Text
,
g
4
.
'
-
.
'
'
NOV 0 61990
,
i
Docket No. 50-29
4
Yankee Atomic Electric Company
A'ITN: Mr. Jay Thayer
Vice President and
Manager of Operations
580 Main Street
Bolton, Massachusetts 01740-1398
Gentlemen:
!
!
Subject: Inspection Report No. 50-29/90-16
.
i
This refers to the routine resident safety inspection conducted by Messrs. T. Koshy and
M. Markley of this office on August 21,1990 - October 1,1990, at the Yankee Nudear Power
Station, Rowe, Massachusetts. The inspection consisted of observation of activities, interviews
."
with personnel and document reviews. The results of the inspection are described in the NRC
Region I Inspection Report enclosed with this letter and were discussed with Mr. N. St. Laurent
at the conclusion of the inspection.
l
i
Several observatioris during the ru;ent refueling outage are noteworthy. Your replacement of
!
the aging excore nuclear instrumentation system was considered a positive initiative. However,
!
.
problems noted during main coolant pump maintenance and the resultant occupational radiation
exposure warrant further management attention. In addition, the presence of a temporary
scaffold in the pressurizer cubicle and other transient materials in the vapor container during
,
. plant operation is of concern. Also, our inspectors verified t%t your staff completed an
observation of fuses installed in the containment; however, no assessment was made as to the
I
adequacy of the installed fuses.
Inadequate corrective actions to preclude repetitive emergency lighting failures resulted in a
violation of 10 CFR 50, Appendix B, quality assurance requirements. You are required to
!
respond to this letter and, in so doing, should follow the instructions in Appendix A. In addition
'
to your response to the Notice of Violation, please describe your actions to address the additional
concerns noted above.
Your cooperation in these matters is appreciated.
Sincerely,
ORIGINAL s!GNED iM
JON R. JOHNSON
Jon R. Johnson, Chief
i
Reactor Projects Branch No. 3
-
'
"2
Division of Reactor Projects
%, p ' f
Se
I
1
l
ww-
c
9011200097 901106
-
\\{
~ ~ ~ , ~ .
ADOCK 05000029
o
.
- - - - .
- -
- - .
-
m,. ,
.
I
.
NOV 0 61990
i
- -
.
.
Yankee Atomic Electric Company
2
,
- Enclosures.
1.-
Appendix A, Notice of Violation
2.
. NRC Region I Inspection Report No. 50 29/90-16
cc w/encls:
N. St. Laurent, Plant Superinteadent
G. Papanic, Jr., Senior Project Engineer - Licensing
R. Hallisey, Departnient of Public Health, Commonwealth of Massachusetts
Local Public Document Room (LPDR)
Public Document Room (PDR)
,l
- Nuclear Safety Information Center (NSIC)
, ,
- NRC Resident Inspector
Commonwealth of Massachusetts (2)
J
(
, s
s
7
'I
'
I.
i
,
..i
1
'9
1
'(
)
7
1
1
- i
1
,
.,u,..
.,
e, ; '
a.
<$
.
. . . _
9, ,, ' *l ,
, : . ,.
,
,
'
r.
4
,, ,
.
~ Yankee Atomic Electric Company
3
NOV 0 61990
-
bec w/encls:
'
Region I Docket Room (with concurrencesi
s
M. Perkins, DRMA (w/o encl)
';
J. Rogge, DRP
__
LT. Koshy, SPl - Yankee (with cor.cc cences)
'
'M. Markley, RI
R. Barkley, DRP
J. Johnson, DRP'
u
H. Eichenholz, SRI, Vermont Yankee
r
_
-J.L Macdonald, SRI,' Pilgrim
P. Sears, NRR
E
'
-
L.
1 R._ Bores, DRSS
'
y
R. Keimig, DRSS
'
- bec w/ Executive Summary Only:
'
<
C. Hehl, DRP
.
J.' Wiggins, DRP
'
M. Hodges, DRS
'
' J. Durr,- DRS -
-
-
'*
R.' Gallo,' DRS 3
R. Bellamy, DRSS
J
J. Joyner, DRSS
- R; Wer nan, NRR =
M. Fairtile, NRR
_
g
,
-
m
E--
.t
,
,
.
_
E
_
I
RI:DRP
RI:DRP
[
hy/meo
Rapf/@
pjb
-
-
ge
o nso o
-
Y 11/1/90
//f
_
OFFICIAL RECORD COPY
=
.
--
ii