Forwards Rev 28 to Yankee Atomic Electric Co Decommissioning QA Program. Program Name Changed Due to Status of Plant.Plant in Final Stages of Decommissioning
ML20154P943
Person / Time
Site: Yankee Rowe
Issue date: 10/16/1998
From: Peterson W
YANKEE ATOMIC ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20154P946 List:
References
BYR-98-061, BYR-98-61, NUDOCS 9810230106
Download: ML20154P943 (26)


Text

.,n.-.: + .a a s s n. A i,

YANKEE ATOMICELECTRIC COMPANY 'C"*lo"?gjl?['

580 Main Street, Bolton, Massachusetts 01740-1398

~ -.

October 16,1998 ,

BYR-98-061 I United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Reference:

(a) License No. DPR-3 (Docket 50-29) j (b) YAEC Letter to NRC, dated 6/23/97, Submittal of YOQAP, Revision 28, BYR 97-027. '

(c) YAEC Letter to NRC, dated 4/14/98, Request for Information Regarding the Quality Assurance Program at the YNPS and Withdrawal of YOQAP, Rev. 28, BYR 98-025.

(d) YAEC Letter to NRC, dated 12/02/98, Sale of Yankee Nuclear Services Division, BYR 97-060. j

Subject:

Submittal of the Yankee Atomic Electric Company Decommissioning Quality Assurance Program (YDQAP).

Dear Sir:

Enclosed for your information is Revision 28 of the Yankee Operational Quality Assurance Program (YOQAP) for the Yankee Atomic Electric Company (YAEC).

Please note that the program name has been changed to the Yankee Decommissioning

[

/

Quality Assurance Program (YDQAP) due to the r>tatus of the plant, which is in the final stages of decommissioning. l l

Previously, a revision to the YOQAP had been submitted to you in Reference (b), and I was withdrawn in Reference (c). The YOQAP was considered a Topical Report because h)d/) '

it was applicable to both the Yankee Atomic Electric Company and the Vermont Yankee Nuclear Power Station. This submittal of the YDQAP applies only to YAEC and will no longer be maintained as a Topict' Report.

The major change in this revision was the removal of all references to the Vermont )'

Yankee Nuclear Power Corporation (VYNPC) and the Yankee Nuclear Services Division (YNSD). VYNPC has its own Program (called the VOQAM) and the YNSD was sold to l Duke Engineering & Services (DE&S) (see Reference (d)). This revision also reflects )

organizational changes within YAEC. The clarifications and organizations.1 changes do not constitute a reduction in commitments and continue to satisfy the criteria of 10CFR, Part 50, Appendix B. (See Attachment A for a description of all changes.) The enclosed lined-out, redline version of the document, which shows all deletions and additions, has been provided to facilitate your review.  :

1 1

9810230106 981016 j PDR ADOCK 05000029- -

W PDR i m.

. .- ..- . ~ . - . . . - . . . .- . - . _ . - - . . . .-. ._ - . .

i Changes to the Program were evaluated to detennine if any requirements in the previously NRC-approved QA Program had been deleted or made less effective, thereby constituting a reduction of commitments. The revised Program was also evaluated i against the criteria contained within 10CFR50, Appendix B. Based on this evaluation,

{

- the clarifications, deletions, and organizational changes do not constitute a reduction in j commitments and the program continues to satisfy the criteria of 10CFR50, Appendix B. 1

- If you have any questions in regard to this revision, please contact Mr. Walter K.

Peterson of this office at 978-568-2877.

Sincerely,

)

i YANKEE ATOMIC ELECTRIC COMPANY Naha Kt h Walter K. Peterson Manager, Decommissioning QA  !

Enclosure

.1 cc: NRC Region 1 NRC Chief of Performance Program Section NRC Project Manager, NRR D. K. Davis W. H. Rasin C. R. Clark J. M. Oddo l

i I

L i

ATTACHMENT A YDOAP Sum _ mary of Channes - Revision 28 Ite m N o. YDQAP Change Description Reason for Change Section 1 -

Changed the title from " Yankee To reflect the current Operational Quality Assurance status of the plant.

Program" to " Yankee Decommissioning Quality Assurance Program" and the acronym from "YOQAP-1-A" to "YDQAP."

2 -

Deleted all references to the Vermont VY has its own QA Yankee (VY) Nuclear Power Station. manual.

3 -

Deleted all references to the Yankee NSD was sold to Nuclear Services Division (NSD). Duke Engineering &

Services (DE&S).

4 -

Editorial changes were made Editorial throughout the document to revise the grammar from plural to singular where necessary.

5 -

Changed " Operational QA Program" or To reflect the current "QA Program" to " Decommissioning status of the plant.

QA Program" throughout the document.

6 -

Added "and Chief Executive Officer" Update to the YAEC President's title throughout the document.

7 -

Changed " Executive Director of To reflect Quality Assurance" to " Director of organizational Quality Assurance"throughout the change.

document.

8 -

Page I To reflect Changed the manual title and names of organizational signatories. changes.

9 Policy Page 1 of 2 To reflect the current Statement Replaced references to " operation" and status of the plant.

" reliable generation of power" with

" decommissioning and fuel storage."

l l

l Ite m N o. I YDQAP Change Description Reason for Change Section 10 Policy Page 1 of 2 Update Statement Replaced " Quality Verification Program" with " Quality Oversight Program."

11 Policy Page 1 of 2 To reflect Statement Deleted reference to a Vice President. organizational I changes.

12 Policy Page 1 of 2 To. reflect Statement Added statement that the President has organizational delegated certain responsibilities to th changes.

Director of Quality Assurance.

13 Policy Page 2 of 2 To reflect Statement Replaced " Plant organizational Superintendent / Manager" with changes.

" Decommissioning Manager."

14 Policy Page 2 of 2 To reflect Statement Replaced " Cognizant Corporate organizational Officer" with " President and Chief changes.

Executive Officer."

15 I Page 1 of 48 To reflect the current Added " decommissioning, spent fuel status of the plant.

storage" to list of responsibilities.

16 I Page 1 of 48 Update Replaced " Plant" with " Yankee Nuclear Power Station."

' '/ I Page1of48 To reflect Added a paragraph stating the organizational responsibilities of DE&S. changes.

18 I Page 2 of 48 VY has its own QA Deleted reference to Figure 2 in manual.

Paragraph C.

19 I Page 2 of 48 To reflect DE&S Added " contracted services" in relationship.

Paragraph C.

4

. Ite m N o. YDQAP Change Description Reason for Change Section i

20 I Page 2 of 48 To reflect i

Under " Quality Assurance Program organizational {

Responsibilities," changed " Yankee - changes. I Nuclear Services Division" to " Yankee'-

- Corporate." l 21 I' Page 3 of 48 To reflect DE&S l Added " contracted services" to relationship. l paragraph D.I.a.5.

22 I Page 3 of 48 To reflect Deleted paragraph referring to the organizational appointment of NSAR Committee changes. ,

members. .d 23 - I Page 3 of 48 Update Added that the President and Chief Executive Officer shall" review and L approve all changes to the j-Decommissioning Quality Assurance Program."

24 I Page 3 of 48 To reflect Deleted the "Vice Presidents" section. organizational changes.

25 I Page 3 of 48 To reflect Changed " Executive Director of organizational j Quality Assurance" to " Director of changes.

l Quality Assurance (DE&S)."

26 I Page 4 of 48 To reflect

( Under the responsibilities of the organizational

! Director of Quality Assurance, changed changes.

" approves" to " reviews" all changes to the Decommissioning QA Program.

27 I Page 4 of 48 Update Added "any contracted organization" in Paragraph D.l.b.4.

28 I Page 5 of 48 To reflect plant Replaced " operation" with " activities" status.

in Paragraph D.I.b.10.

L l

i Item No. YDQAP Chang'e Description Reason for Change l Section 29 I' Page 5 of 48 ' To reflect 1 Deleted " Training Coordinator" organizational section. changes.

30 I Pages 6 and 7 of 48 To reflect Deleted " Decommissioning Manager organizational and Manager of Operations" section. changes.

31 I Pages 7 and 8 of 48 To reflect Deleted " Project Managers" section. organizational changes.

j. 32- I Page 8 of 48 To reflect l: Replaced " Management of Quality organizational L Assurance" with " Manager, changes.

Decommissioning QA."

,- , 33 I Page 8 of 48 Update ll Deleted description of Quality l' Assurance Departments.

34- I. Page 9 of 48 ._

To reflect P Revised paragraph to indicate that the . organizational Manager, Decommissioning QA, changes.

reports to the Director of Quality

' Assurance.

l 35 I Page 9 of 48 Update Deleted reference to ANSI N18.7 -

l 1976 in Paragraph D.l.c.2.

b l: .36 I Page 9 of 48 Update L Deleted " Independent review shall be L performed by an uninvolved, but

'"e technically knowledgeable person in the engineering discipline"from L Paragraph D.l.c.3.

l:

37 I Page 9 of 48 To reflect plant Deleted "for operating plants" and status.

" applicable criteria of 10CFR50, .

' Appendix B and ANSI N18.7 - 1976" from Paragraph D.l.c.4.

E e

I

- -,,,1c -

. . . _ . . . ._ _ _ . . . . ,._.__.- _ _ _ ._. .~_... _ ... _ __ _ _._ .

1 L Ite m N o. YDQAP. Change Description Reason for Change 1 Section i 38 I Page 10 of 48 Update l Replaced "Provides" with "Has authority" for the stoppage of i unsatisfactory work,in Paragraph D. I .c.8.

)

39 ~I Page 10 of 48 .

To reflect plant i l Deleted " site operational activities" status.

l from Paragraph D.I.c.9.

!' 40 I Page 10 of 48 To reflect Deleted " Director of Engineering organizational L Services" section. changes. j i

41 I Pages 10 and 11 of 48 To reflect Deleted " Director of Environmental organizational Engineering" section. i :hanges. l 42 I Pages 11 and 12 of 48 To reflect Deleted " Director of Fuel organizational Management" section. changes.

l 43 I Pages 12 and 13 of 48 To reflect Deleted " Director of Environmental . organizational Laboratory" section. changes.

l. 44- I Page 13 of 48 To reflect Deleted " Director of Nuclear organizational Engineering" section. changes.

45 I Page 14 of 48 To reflect Deleted '.' Plant Support Department . organizational L Manager" section. changes.

i i

L 46 -I Page 14 of 48 To reflect Changed " Engineering and Licensing organizational Manager" to " Engineering Manager." changes.

-47 I Page 15 of 48 To reflect Deleted "and Manager of Operations." organizational changes.

e I-l L

1-Item No. YDQAP Change Description Reason for Change Section 48 I Page 15 of 48 To reflect Deleted responsibility to assure organizational

" coordination and implementation of changes.

the Emergency plan" from the Engineering Manager's responsibilities.

49 I Page 15 of 48 To reflect Added " Licensing Manager" section. organizational

changes.

50 I Pages 15 and 16 of 48 To reflect Deleted " Cost Control and Planning organizational Manager" section. changes.

51 I Page 16 of 48 To reflect Deleted " Automation Technology organizational Department (ATD) Manager" section. changes.

52 I Page 16 of 48 Update Changed paragraph title from " Plant -

Yankee" to " Yankee - Site" in Paragraph D.2 53 1 Page 16 of 48 To reflect Replaced " Site Manager" with organizational

" Decommissioning Manager." changes.

54 I Page 16 of 48 To reflect Added that Decommissioning Manager organizational reports directly to the President and changes.

Chief Executive Officer.

l 55 I Page 17 of 48 Clarification Added that the Decommissioning Manager " acts as Manager of Operations as defined in the Defueled Technical Specifications and Site Manager as defined in the FSAR." ,

56 I Page 17 of 48 Update Deleted the paragraph referring to the Chairman of the Plant Operation Review Committee.

I

Ite m N o. YDQAP Change Description Reason for Change Section 57 I Page 17 of 48 To reflect plant Replaced " operation of" with status.  ;

" decommissioning, and spent fuel storage at"in Paragraph D.2.a.3.

58 I Page 17 of 48 To reflect Deleted responsibility for " Operational organizational Quality Assursance Program, Security changes.

Program and Fire Protection Program."

1 59 I Page 17 of 48 To reflect Deleted responsibility for " Site organizational maintenance and repair." changes.

60 I Page 17 of 48 To reflect Deleted responsibility for the " control organizational and surveillance of all special nuclear changes.

material at the site." l l

61 I Page 17 of 48 To reflect l Deleted responsibility for providing organizational l information to and reporting to the changes.

" Yankee Nuclear Services Division and the Nuclear Safety Audit and Review Committee."

62 I Page 17 of 48 Update Changed the responsibility from

" coordinates review" to " review" of industry decommissioning problems, in Paragraph D.2.a.4.

63 I Page 17 of 48 Clarification Specified that the " Assistant Site Manager"is the alternate to the Decommissioning Manager in Paragraph D.2.a.5.

64 I Page 18 of 48 .

To reflect Replaced " Site Manager" with organizational

" Decommissioning Manager" in changes.

Paragraph D.2.a.5.

l l- l l

l Ite m N o. YDQAP Change Description Reason for Change Section

! 65- I. Page 18 of 48 To reflect Added Decommissioning Manager organizational

responsibility to evaluate the site's changes.

position on in-plant audit discrepancies and to prepare " Implementation Directives,"in Paragraphs D.2.a.7. .

66- I Page 18 of 48 To reflect Added Decommissioning Manager organizational responsibility to coordinate contracted changes.

engineering, licensing, cost control and planning, and site decommissioning actis -s,in Paragraph D.2.a.8.

67 I Page 18 of 48 To reflect Added Decommissioning Manager organizational responsibility to implement the changes.

Decommissioning QA Program,in Paragraph D.2.a.9.

68 I Page 18 of 48 To reflect Added Decommissioning Manager organizational responsibility to ensure that Program changes.

procedures are implemented,in Paragraph D.2.a.10.

69 I Page 18 of 48 To reflect Added Decommissioning Manager organizational responsibility to provide for changes.

independent review and acceptance for plant repairs and safety-related '

engineering design changes,in Paragraph D.2.a.11.

70 I Page 18 of 48 To reflect Added Decommissioning Manager organizational responsibility to provide for review of changes.

material service purchase requests, drawings, specifications, and appropriate procedures,in Paragraph l

D.2.a.12. i l'

h.

L ,

Jte m N o. YDQAP Change Dascription Reason for Change Section

'71 I- Page 18 of 48 To reflect Added Decommissioning Manager organizational responsibility to coordinate the changes. ,

implementation and maintenance of radiological environmental surveillance

programs concerning radioactive

effluents, in Paragraph D.2.a.13.  !

72 I Page 19 of 48' To reflect Added Decommissioning Manager organizational j responsibility to support the changes.

L implementation and maintenance of the Emergency Plan pursuant to state and federal regulatory requirements, in Paragraph D.2.a.14.

73 I Page 19 of 48 To reflect Added Decommissioning Manager organizational

responsibility to provide for the changes.

radiological and environmental engineering requirements necessary to support changes related to the plant decommissioning,in Paragraph D.2.a.15, 74 I Page 19 of 48 To reflect Added Decommissioning Manager organizational responsibility to provide support of changes.

spent fuel storage activities, in Paragraph D.2.a.16.

75 I Page 19 of 48 To reflect Replaced " Operations Manager" with organizational

" Plant Superintendent" in Paragraph changes.

D.2.b.

76 I Page 19 of 48 To reflect Revised to state that the Plant organizational Superintendent reports directly to the changes.

Decommissioning Manager.

! 77 I Page 19 of 48 Update Added " Site Manager and" to Paragraph D.2.b.6.

1' s

Ite m N o. YDQAP Change Description Reason for Change Section -

h 78 I Page 20 of 48 To reflect 1-Added Plant Superintendent organizational ,

responsibility for " security, changes, maintenance, operations, technical services, including the Security and 2

Fire Protection Programs"in Paragraph D.2.b.7. -;

79 I Page 20 of 48 To reflect Added Plant Superintendent . organizational responsibility to act as " Chairman of changes.

the Plant Operations Review i Committee"in Paragraph D.2.b.9.

80- I Page 20 of 48 To reflect plant i Deleted responsibility to coordinate status. I testing of plant hydro requirements.

81 I Page 20 of 48 - Clarification Replaced " Accounts for" with I

" Responsible for the control and surveillance of"in Paragraph D.2.b.11 82 I Page 20 of 48 To reflect Added Plant Superintendent organizational responsibility for " site maintenance changes.

and repair" in Paragraph D.2.b.12.

83 I Page 20 of 48 To reflect e Added Plant Superintendent organizational 1

responsibility to direct "the activities of changes.

Operations, Maintenance, and Security."

84 I Page 20 of 48 To reflect Replaced " Manager" with " Supervisor" organizational and added that Shift Supervisors report changes.

to the Plant Superintendent.

85 I Page 20 of 48 To reflect plant Added Shift Sapervisor(s) status. l responsibility for decommissioning activities.

4 i

i

  • w -, . - , - - ,m..,.. _- _

.r..

Ite m N o; YDQAP Change Description Reason for Change

! Section

-86 I Page 21 of 48 To reflect plant Deleted Shift Supervisor (s) status.

responsibility for" preparing L4 documents outlining system functions and operating modes."

87 I Page 21 of 48 To reflect l Changed " Maintenance and organizational l Construction Manager" to changes.

l

" Construction Manager" in Paragraph l D.2.d.'

88 I Page 21 of 48 To reflect Revised to state that the Construction organizational Manager reports to the changes.

Decommissioning Manager.

89 I- Page 21 of 48 To reflect l Deleted the Construction Manager's organizational l responsibility to direct the activities of changes.

l Mechanical and Electrical Maintenance,I&C, and Maintenance Engineering.

90 I Page 22 of 48 To reflect Deleted " maintenance, repairs, and" organizational and "of maintenance activities to" from changes.

Paragraph D.2.d.3.  :

L 91 I Page 22 of 48 To reflect  !

Deleted " Manager of Operations rid" organizational from Paragraph D.2.d.8. changes. ,

92 I Page 22 of 48 To reflect Deleted " Site Manager" from organizational Paragraph D.2.e.l. changes.

o

'= i 93 I Page 23 of 48 To reflect Deleted Training Coordinator's organizational responsibility to maintain " lines of changes.

communication with the Site Manager

! on Plant Training Programs.

h I

l h

l

Item .No. YDQAP Change Description Reason for Change Section 94 'I Page 23 of 48 To reflect i Added Training Coordinator organizational ,

l- responsibility to ensure all personnel changes.

l are provided with technical and  ;

professional skills required fa l decommissioning activities, in l Paragraph D.2.e.4. 1 95 I Page 23 of 48 To reflect Added Training Coordinator ' organizational responsibility to provide training needs changes. I assessments,in Paragraph D.2.e.5.

! 96 I' Page 23 of 48 To reflect Added Training Coordinator organizational L responsibility to conduct training changes.

[ evaluations, in Paragraph D.2.e.6.

97 I Page 23 of 48 To reflect Added Training Coordinator organizationa!

responsibility to assure training, changes.

qualification, and requalification of personnel in NDE testing, in Paragraph D.2.e.7,  !

98 I Page 23 of 48 .

To reflect l Added Training Coordinator organizational

! responsibility to administer the changes.

NDFJANSI N45.2.6 Training and i Certification Programs, in Paragraph i D.2.e.8.

99 'I Page 23 of 48 To reflect Revised to state that the Site Services organizational H Supervisor reports directly to the changes.

Decommissioning Manager.

100 I Page 24 of 48 To reflect Replaced " Plant Radiation Protection organizational and Chemistry Manager" with changes.

" Radiation Protection and Chemistry Manager."

4

[.

i

,. _ .c_ _ ___ , . - -_

l-l l Ite m N o. YDQAP- Change Description Reason for Change Section 101- I. Page 24 of 48 To reflect Revised to state that the Radiation organizational )

Protection and Chemistry Manager changes.

reports directly to the

! Decommissioning Manager. j

\

102 I Page 25 of 48 Clarification j

~Added "where required" to Paragraph D.2.g.2.

.103 I Page 25 of 48 To reflect Added that the Radiation Protection organizational and Chemistry Manager"has direct changes.

l access to the Plant superintendent for matters relating to radiological health l and safety of employees and the 1-public."

104 I Page 26 of 48 To reflect Added Radiation Protection and organizational

, Chemistry Manager responsibility to changes.

! assure coordination and implementation of the Emergency Plan, in Paragraph D.2.g.11.

105 I Page 26 of 48 To reflect Added Radiation Protection and organizational Chemistry Manager responsibility to changes.

provide for radiochemical processing of environmental, effluent, and waste samples, in Paragraph D.2.g.12. .

)

106 I Page 26 of 48 To reflect Added Radiation Protection and organizational L Chemistry Manager responsibility to changes.

provide for the processing and internal l

dosimetric evaluation of bioassay samples, in Paragraph D.2.g.13.

l-l .

Ite m N o. YDQAP Change Description Reason for Change Section .

107 I Page 26 of 48 To reflect I Added . Radiation Protection and organizational Chemistry Manager responsibility to changes.

provide for the routine in si tu measurements in support of environmental Technical Specifications as well as ad hoc emergency response in si tu measurements or emergency  ;

response laboratory sample measurements, in Paragraph D.2.g.14.

108 I Page 26 of 48 To reflect  !

Added Radiation Protection and organizational Chemistry Manager responsibility to changes.

provide and coordinate technical quality assurance programs in the areas ,

of plant chemistry and whole body '

counting,in Paragraph D.2.g.15.

109 I Page 26 of 48 To reflect Added Radiation Protection and organizational Chemistry Manager responsibility to changes.

provide for the processing of  !

personnel, extremity, and environmental dosimetry needed to support NRC and plant radiological assessment requirements,in Paragraph  ;

D.2.g.16.

I 110 I Page 26 of 48 To reflect Added Radiation Protection and. organizational Chemistry Manager responsibility to' changes. i direct the final status survey program implementation, in Paragraph D.2.g.17. -

.Ii1 I Page 26 of 48 Update Replaced " Health and Safety

- Supervisor" with " Health and Safety Manager."

I12 I Page 26 of 48 To reflect Revised to state that the Health and organizational Safety Manager reports directly f o the changes.

Decommissioning Manager.

Ite m N o. -YDQAP Change Description Reason for Change

.Section 113 I Page 27 of 48 Update Deleted Health and Safety Manager responsibility to direct the maintenance of personnel exposure monitoring record system.

I14 - I Page 27 through 44 of 48 Vermont Yankee has Deleted the " Vermont Yankee Nuclear developed its own Power Corporation" section, QA Manual.

'i15 I- Page 44 of 48 Update Deleted unnecessary reference to "Yankec"in Paragraph E.

I16 I Page 44 of 48 To reflect plant Replaced " operated safely" with status. ,

" decommissioned in a safe manner" and added "and safe fuel storage" in Paragraph E.

117 I Page 45 of 48 To reflect plant l Replaced " operations" with status.

" decommissioning and spent fuel storage"in Paragraph E.

I18 I Page 45 of 48 To reflect plant Changed the PORC membership to status.

match the Defueled Technical Specifications.

'119 I Page 45 of 48 VY specific.

Deleted reference to VY NSARC.

120 I Page 45 of 48 Update Added description of NSARC membership.

I Ite m N o. YDQAP Change Description Reason for Change Section 121 I Page 45 of 48 Update Under " Plant Operations Review Committee"( Paragraph E.1.a), deleted unnecessary reference to " Yankee Plant," and replaced "6.5 ' Review and I Audit' of Appendix A Technical Specifications to the Operating License DPR-3" with "the Yankee Defueled l Technical Specifications to the l Possession Only License DPR-3.

122 I Page 45 of 48 Update i Under " Nuclear Safety Audit and  !

Review Committee"(Paragraph E.2.a), I I

deleted unnecessary reference to

" Yankee Plant," and replaced "6.5

' Review and Audit' of Appendix A Technical Specifications to the Operating License DPR-3" with "6.5.2

'NSARC, of the Yankee Defueled Technical Specifications to the Possession Only License DPR-3."

123 I Page 47 of 48 To reflect Figure 1 Revised the Yankee Organizational organizational i Chart. changes.

124 I Page 48 of 48 VY specific.

Figure 2 Deleted VY Organization Chart.

125 II Page 1 of 7 Update Deleted unnecessary reference to the Yankee plant.

126 II Page 1 of 7 To reflect plant Replaced " operational safety" with status.

" decommissioning and spent fuel storage safety."

127 Il Page 2 of 7 Update Added " Department" after " Quality Assurance."

_ _. - .__ _i .- _ __ _ . _ _ . _ _ . . _ _ . _ _ _ _ _ . . . _ . _ _ _ _ _ _ _

1

! l i

Item No. YDQAP Change Description Reason for Change Section 128 - II Page 6 of 7 To reflect i Deleted " Cognizant Corporate organizational Officer." changes.

129 II Page 6 of 7 To reflect l Replaced "Vice President (s) and organizational .;

l Manager of Operations are" with changes.

I

" Decommissioning Manager is"in Paragraph E.'

! 130 II Page 6 of 7 To reflect plant  !

Replaced " operation" with status.

" decommissioning and spent fuel storage."

131 II Page 6 of 7 VY specific. l Deleted paragraph referring to VY Training Manager.

132 II Page 6 of 7 Update j Deleted unnecessary reference to the i

" Yankee Site."

133 II Page 6 of 7. To reflect Deleted paragraph referring to YNSD organizational i

training. changes.

134 III Page 1 of 4 To reflect Replaced " Engineering Department" organizational with " Engineering Manager" and changes. ,

deleted reference to " Project Departments / Plants." ,

i 135 III Page 2 of 4 To reflect Replaced " Plant organizational  !

Superintendent / Manager" with " Plant changes.

Superintendent."

136 III Page 2 of 4 To reflect j l_ _

Replaced " Plant Site Manager" with organizational

" Plant Superintendent." changes.

.-%=a 9 , . , - , m- %i..___. - n_ -.i.3-- , -,

1 i

Ite m N o. YDQAP Change Description Reason for Change i Section 137 III Page 2 of 4 To reflect Replaced "Vice President (s) and organizational  ;

Manager of Operations" with changes.

" Decommissioning Manager."

138 ..III Page.3 of 4 To reflect Replaced " Nuclear Services Division organizational l Plant Support Department" with changes.

I " Engineering Manager."

139' IV Page 1 of 3 Update Deleted "their corporate staffs" from l Paragraph B.2, 4

140 IV Page 1 of 3 VY specific  !

L Deleted " Review of plant procurement l requisitions."

'141 IV Page 2 of 3 To reflect Replaced " Nuclear Services Division organizational l Engineering and/or Project changes.

l Departments" with " Engineering Manager."

142 IV Page 2 of 3 Update Deleted unnecessary references to

" Yankee plant only."

l 143 IV Page 2 of 3 To reflect

! Replaced " Nuclear Services Division organizational l e Plant Support Department" with changes.

" Plant / Engineering Manager." l

[ 144- IV Page 2 of 3 To reflect L Replaced "For YNSD, the Vice organizational i l- President (s) and Manager of changes.

! Operations" with " The Decommissioning Manager."

145 V Page 1 of 3 Update Added "/ Supervisor" after " Department Director / Manager."

l i

, .._. ___. _ . . - .._-_..____m..__..__..__-.- - _

i l

l l

Ite m N o. YDQAP Change Description Reason for Change )

Section 146 V Page 1 of 3 Update Added "and contracted service" to l Paragraph B.2.

L 147 V Page 2 of 3 To reflect l l Replaced " Nuclear Services Division organizational l l Engineering and/or Project changes.~

Departments" with " Engineering Manager."

'148 V Page 2lof 3 To reflect - 1 Replaced " Plant organizational l Superintendent / Manager" with " Plant changes. l Superintendent."

l 149 V Page 2 of 3 To reflect j Deleted paragraph referring to NSD organizational l responsibility for instructions and changes.  !

procedures associated with Construction Services activities.

150. VI Page 1 of 4 To reflect plant-Replaced " refueling" with " fuel status.

movements"in Paragraph B.2.a.

1 151 -VI Page 2 of 4 Clarification Added " plant" before " drawings" in Paragraph B.2.c.

.152 VI Page 2 of 4

~

To reflect Replaced " Nuclear Services Division organizational Engineering and/or Project changes.

Departments" with " Engineering Manager." ,

153 VI Page 2 of 4 To reflect Replaced "Vice President (s) and organizational Manager of Operations" with changes.

" Decommissioning Manager."

154 VI Page 2 of 4 To reflect plant Replaced " Nuclear Services Division status.

Operational" with " Decommissioning."

mwy- eag g ,yg+ w. + a + - = + ' '

- . . . . . ~ . . - . . - . . - . ~ . - - .- - . - - - . - - . . . - - . - . . - - . _ . . .

Ite m N o. YDQAP Change Description Reason for Change

'Section ,

t 155 VI Page 3 of 4 Update l Deleted " Plant"in Paragraph C.I.e.l.

t 156- VI Page 3 of 4 To reflect plant  :

'Added "and decommissiohing" to . status. -

Paragraph C.I.e.2. -

157 VI Page'4 of 4 To reflect plant Replaced " operating" with .

status.

" decommissioning" in Paragraph C.I.e.4.

l

- VI

~

158 Page 4 of 4- Specific to VY.

Deleted " Event reports." l 159 - VII Page 1 of 4 To reflect i Deleted " Engineering and/or Project organizational  ;

Departments." ' changes.

jl 160- VII Page 2 of 4 To reflect -

Added " Site Services Department" and organizational deleted." Services / Administrative changes. I Department at the Yankee plant and the Material Manager at Vermont Yankee" in Paragraph B.c. )

161 VIII Page 1 of 2 To reflect Replaced " Nuclear Services Division organizational  ;

Engineering and/or Project changes.

Departments and/or the Vermont Yankee staff" with " Engineering Manager."

162 .VIII Page 2 of 2 _

To reflect

!. Replaced "For YNSD, the Vice organizational President (s) and Manager of changes.

Operations" with "The Decommissioning Manager."

163- IX - Page 1 of 3 To reflect Replaced " Nuclear Services Division organizational Engineering and/or Project changes.

Departments" with " Engineering l Manager."

i H

g

Ite m N o. YDQAP Change Description Reason for Change Section 164 IX Page 2 of 3 To reflect Deleted "The Plant Support organizational Department shall be responsible for" changes.

from Paragraph B.2.4.c.

165 IX Page 2 of 3 To reflect Replaced "For YNSD, the Vice organizational President (s) and Manager of changes.

Operations" with "The Decommissioning Manager."

166 X Page 1 of 3 VY specific.

Deleted responsibility for " surveillance of documentation pertinent to the Inservice Inspection and Test Program."

167 X Page 1 of 3 Update Deleted unnecessary references to

" Yankee Plant only."

168 XI Page 1 of 3 To reflect Replaced " Nuclear Services Division organizational Engineering / Project Departments" with changes.

l

" Engineering Manager."

169 XII Page 1 of 2 To reflect Replaced "Each Plant Department" organizational with "The Plant." changes.

170 XV Page 1 of 3 Update Deleted unnecessary references to

" Yankee Plant only."

171 XV Page 1 of 3 VY specific.

Deleted requirement to review Event Reports.

172 XV Page 2 of 3 To reflect Replaced " Nuclear Services Division organizational Engineering and/or Project changes.

Departments" with " Engineering Manager."

l

1 i 1

l l

l I

Ite m N o. YDQAP Change Description Reason for Change Section 173 XV Page 2 of 3 To reflect Replaced " Nuclear Services Division organizational

! Engineering and/or Project changes.

Departments" with " Engineering Manager."

174 XVI Page 1 of 3 To reflect Replaced "Vice President (s) and their organizational staff" with " Decommissioning changes.

Manager and staff."

175 XVI Page 1 of 3 To reflect Replaced " Nuclear Services Division organizational Projects Departments and the Plant" changes.

with " Plant and the Engineering Department."

176 XVI Page 1 of 3 Update Deleted unnecessary references to

" Yankee Plant only."

177 XVI Page 2 of 3 VY specific.

Deleted requirement to coordinate comments between NSD Projects Departments and the Plant.

178 XVI Page 2 of 3 To reflect Replaced " Nuclear Services Division organizational Engineering and/or Project changes.

Departments" with " Engineering Manager."

179 XVI Page 3 of 3 Editorial Replaced " correction" with

" corrective."

180 XVII Page 1 of 4 To reflect plant Added "and other decommissioning status.

and spent fuel storage records." ,

l 181 XVII Page 2 of 4 To reflect l .Added QA Department responsibility organizational to control and distribute the changes.

Decommissioning QA Program and revisions thereto.

l Ite m N o. YDQAP Change Description Reason for Change Section 1

l 182 XVII Page 2 of 4 To reflect I Replaced " Nuclear Services Division organizational Engineering and/or Project changes.

Departments" with " Decommissioning Manager."

183 XVII Page 2 of 4 To reflect Deleted QA Department responsibility organizational for control and distribution of the changes.

Operational Quality Assurance Program and revisions thereto.

184 XVII Page 3 of 4 To reflect plant Added " Decommissioning records." status.

185 XVIII Page 2 of 4 Update Deleted unnecessary references to

" Yankee Plant only."

186 XVIII Page 2 of 4 To reflect Replaced "YNSD Departments" with organizational l

" functional areas" and added changes and plant l " Decommissioning" to Paragraph status.

l B.l.h.

187 XVIII Page 2 of 4 To reflect l Deleted responsibility for Vice organizational l President (s) and Manager of changes.

Operations to evaluate disposition of In-Plant Audits.

188 XVIII Page 2 of 4 To reflect Replaced "Vice President and Manager organizational of Operations" with changes.

" Decommissioning Manager" in Paragraph B.2.b.

I89 XVIII Page 2 of 4 VY specific.

Deleted requirements specific to VY.

190 XVIII Page 3 of 4 To reflect Replaced " cognizant corporate officer" organizational with " President and Chief Executive changes.

Officer."

l

I-Ite m N o. YDQAP - Change Description Reason for Change Section 191 XVIII Page 3 of 4 To reflect Replaced " Nuclear Services Division organizational ,

Departments" with " Decommissioning changes. .

Manager."

192 XVIII Page 3 of 4 To reflect ,

Added Decommissioning Manager organizational l responsibility to evaluate disposition of changes. l In-Plant Audits and prepare I concurrence directives to the plant."

193 XVIII Page 3 of 4 To reflect Replaced " plant and/or Nuclear organizational Services Division documents" with changes.

"the following actions:" in Paragraph C.1, and deleted "2. The implementing l documents shall provide for the following:."

194 -Appendix A Page1of1 To reflect plant j Added "(or decommissioning)" to status, i Paragraph B.2.

195 Appendix B Page 2 of 25 To reflect plant Deleted exception to R.G.1.33, Rev. 2, status.

" Quality Assurance Program Requirements (Operations)."

L 196 Appendix B Page 13 of 25 To reflect plant Deleted " operating." status.

197 Appendix B Page 17 of 25 Update Replaced " Yankee" with "The Yankee plant."

198 ' Appendix B Page 17 of 25 VY specific.

Deleted statement specific to Vermont Yankee.

l 199 - Appendix B Page 18 of 25 Update Replaced " Yankee" with "The Yankee l

plant."

200 Appendix B Page 18 of 25 Editorial

]- Replaced " System" with " Systematic."

l-l

Ite m N o. .YDQAP- Change Description Reason for Change -

Section '

l

.201 Appendix B Page 18 of 25.- .

VY specific.

Deleted statement specific to Vermont Yankee.

202 Appendix B' Pages 19 and 20'of 25 VY specific.

Deleted exception _to ANSI N18.7 - l 1976, Subsection 4.5.

'- ~

203 Appendix B Page 20 of 25 _

Update '

Replaced " Yankee Atomic Electric Company and the Vermont Yankee Operating Plant take" with "The Yankee Plant takes."

'204' Appendix B . Page 21 of 25 Update Deleted " Emergency Operating  !

Procedures."

205 Appendix B - Page 22 of 25 Update Deleted "The Operating Experience Program involves the review of USNRC,INPO, and vendor supplied l information for applicability and i

determination of further action, this -

review includes an evaluation of l applicable documents such as procedures and the initiation of

i. required changes."

206. Appendix B Page 22 of 25 VY specific.

Deleted "(Event Reports)." .

1 207 Appendix B Page 23 of 25 VY ' specific.  ;

Deleted exception to Subsection 5.3.9.

208'- Appendix B Pages 24 and 25 of 25 VY specific.

Deleted exception to Subsection 4.5.

L 209.-- Appendix C Page1of1 VY specific. '

R Deleted in its entirety.