ML20202J143
| ML20202J143 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 02/11/1986 |
| From: | Bajada E EVALUATION RESEARCH CORP. |
| To: | |
| Shared Package | |
| ML20202J051 | List:
|
| References | |
| CPP-001-01, CPP-1-1, NUDOCS 8607170031 | |
| Download: ML20202J143 (2) | |
Text
s 1
PC83 1 cf 2
(
EVALUATION RESEARCH CORPORATION t,
COMANCHE PEAK RESPONSE TEAM PROJECT PROCEDURE FOR QA/QC ISSUE-SPECIFIC ACTION PLANS C0W100 E3 C>
CHANGE NOTICE NO: 001 i
CONTROL NO DF-cai PROCEDURE NO: CPP-001 REVISION NO:
2 ISSUE DATE: 02/18/86 O
PREPARATION OF PROJECT PROCEDURES AFD QUALITY INSTRUCTIONS The CPP identified above is hereby changed as shown on the attached page of this notice.
Prepared by:
W' I I!W Date:
d!//![d Approved by:
__.,, b gC,'adev Dates On-Site QA Represe tive 2!/'db Approved by:
)
- A Date:
QA/QCReviewTeamLgader
//
0607170031 060711 PDH ADOCK 0b000445 A
PDH
Ch:ng2 Notico 001 i
CPP-001 Revision:
2 1.-
Change Section 5.3.1, first paragraph to read:
"The Records Administrator assigns the issue date, updates the l'
appropriate index and makes controlled distribution of each CPP and QI via a transmittal. The transmittal notes when, due to extensive revision, changes are not indicated.
(Refer to Section 5.4.)"
1 i,
5 l
i
!O 1
i e
i 1
i I
i i
a ii
\\
lO l
i 2
1
-