ML20209C315
| ML20209C315 | |
| Person / Time | |
|---|---|
| Site: | Yankee Rowe |
| Issue date: | 07/01/1999 |
| From: | Reid D YANKEE ATOMIC ELECTRIC CO. |
| To: | Fairtile M NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| BYR-99-002, BYR-99-2, NUDOCS 9907090251 | |
| Download: ML20209C315 (2) | |
Text
OU INFORMATION' Telephone (413) 424 5261
/
~
~
- h. f 49 Yankee Road, Rowe, Massachusetts 01367
)
-d ANKEE
, ~
July 1, 1999
.BYR 99-002 U.S.
Nuclear Regulatory Commission Document Control Desk
)'
Washington, D.C.
20555 Attention:
Mr. Morton Fairtile Senior Project Manager l
Non-Power Reactor, Decommissioning and l
Environmental Project Directorate Divisior. of Advance Reactors and Special Projects
Reference:
(a)
License No. DPR-3 (Docket No. 50-29)
Subject:
Revision 09, Yankee Nuclear Power Station (YNPS) Security Plan
Dear Mr. Fairtile:
]
Yankee Atomic Electric Company (YAEC) submits Revision 09 to l
the Security Plan for the Yankee Nuclear Power Station (YNPS).
The proposed Plan changes specifically reflect that i
YNPS is permanently shutdown, defueled, proceeding with decommissioning activities, and continues to provide protection against radiological sabotage.
l The significant changes within Revision 09 are Redesignation of Security patrol routes for areas e
undergoing decommissioning and dismantlement.
Removing the specifications for designation of e
Industrial Area lighting.
e Yankee Atomic Electric Company and Yankee Nuclear Power Station organizational changes.
l e
Redefining the Industrial Area Boundary to meet future decommissioning needs.
090027 SAFEGUARDS INF0RMATION M TW Ducament Das liet Contais
- M I
9907090251 990701 l; f PDR ADOCK 05000029 Frern The belasse leend sect Be Protected e-c_
4 SAFEGUARDS INFORMATION j
e Removing the requirement to review the Access Authorization Roster every 31 days.
Removing the requirement to change or rotate security locks and cores on an annual basis.
Proposed Revision 09 of the YNPS Security Plan has been reviewed by the Plant Operations Review Committee (PORC) and determined to meet the changes allowed under 50.54 (p).
Attachment A explains the changes.
Attachment B contains Revision 09 of the Security Plan.
This cover letter when separated from the enclosure is not i
Safeguards Information.
Should you require additional information, please do not hesitate to contact us.
Sincerely,
,m r
Don A. Reid Decommissioning Manager /
Manger of Operations /
Site Manager SAFEGUARDS INF0RMATION 1his Tommithi Document Does Itat conmie Safeguents iniwmation and Whos Detached from The Enclosure Need Not Be Protected