ML20058B579

From kanterella
Jump to navigation Jump to search
Rev 14 to Comanche Peak Steam Electric Station Technical Requirements Manual
ML20058B579
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 11/19/1993
From: Woodlan D
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
References
PROC-931119, NUDOCS 9312020129
Download: ML20058B579 (8)


Text

.

e R1UEl FCTRIC o

OFFICE MEhf0RANDUni CPSES-9317530 TUS-93418 File 836 (TRM) l November 19, 1993 TO:

Technical Requirements Manual Copy Holders

SUBJECT:

REVISION 14 TO THE CPSES UNrrS 1 & 2 TECHNICAL REQUIREMENTS MANUAL l

Attached is a copy of Revision 14 to the CPSES Units 1 & 2 Technical Requirements Manual (TRM). Revision 14 is scheduled to be issued on November 19,1993, and to be implemented at l

12:01 AM on November 30,1993.

Nuclear Licensing has reviewed this Revision per STA-Il9.

The Technical Compliance Manager should ensure the timely completion of implementation activities i

within Nuclear Operations.

O Please insert these pages into your controlled copy as per the attached instructions.

If you should have any questions, please call Roy Cisneros at (214) 812-8814.

D. R. Woodlan Docket Licensing Manager RC/grp Attachment i

c-CCS E06 File 836 (TRM)

J. J. Kelley clo M. R. Blevins clo J. W. Donahue clo C. L. Terry clo D. R. Moore clo R. D. Walker clo R. D. Bird, Jr. clo D. J. Reimer clo R. J. Prince clo B. T. Lancaster clo i

Preparer h

Proof reader

.k 9312020129 931119 pI gi l-PDR ADOCK 05000445 7

l

(

l P

PDR i

\\

1 l

4 COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 Q

TECHNICAL REQUIREMENTS MANUAL (TRM)

INSTRUCTION SHEET (Page 1 of 1) i l

The following instructional information and checklist is being furnished to help insert Revision 14 into the Comanche Peak Steam Electric Station TRM. A description of this revision is provided in

)

TXX-93401, dated November 29, 1993.

Discard the old sheets and insert the new sheets, as listed below. Keep all instruction sheets in the front of the Effective Page Listing to serve as a record of changes.

Remove Insert Section 2 2-27 2-27 List of Effective Paces EPL-1 thru EPL-4 EPL-1 thru EPL-4 0

O

TECHNICAL'REOUIREMENT 2.1 (continued)

. TABLE 2.1.1 (continued)

TABLE NOTATIONS

  • Identification code for containment penetration and associated isolation valves in FSAR Tables 6.2.4-1, 6.2.4-2, and 6.2.4-3.
  1. May be opened on an intermittent basis under administrative control.

The table does not list local vent, drain and. test. connections as they 14 are a special class of containment isolation valves and are.: locked closed to meet containment isolation criteria when located within the penetration boundary. These valves are subject to the same leak rate 14 testing as the other containment isolation valves in the associated penetration, including all applicable leak testing exceptions (see.

FSARTable6.2.4-2,includingnotes).

In~ addition, if these valves are capped (or isolated by blind flange) and under administrative controls they are not required to be leak rate tested.

Note 1: All four MSIV bypass valves _are locked closed in Mode 1.

During Mode 2, 3, and 4 one MSIV bypass valve may be opened provided the other three MSIV bypass valves are' locked closed ~

and their associated MSIVs-are closed.

Note 2: These valves require steam to be tested and are thus not required to be tested until the plant is in MODE 3.

O Note 3: 1nese va,ves are inc,uded for teb,e comp,eteness; the requirements of Specification 3.6.3 do not apply.

Instead, the requirements of Specification 3.7.1.1, 3.7.1.5, 3.7.1.6-3 and 3.7.1.7 apply for main steam safety valves, main steam 3

isolation valves, feedwater isolation valves'and steam 3

generator atmospheric relief valves, respectively.

3 Note 4: These valves are leak tested in accordance with Technical Specification Surveillance Requirement 4.6.1.2.

2' Note 5:

10 CFR 50 Appendix J, Type C testing of these valves is 6

satisfied by the testing of the airlock under Technical

_6 i

Specification Surveillance Requirement 4.6.1.3b.

6-i Note 6: These valves are considered an integral part of the airlock 6

associated with their respective airlock door.

Therefore, 6

}

they are subject to the controls of' Specification 3.6.1.3.

6 1

Note 7: These valves are secured in position by hydraulic system 6

locks and/or. interlocks and do not require separate locks.

6 i

i O

COMANCHE PEAK - UNITS 1 AND 2 2-27

. Revision 14 November 30,.1993 L.

COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2

()

TECHNICAL REQUIREMENTS MANUAL (TRM)

EFFECTIVE PAGE LISTING BELOW IS A LEGEND FOR THE EFFECTIVE PAGE LISTING:

Original Submitted July 21, 1989 Revision 1 September 15, 1989 Revision 2 January 15, 1990 Revision 3 July 20, 1990 Revision 4 April 24, 1991 Revision 5 September 6, 1991 Revision 6 November 22, 1991 Revision 7 March 18, 1992 Revision 8 June 30, 1992 Revision 9 December 18, 1992 Revision 10 January 22, 1993 Revision 11 February 3, 1993 Revision 12 July 15, 1993 Revision 13 September 14, 1993 Revision 14 November 30, 1993 O

i O

EPL-1 November 30, 1993 a

w

<-~.

~

,,.a,

, ~ ~

p

l C0MANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 O-TECHNICAL REQUIREMENTS MANUAL (TRM)

EFFECTIVE PAGE LISTING TRM-Tab Original TRM-Title Page June 30, 1992 Table of Contents-Tab Original i

Revision 11 Administrative Controls-Tab Original Administrative Controls-Title Page June 30, 1992 0-1 Revision 12 i

0-2 January 22, 1993 i

0-3 December 18, 1992 0-4 June 30, 1992 0-5 January 22, 1993 0-6 January 22, 1993 0-7 January _22, 1993 0-8 January 22, 1993

[

0-9 January 22, 1993 0-10 January 22, 1993 0-11 January 22, 1993 0-12 June 30,1992 0-13 June 30, 1992 0-14 July 15, 1993 l

0-15 July 15, 1993 l

O o-te aaauary 22. 1993 l

0-17 January 22, 1993 I

0-18 Revision 12 0-19 Revision 8 0-20 July 15, 1993 0-21 July 15, 1993 0-22 Revision 8 0-23 Revision 8 0-24 Revision 8 0-25 July 15, 1993 l

0-26 January 22, 1993 Technical Requirements-Tab Original' Section 1-Tab Original l

1-1 June 30, 1992 1-2 Revision 12 i

1-3 July 15, 1993 i

1-4 July 15, 1993 1-5 June 30, 1992 1-6 Revision 12 1-7 July 15, 1993 1-8 July 15, 1993 1-9 July 15, 1993 i

1-10 July 15, 1993 l

l 1-11 July 15, 1993 l

1-12 July 15, 1993 1-13 July 15, 1993 l

EPL-2 November 30, 1993

.n n

~ -

l COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1.& 2 O-TECHNICAL REQUIREMENTS MANUAL (TRM)

EFFECTIVE PAGE LISTING 1-14 July 15, 1993 1-15 Revision 12 1-16 June 30, 1992 1-17 Revision 12 1-18 July 15, 1993 1-19 July 15, 1993 1-20 July 15, 1993 1-21 July 15, 1993 1-22 Revision 12 Sec. 2-Tab Original 2-1 June 30, 1992 2-2 Revision 12 l

2-3 July 15, 1993-2-4 January 22, 1993 2-5 Revision 8 2-6 Revision 8 2-7 Revision 8 2-8 January 22, 1993 2-9 Revision 8 2-10 January 22, 1993 2-11 Revision 8 0

2-12 aevisioa 9 2-13 Revision 8 2-14 July 15, 1993 2-15 Revision 8 2-16 July 15, 1993 2-17 Revision 8 2-18 Revision 8 2-19 January 22, 1993 2-20 January 22, 1993 2-21 Revision 8 2-22 Revision 8 2-23 Revision 8 2-24 Revision 8 2-25 Revision 12 l

2-26 January 22, 1993 l

2-27

-Revision 14 l

2-28 July 15, 1993 l

Sec. 3-Tab Original 3-1 June 30,_1992 3-2 Revision 12 3-3 Revision 12 3-4 July 15, 1993 3-5 July 15, 1993 l

3-6 July 15, 1993 j

l 3-7 June 30, 1992 3-8 July 15, 1993 EPL-3 November 30,-1993 l

I' l

1 COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 TECHNICAL REQUIREMENTS MANUAL (TRM) l

\\

EFFECTIVE PAGE LISTING l

3-9 June 30, 1992 l

3-10 Revision 11 3-11 Revision 11 Sec. 4-Tab Original l

4-1 June 30, 1992 4-2 Revision 12 4-3 July 15, 1993 4-4 July 15, 1993 4-5 Revision 9 l

4-6 Revision 9 4-7 Revision 8 4-8 Revision 13 l

4-9 Revision 13 4-10 Revision 13 4-11 September 14, 1993 l

4-12 September 14, 1993 4-13 Revision 13 4-14 Revision 13 4-15 Revision 8 t

4-16 Revision 12 4-17 Revision 10 0

4-18 aevision 12 4-19 Revision 12 4-20 Revision 8 4-21 Revision 12 4-22 July 15, 1993 4-23 Revision 12 4-24 Revision 12 4-25 Revision 12 4-26 Revision 12 4-27 Revision 8 4-28 Revision 10 4-29 Revision 12 4-30 Revision 10 4-31

-July 15, 1993 EPL-Tab Original--

EPL-1 Revision 14 EPL-2 Revision 14-EPL-3 Revision 14 EPL-4 Revision 14 1

O EPL-4 November 30, 1993

i 1

d6 i

i

!, O File 625. L t

TO:

Technical Requirements Copy Holders FROM:

Manager of Nuclear Licensing

}

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION i

TRANSMITTAL OF TECHNICAL REQUIREMENTS MANUAL i

REVISION 14 AND RECEIPT ACKNOWLEDGEMENT FORM l

CWY #

Attached is 1 copy of TECHNICAL REQUIREMENTS REVISION u

for your assigned copy.

Please sign and return this transmittal within 30 days to acknowledge receipt of the Revision; also, to verify that your Technical Requirements Manual i

has been checked and includes the enclosed revised pages as well as all previous i

revisions.

i l

If you should have any questions, please contact Loretta Ansley at (214)812-4340.

J P

i Technical Requirements Manuals must be updated and acknowledged within 30 days n

i U

to maintain a controlled status.

1 4

him&nk n85d $LLLll.

Copy Holder's Name Acknowledgment Signature Date

]

If the Copy Holder has changed or the address of the Copy Holder has changed.

please provide the information requested below:

j Name of new Holder:

j New mailing address:

~

j RETURN TO: LGIETTA ANSLEY TU ELECTRIC-24 ST 400 N. OLIVE. LB 81 DALLAS, TEXAS 75201 i

O i

260022 i

-