ML20202J143

From kanterella
Jump to navigation Jump to search
Change Notice 001 to Rev 2 to Procedure CPP-001, Preparation of Project Procedures & Quality Instructions
ML20202J143
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 02/11/1986
From: Bajada E
EVALUATION RESEARCH CORP.
To:
Shared Package
ML20202J051 List: ... further results
References
CPP-001-01, CPP-1-1, NUDOCS 8607170031
Download: ML20202J143 (2)


Text

s 1

PC83 1 cf 2

(

EVALUATION RESEARCH CORPORATION t,

COMANCHE PEAK RESPONSE TEAM PROJECT PROCEDURE FOR QA/QC ISSUE-SPECIFIC ACTION PLANS C0W100 E3 C>

CHANGE NOTICE NO: 001 i

CONTROL NO DF-cai PROCEDURE NO: CPP-001 REVISION NO:

2 ISSUE DATE: 02/18/86 O

PREPARATION OF PROJECT PROCEDURES AFD QUALITY INSTRUCTIONS The CPP identified above is hereby changed as shown on the attached page of this notice.

Prepared by:

W' I I!W Date:

d!//![d Approved by:

__.,, b gC,'adev Dates On-Site QA Represe tive 2!/'db Approved by:

)

- A Date:

QA/QCReviewTeamLgader

//

0607170031 060711 PDH ADOCK 0b000445 A

PDH

Ch:ng2 Notico 001 i

CPP-001 Revision:

2 1.-

Change Section 5.3.1, first paragraph to read:

"The Records Administrator assigns the issue date, updates the l'

appropriate index and makes controlled distribution of each CPP and QI via a transmittal. The transmittal notes when, due to extensive revision, changes are not indicated.

(Refer to Section 5.4.)"

1 i,

5 l

i

!O 1

i e

i 1

i I

i i

a ii

\\

lO l

i 2

1

-