ML20203A509

From kanterella
Jump to navigation Jump to search
Change Notice 001 to Rev 2 to Quality Instruction QI-023, Reinsp of HVAC Equipment Installation
ML20203A509
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 03/06/1986
From: Bajada E, Patterson A
EVALUATION RESEARCH CORP.
To:
Shared Package
ML20202J051 List: ... further results
References
QI-023-01, QI-23-1, NUDOCS 8607170263
Download: ML20203A509 (2)


Text

l

-, Pag 2 1 of 2 ,_

%)

EVALUATION RESEARCH CORPORATION CONWOU S COPY (D c0NTROL NO. M COMANCHE PEAK RESPONSE TEAM QUALITY INSPECTION FOR ISSUE SPECIFIC ACTION PLAN VII.c CHANGE NOTICE 001 INSTRUCTION NO.: QI-023 REVISION NO.: 2 ISSUE DATE: 03/06/86 8 REINSPECTION OF HVAC EQUIPMENT INSTALLATION The QI identified above is hereby changed as shown on the attached pages of this notice.

~

Prepared by: 'v Date:

Approved by: O I' W Date:

Issue Coordinator Approved by: [. /I, */h Date: 6 ff(0 On-Site QA Represent ive O

Approved by:  % Date: .3 /,((ib QA/QK Review Team thsider //

8607170263 860711 PDR ADOCK 05000445 A PDR

i Change Notice 001 QI-023 Rev. 2 ITEM CHANGE TO QUALITY INSTRUCTION

1. Page 6, Item 7 b.1 Add: " Verify that the nuts and bolts cannot be turned by hand."
2. Page 7. Item 7.c Add: " Verify that the nuts and bolts cannot be turned by hand."

S I

h 2

_ __