ML20202J339
| ML20202J339 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 02/10/1986 |
| From: | Popper S, Ross G EVALUATION RESEARCH CORP. |
| To: | |
| Shared Package | |
| ML20202J051 | List:
|
| References | |
| QI-063, QI-63, NUDOCS 8607170062 | |
| Download: ML20202J339 (2) | |
Text
.
Pcg2 1 of 2 s.
O EVALUATION RESEARCH CORPORATION CONTROUED COPY COMANCHE PEAK RESPONSE T QUALITY INSTRUCTION FOR ISSUE-SPECIFIC ACTION PLAN ISAP VII.b.4 CHANGE NOTICE: 001 Chfr h((hh(h((
INSTRUCTION NO.: QI-063 CONTii0i_ N0nor=-oo; REVISION NO.:
1 ISSUE DATE: 2/10/86 REINSPECTION OF TORQUE FOR DRILLED-IN CONCRETE EXPANSION ANCHORS (HILTI BOLTS)
The QI identified above is hereby changed as shown on the attached page of this notice.
l Prepared by:
hx Date: J2 8d Issue Coordina(of ~
7[7/86 Approved by: /
M f. _
Date:
HardpreSupervisor gM Date:
8-/[*[h Approved by:
~
On-Site QA Representative O
1 / o !# (,
Approved by:
Date:
QA(fQC Review Team Lehder
/
/
8607170062 860711 PDR ADOCK 05000445 A
e Chengs Notica 001 QI-063
(
Rev. 1 i
1.
Revise 5.5 to read:
" Verify bolt torque satisfies the acceptance value, 11ft-lb, given in Table II of Attachment 6.2 using a calibrated dial indicating torque wrench...."
I 1
1 i
!O I
l i
l i
i i
2 j
I
-.-c--.,----.,,..-.
.