Marked-up TS Pages,Reflecting Proposed Changes in Amends to Licenses NPF-87 & NPF-89
ML20216E629
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 04/09/1998
From:
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
Shared Package
ML20216E622 List:
References
NUDOCS 9804160260
Download: ML20216E629 (2)


Text

ATTACHMENT 3 to TXX 98107 AFFECTED TECHNICAL SPECIFICATION PAGES (TS 4.8.1.1.2f.4) and 4.8.1.1.2f.6))

l 9004160260 980409 PDR ADOCK 05000445 P

PDR r

l

I

,. to TXX 9810) p j

Page 1 of 1 l

ELECTRICAL POWER SYSTEMS o

SURVEILLANCE REQUIREMENTS (Continued) l

4).

Simulating a loss of offsite power by itself, and#:

[

i l

a)

Verifying deenergization of the emergency busses and load shedding from the emergency busses, and l

b)

Verifying the diesel starts on the auto start signal, l

energizes the emergency busses with permanently connected

)

l loads within 10 seconds, energizes the auto connected shut-4 i

down loads through the load sequencer and operates for j

greater than or e ual to 5 minutes while its generator is loaded with the s utdown loads.

After energization, the l

steady state voltage and frequency of the emergency busses f

shall be maintained at 6900 1 690 volts and 60 1 1.2 Hz 1

during this test.

5)

Verifying that on a Safety Injection Actuation test signal, without loss of offsite power, the diesel generator starts on the auto start signal and operates on standby for greater than or equal to 5 minutes.

The generator voltage and frequency shall be 6900 1 690 volts and 60 1 1.2 Hz within 10 seconds after the auto-start signal; the steady state generator voltage and frequency shall be maintained within these limits during this test:

{

6)

Simulating a loss of offsite power in conjunction with a Safety i

Injection Actuation test signal, and#:

1 i

a)

Verifying deenergization of the emergency busses and load shedding from the emergency busses; b)

Verifying the diesel starts on the auto start signal, energizes the emergency busses with permanently connected loads within 10 seconds, energizes the auto connected emergency (accident) loads thrrugh the load sequencer and operates for greater than or equal to 5 minutes while its generator is loaded with the emergency loads. After energization, the steady state voltage and frequency of the emercency busses shall be maintained at 6900 1 690 volts and 60 1.2 Hz during this test: and c)

Verifying that all automatic diesel generator trips, except engine overspeed and generator differential, are automatically bypassed upon loss of voltage on the emergency bus concurrent with a Safety Injection Actuation signal.

7)

Verifying the diesel generator operates for at least 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

During the first 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> of this test, the diesel generator j

gw wwammwm~ v~pgygg;py39mqgggg3qqq3373q l

pccmatonettime5 basis,wtheeverification;ofithe(proper operationkofsthe) Unit 12&loadT sheetsealite:contactsiand;theldieseligeneratorttrip: bypass; contacts may besperformed.

.at"pener Nond?thesverificationTof the: proper (operationiofCthe(Unit:2Llockoutirelays.%

coogtects:mayxbeLdeferred'unt111therstartupsfrosF2RF04jor;earlierioutageltorat E.

. M99E%siMDa:MaMMQWML&1.&&dDEsGC:kuhWM 3/4 8 6 j