Text
%@Mlh D
$MM o ky
.D ignat:
rIfinal F '
'
.
ogd'
W
h
bh
biuCLSYL l '
H
,
if
~
Nami.
H
.
-
<
pg g $hsp
~
i
y-
AUG 2 51989;
j
fl
,
- y'
^!
f,
I d. .
'gl
'
,
.r
i
Docket No; 50-29
-
.
y
ib
f @, Yankee Atomic Electric-. Company
d
. . , .
,
7
cATTN: Mr. ; Bruce L. Drawbridge
'Vice. President and Manager.
j
~
,
,
.of Operations.
i
f.
. ..
+
1580 Main Street-
-i
j
h.
Bolton, Massachusetts 01740-1398-
.'1
.
sGentlemen:
l
'
<
'
B
ISubject:1 Inspection No. 50-29/89-13
,
,
This letter refers to the routine safeguards inspection conducted by Messrs.
j
a'
' , iW.' K. Lancaster' and T. W.10exter of this office on July 24-28,:1989, of activi-
l
'
.
,,Ltiescat the Yankee. Nuclear Power Station,.Rowe, Massachusetts authorized by NRCi
.!
, License DPR-3,Jand to the . discussions of, our findings. held by Mr' Lancaster -
1
iwithL Mr. T., Henderson and other members .of your staff -at' the co'nclusion of the
j
.
yxinspection.
d
Areas examined during' this; inspection are described in.the NRC Region I? Inspec-
'
e
'
tion Report which is enclosed with this letter. Within these areas, the
4
inspection consisted ofLselective examinations of' procedures and representative-
- records, interviews with personnel, and observations'.by'the inspectors.
WithinLthe" scope of this inspection, no violations were observed; however,
'
- several concerns were identified and are' discussed in the enclosed inspection
y'4
report.
- -
u-
.-Sections ~ ofithe' enclosed . inspection report contain details of your security.
' l
.
"
. program'that have beenl determined to be exempt from public disclosure in.
accordance with 10 CFR 73.21 (Safeguards Information). Therefore, the sections
i
j :sol identified will not'be placed in the NRC Public Document Room and will
L
-receive limited distribution.
This letter and the remainder of;the inspection
'
report.will be placed in the Public. Document Room, in accordance with 10 CFR'
!
,
'2.790(a)
1
NoL response to this letter is required. Your cooperation with us is appreciated.
-
.i
Sincerely,
,
Crigin555&n'ed B]y
.RichardE. Keinig
{
Ronald R. Bellamy, Chief
j
Facilities Radiological Safety
and Safeguards Branch
'
Division of Radiation Safety
'g
and Safeguards
,
.
I
1
!
p
0FFICIAL RECORD COPY
SG IR YANKEE 89-13 - 0001.0.0
I-
08/22/89
T *.t
-8909060214' 890825-
'
4
?
'
ADOCK 05000029
h
>!
Q
1
M
---
- - - -
-
-
J
- _ _
6
..
..
-
.
.
AUG 2 51989
Yankee Atomic Electric
2
Company
I
}
Enclosure: NRC Region I Inspection Report Number 50-29/89-13 (Contains
Safeguards Information (SGI) in Paragraph Nes. 5, 6 and 8).
cc w/enci (w/o SGI):
Dr. Andrew C. Kadak, President & Chief Cyerating Officer
W. St. Laurent, Plant Superintendent
G. Papanic, Jr., Senior Project Engineer - Licensing
$
P, Agnes, Assistant Secretary of Public Safety, Commonwealth of
C. Sterzinger, Commissioner, Vermont Department of Public Service
-Public Document Room (POR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector (w/SGI)
Commonwealth of Massachusetts (2)
State of Vermont
W-: w/enci (w/o SGI):
Region I Docket Room (with concurrences)
M. Perkins, DRPA (w/o encl)
D. Haverkamp, Section Chief, DRP
L. Doerflein
J. Macdonald, SRI, Yankee (w/ concurrences)
G. Grant, SRI - Vermont Yankee
M. Fat; tile, NRR
J. Wiggins, DRP
N. Ervin, NRR/RSGB (i;/SGI)
R. Dube, NRR/RSGB (w/SGI)
l}
r'
k)
JhCA f~oR
RI: RSS
RI:DRSS
RI:
RI'
Sp
Dextcr/mk
Lancaster
Ke 44lT
Be
wy
1
08/B/89
08/J 3/89
08/15/89
08/a /89
0FFICIAL RECORD COPY
SG IR YANKEE 89-13 - 0002.0.0
08/22/89