ML20059N480

From kanterella
Jump to navigation Jump to search
Forwards Maint Team Insp Rept 50-029/90-81 on 900709-20 & 0806-10.Weaknesses & Unresolved Item Noted
ML20059N480
Person / Time
Site: Yankee Rowe
Issue date: 10/03/1990
From: Bettenhausen L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Kadak A
YANKEE ATOMIC ELECTRIC CO.
Shared Package
ML20059N485 List:
References
NUDOCS 9010160031
Download: ML20059N480 (2)


See also: IR 05000029/1990081

Text

i}-.f

c.-

g

y

1

m

j

.q

OCT

31990

Docket No. 50-29'

Yankee Atomic Electric Company

ATTN: Dr. Andrew C. Kadak

'

President and Chief Operating Officer

j

580 Main Street

i

Bolton, Massachusetts 01740-1398

-

Gentlemen:

Subject:

Inspection Report No. 50-029/90-81

j

This. letter transmits the-report of'the special maintenance team inspection' led

by Mr. D.' Caphton of this office from July 9 to July 20, 1990, and August 6-to-

August 10, 1990, at the Yankee Nuclear Power Station, Rowe, Massachusetts.,

Mr. Caphton discussed'the team's findings with you and other members of your

staff on July 20, 1990, and after the follow-up inspection on August 10, 1990.

This inspection was performed as part of NRC's industry wide effort to evaluate

i

-

the effectiveness'of maintenance activities at licensed power reactors. The

team concluded that a generally acceptable maintenance program is being imple-

mented at the Yankee Nuclear Power Station.

1

We request that you notify us in writing of actions taken or planned in order

to enhance your maintenance activities in the areas where weaknesses were

!

identified and to resolve the identified unresolved item.

Please provide this

J

. response within 60 days of receipt'of this letter.

'The responses directed by this letter and_the accompanying Notice are not

subject to the clearance procedures of the Off. ice of Management and Budget as

L

required by the Paperwork Reduction Act of 1980, PL 96-511.

Your. cooperation with us is appreciated.

Sincerely,

Original Signed Mi

q

Lee H. Bettenhausen, Chief

<

Operations Branch

Division of Reactor Safety

t

Enclosure: NRC Region I Inspection Report' 50-029/90-81

4

,

0FFICIAL RECORD COPY

IR YR 90-81 - 0001.0.0

g 7.g g

g

08/22/90

901bi'6'60Y1 901003

,

PDR

ADOCK 05000029

i

'

o

PDC

- - - -

-,

[ ' ) . .

,,

.

'

_

1. ;- >

'

-

,

,,

ie.

,

,i:

y,

,

,

6 Yarleel Aiomic' Electric Co;

2

4

H

,,

,

..

ccLw/ encl:-

lN. St'.xlaurent,. Plant' Superintendent.

-

.

'

. G. Papanic,JJr. ,o Senior Project Engineer

Licensing

.

R.L Hallisey, Dept. of Public Health, Commonwealth of Massachusetts-

>

Public Document' Room (PDR)1

Local Public Document Room (LPDR)

Nuclear Safety. Information Center-(NSIC)

R

NRC Resident Inspector.

Commonwealth'of-Massachusetts; SLO Designee

State.of Vermont, SLO Designee

bec . w/en~ci :

I

Region I-Docket Room (with concurrences)

Y

Management ' Assistant,; DRMA'(w/o encl):

S, Rhow, Electrical Engineer,'SICB,;NRR

1

,

R. Bellamy, DRSS

J. Rogge', DRP

4

LT. Koshy,- SRI' . Yankee (w/ concurrences)

-

H. Eichenholz, SRI - Vermont? ankee

Y

";_J.: Johnson, DRP.

- K,~ Abraham,- PA0 (20) SALP Report and (2) All Inspection Reports -

J._Caldwell,.EDO.

M Fairtile, NRR:

3

M. Hodges, DRS

R. Gallo, DRS

'

.N. Blumberg, DRS

D. Caphton, DRS .

<

R. Barkley Project Engineer, 'DRP

_!

s

4J..Dixon, Reactor Engineer

.

M; Good,- Consultant

J.<

10. Hoy, Reactor Engineer, DRS

h

R.-W. Winters, Reactor Engineer, DRS-

1

DRS' Files-(3) .

> '

1

A

r

l

.

7

.

h3'

i:

DRS:RI

DRS:RI

S:RI

l

DRS:R[I

L.

Caphton/ttp dmg:

-Bessette

Bettenhausen

Ho g

!

OB

,

-:09/12/90-

09/JF/90

/8///90

09/-

90

j

m

!

>

n

0FFICIAL RECORD COPY

IR YR 90-81 - 0001.0.1

3

c

08/22/90

p

Ni

\\

' rit

j

A

s..

.

..k*

l

_