_--. - _ _ _ - _ - _ _ - _ __ _-- . _ _ _ _ - - _ .

.

.

Mr. F. N. Williams 2

cc w/ encl:

J. M. Grant, Decommissioning Manager, DE&S

K. Heider, Site Manager'and Manager of Operations

^

J. Kay, Principal Licensing Engineer, DE&S

R. Hallisey, Department of Public Health, Commonwealth of Massachusetts

T. Dignan, Esquire

B. Holmgren, Engineering Manager, DE&S

R. Sedano, Commissioner, Vermont Department of Public Service

T. Rapone, Massachusetts Executive Office of Public Safety

L. Stevens, New England Conference of Public Utilities Commissioners, Inc.

- Citizens Awareness Network

Commonwealth of Massachusetts, SLO Designee

State of Vermont,' SLO Designee

.

G 8

L_---.- - _ 2L _ L - . :_ _ .

.

.

Mr. F. N. Williams 3

Distribution w/ encl:

l Region 1 Docket Room (with concurrences)

!

PUBLIC

l Nuclear Safety Information Center (NSIC)

H. Miller, RA

D. Screnci, PAO (2)

Distribution w/enci (VIA E-MAIL):

B. McCabe, OEDO

M. Fairtile, NRR

S. Weiss, NRR

L.Pittiglio, NMSS

l PAS

DOCDESK

-

.

DOCUMENT NAME: G:\D&LB\YR\YR9802. INS

To receive a copy of this documers indicate in the box: "C" = Copy without attachment / enclosure

"E" - Copy with ettschment/ enclosure "N" = No copy

0FFICE RI/DNMS E RI/DNMS _, , '

l l l

NAME JNICKpv(t(cu,1a MMILL,EP/'/27/#/ l

I

DATE 06/24V98 4tt 6/fg/98 j

OFFICIAL RECORD COPY

,

__.