ML20246L636
| ML20246L636 | |
| Person / Time | |
|---|---|
| Site: | Yankee Rowe |
| Issue date: | 08/31/1989 |
| From: | Jerrica Johnson NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | St Laurent N YANKEE ATOMIC ELECTRIC CO. |
| Shared Package | |
| ML20246L640 | List: |
| References | |
| NUDOCS 8909070014 | |
| Download: ML20246L636 (2) | |
See also: IR 05000029/1989011
Text
. . .
.
.f"
. . _
- (,
y
J..a '**
L v. :p
w
.
-
[,
,
pg 311999.
"
.
,
' Docket No. 50-29
Y
LYankee' Atomic Electric' Company:
/ ATTN: Mr. Norman St. Laurent.
Manager of Operations-
580' Main Street'
y
- Bolton, Massachusetts'- 01740-1398
J
l
Gentlemen:
Subject:
Inspection R v ,rc No. 50-29/89-11
.This refers to the routine resident safety inspection conducted by Messrs.
'J. Macdonald. and M.' Markley of this office on June 26 '- July 31,1989 at the -
Yankee Nuclear Power Station, Rowe, Massachusetts. The inspection consisted of
- observation of- activities, interviews with personnel and. document reviews-
The
.
results of the inspection are described in the NRC Region I' Inspection Report
- enclosed with this letter and were discussed with Mr. R. Mellor of your staff'
at the conclusion.of the inspection.
E
L
This.repcrt describes an: instance of untimely implementation of your commit-
t ments regarding main steam line radiation monitor (MSLRM) technical'specifica-
' tions-(TS) as well..as spare part availability problems which'resulted in three.
-
of four MSLRMs being inoperable during plant operation. The TMI Action Plan
commitments ' associated with these monitors should have receiveo more attention,
L
resulting in; application of a higher priority to' equipment reliability. . Al-
though it appears that this was an isolated instance of-poor commitment track-
ing, the effectiveness of your program will continue to be assessed.
'No. written response to this report is required; however, our resident inspector
staff awaits additional information regarding four unresolved items.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of
this letter and the enclosures will be placed in the NRC Public Document Room.
Your cooperation with us is appreciated.
Sincerely,
i
!
Original Signed By:
Jon R. Johnson
'Jon R. Johnson, Chief
Projects Branch No. 3
Division of Reactor Projects
Enclosure: NRC Region I Inspection Report No. 50-29/89-11
i
0FFICIAL RECORD COPY
IR YANKEE 89-11 - 0001.0.0
8909070014 890s32
11/29/80
}1
1
ADOCK 05000029
O
.
((
'
__
_
_ _ _ _ _ _ _ _ _ _ _
_____._______________________________1_____o
- -
,s; ,
~
-
,
'aspg
x
(
?pp .p ... . a
. . . .
.*
AUG 311989
1. Yankee lAtomicElectricCompany'
12
,
Jcc w/ enc 1:
CA.:Kadak, President & Chief Operating Officer
.
T.' Henderson,. Acting Plant-Superintendent
[.
G.; Papanic, Jr.,7 Senior Project Engineer.'- Licensing
i .-
P. Agnes,' Assistant. Secretary'of Public Safety, Commonwealth of Massachusetts
- ,
.C'.Sterzinger Commissioner, Vermont Department of Public Service-
.
>
L
Public Document Room (PDR)<
!-
Local. Public Document Room (LPDR)'
. Nuclear Safety'Information Center (NSIC)
NRC Resident Inspector.-
.
' Commonwealth of Massachusetts (2)~
~
'bec w/ enc 1:
'
Region:I Docket Room (with concurrences')'
'M. Perkins, DRMA.(w/o enc 1)
,
Ri Blough, DRP
J. Macdonald, RI-Vermont = Yankee
D. Limroth, DRP
~J. Johnson,-DRP
R Eichenholz, SRI-Yankee (w/ concurrences)
G. - Grant, SRI,' Vermont Yankee
, ,'
N. Dudley, SRI,-Seabrook,
M. Fairtile, NRR.
R. Bores,- DRSS
.C. Woodard,-DRS'(Section 10.1)
'J;'Strosnider,(DRS:(Section10.1)
RI:DRP-
I:DRP-
RI
-
Macdonald/meo
B uh
Johr son
8/28/89-
$]
W W
OFF CIAL RECORD COPY
IR YANKEE 89-11 - 0002.0.0
11/29/80
!
___-_-___