ML20211M004

From kanterella
Jump to navigation Jump to search
Rev 31 to Technical Requirements Manual
ML20211M004
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 08/05/1999
From:
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
Shared Package
ML20211L991 List:
References
PROC-990805, NUDOCS 9909090024
Download: ML20211M004 (8)


Text

_-

l*

Turbine Overspeed Protection TR 13.3.33 SURVEILLANCE REQUIREMENTS NOTE The provisions of TRS 13.0.4 are not applicable.'

SURVEILLANCE FREQUENCY TRS 13.3.33.1 Test the two mechanical overspeed devices using the 14 days Automatic Turbine Tester or manual test.

YRS 13.3.33.2 Cycle each of the following valves through at least 12 weeks 31 one complete cycle from the running position using the manual test or Automatic Turbine Tester (ATT).

j

a. Four high pressure turbine stop valves,
b. Four high pressure turbine control valves, I
c. Four low pressure turbine stop valves, and
d. Four low pressure turbine control valves, s

TRS 13.3.33.3 Direct observation of the movement of each of the 12 weeks 31 above valves (TRS 13.3.33.2) through one complete cycle from the running position.

TRS 13.3.33.4 Disassemble at least one high pressure turbine stop 40 months valve and one high pressure control valve and perform a visual and surface inspection of valve seats, disks and stems and verify no unacceptable flaws are found. If unacceptable flaws are found, all other valves of that type shall be inspected, j

(continued) 9909090024 990903 PDR ADOCK 05000445 P

PDR

' CPSES - UNITS 1 AND 2 -TRM 13.3-24 Revision 31 - August 5,1999

r.

/.

~ '

COMANCHE PEAK ELECTRIC STATION UNITS 1 & 2 TECHNICAL REQUIREMENTS MANUAL (TRM)

EFFECTIVE PAGE LISTING Revision Record:

Original _

September 15,1989 Submitted July 21,1989 Revision 1 Revision 2 January 15,1990 Revision 3 ~

July 20,1990 Revision 4 April 24,1991 '

Revision 5-September 6,1991 Revision 6 November 22,1991

. Revision 7 March 18,1992 Revision 8 June 30,1992 Revision 9 December 18,1992 Revision 10 January 22,1993 Revision 11 February 3,1993 l:

Revision 12 July 15,1993 Revision 13 September 14,1993 Revision 14 November 30,1993 Revision 15' April 15,1994 Revision 16 -

May 11,1994 Revision 17 February 24,1995 Revision 18 April 14,1995 -

Revision 19 May 15,1995 Revision 20 June 30,1995 le Revision 21 January 24,1996 Revision 22 February 24,1997 l

Revision 23 March 13,1997 Revision 24 June 26,1997 Revision 25 July 31,1997 Revision 26 February 24,1998 Revision 27 April 14,1999

' Revision 28 April 16,1999 Revision 29 July 27,1999

' Revision 30 July 27,1999 l

Revision 31 August 5,1999 I

i l

1.

CPSES - UNITS 1 AND 2-TRM EPL-1 August 5,1999 i

l

p g.

L' COMANCHE PEAK ELECTRIC STATION UNITS 1 & 2 TECHNICAL REQUIREMENTS MANUAL (TRM)

EFFECTIVE PAGE LISTING TRM-TAB '

Original Record of Changes July 27,1999 L

.TRM - Title Page July 27,1999 l

1.

July 27,1999 l

il July 27,1999 l

.11.0-1 Revision 29 l

13.0-1 Revision 29 13.0-2 Revision 29 13.1-1 Revision 29 13.1 Revision 29 13.1-3 Revision 29 13.1-4 Revision 29 13.1-5 Revision 29 13.1-6 Revision 29 13.1-7 Revision 29 13.1-8 Revision 29 13.1-9 Revision 29 13.1-10 Revision 29 Revision 29 -

13.1-11 13.1-12 Revision 29 13.1-13' Revision 29 13.1-14 Revision 29 13.1-15 Revision 29 13.1-16 Revision 29 13.1-17 Revision 29 13.1-18 Revision 29 13.1-19 Revision 29 13.1-20 Revision 29 13.1-21 Revision 29 13.1-22 Revision 29 13.1-23 Revision 29

-13.1-24 Revision 29 l

-13.2-1 Revision 29 13.2-2 Revision 29 i~

'13.2-3 Revision 29 L

13.2-4 Revision 29 13.2-5 Revision 29 13.3-1 Revision 29

)

g 13.3-2 Revision 29 l

13.3-3 Revision 29 I

13.3-4 Revision 29 l

13.3-5 Revision 29 13.3-6 Revision 29 13.3-7 Revision 29 l

13.3-8 Revision 29 13.3-9 Revision 29

' CPSES - UNITS 1 AND 2 - TRM EPL-2 August 5,1999

]

COMANCHE PEAK ELECTRIC STATION UNITS 1 & 2 TECHNICAL REQUIREMENTS MANUAL (TRM)

EFFECTIVE PAGE LISTING 13.3-10 Revision 29 13.3-11 Revision 29 13.3-12 Revision 29 13.3 Revision 29

-13.3-14 Revision 29 13.3-15 Revision 29 13.3-16 Revision 29 13.3-17 Revisica 29 13.3-18 Revision 29 13.3-19 Revision 29 13.3-20 Revision 30 13.3-21 Revision 29 13.3-22 Revision 29 13.3-23 Revision 29 13.3-24 Revision 31 13.3 Revision 29 13.4-1 Revision 29 13.4-2 Revision 29 13.4-3 Revision 29 4

13.4-4 Revision 29 13.4-5 Revision 29 13.4-6 Revision 29 13.4-7 Revision 29 13.4-8 Revision 29 13.4-9 Revision 29 13.4-10 Revision 29 13.4-11 Revision 29 13.4-12 Revision 29 13.5-1

- Revision 29 13.5-2 Revision 29 13.5-3 Revision 29 13.5-4 Revision 29 1

13.6-1 Revision 29

)

13.6-2 Revision 29 13.6-3 Revision 29 13.6-4 Revision 29 i

13.6-5 Revision 29 13.6-6 Revision 29 i

13.6-7 Revision 29 I

13.6-8 Revision 29 13.6-9 Revision 29 13.6-10 Revision 29 13.6-11 Revision 29 13.6-12 Revision 29 13.6-13 Revision 29 13.6-14 Revision 29 CPSES - UNITS 1 AND 2-TRM EPL-3 August 5,1999 l

COMANCHE PEAK ELECTRIC STATION UNITS 1 & 2 TECHNICAL REQUIREMENTS MANUAL (TRM)

EFFECTIVE PAGE LISTING 1

13.6-15 Revision 29 13.6-16 Revision 29 13.7-1 Revision 29 13.7-2 Revision 29 13.7-3 Revision 29 13.7-4 Revision 29 13.7-5 Revision 29 13.7-6 Revision 29 13.7-7 Revision 29 13.7-8 Revision 29 13.7-9 Revision 30 13.7-10 July 27,1999 13.7-11 Revision 30 13.7-12 July 27,1999 13.7-13 Revision 29 13.7-14 Revision 29 13.7-15 Revision 29 13.7-16 Revision 29 13.7-17 Revision 29 13.7-18 Revision 29 13.7-19 Revision 29 13.7-20 Revision 29 13.7-21 Revision 29 13.7-22 Revision 29 13.7-23 Revision 29 13.7-24 Revision 29 13.7-25 Revision 29 13.7-26 Revision 29 13.7-27 Revision 29 13.7-28 Revision 29 13.7 29 Revision 29 13.7-30 Revision 29 j

13.7-31 Revision 29

)

13.8-1 Revision 29 j

13.8-2 Revision 29 13.8-3 Revision 29 13.8-4 Revision 29 13.8-5 Revision 29 13.8-6 Revision 29 13.8-7 Revision 29 13.8-8 Revision 29 13.8-9 Revision 29 13.8-10 Revision 29 13.8-11 Revision 29 13.8-12 Revision 29 13.8-13 Revision 29 CPSES -UNITS 1 AND 2-TRM EPL-4 August 5,1999

COMANCHE PEAK ELECTRIC STATION UNITS 1 & 2 TECHNICAL REQUIREMENTS MANUAL (TRM)

EFFECTIVE PAGE LISTING 13.8-14 Revision 29 13.8-15.

. Revision 29 13.8-16 Revision 29 13.8-17 Revision 29 13.8-18 Revbion 29 13.8-19 Revision 29 13.8-20 Revision 29 13.8 Revision 29

.p.

13.8-22 Revision 29 13.8-23 Revision 29 13.8-24 Revision 29 13.8-25 Revision 29

.13.8-26 Revision 29 13.8-27 Revision 29 13.8-28 Revision 29 13.8-29 Revis'on 29 13.8-30 Revision 29 13.8-31 Revision 29 13.8-32 Revision 29 13.8-33 Revision 29 13.8-34 Revision 29 13.9-1 Revision 29 13.9-2 Revision 29

-13.9-3 Revision 29 13.9-4 Revision 29 13.9-5 Revision 29 13.9-6 Revision 29 13.9-7 Revision 30 13.10-1 Revision 29 13.10-2 Revision 30 13.10-3 Revision 29 13.10 Revision 29 13.10-5 Revision 29 13.10-6 Revision 29 13.10-7 Revision 29 l

13.10-8 Revision 29 13.10-9 Revision 29 l

13.10-10 Revision 29 l

15.0-1 Revision 29 15.0-2 Revision 29 15.0-3 Revision 20 15.0-4 Revision 29 15.0-5 Revision 29 15.0-6 Revision 29 15.0-7 Revision 29 15.0-8 Revision 29 CPSES - UNITS 1 AND 2-TRM EPL-5 August 5,1999 l

COMANCHE PEAK ELECTRIC STATION UNITS 1 & 2 TECHNICAL REQUIREMENTS MANUAL (TRM) l EFFECTIVE PAGE LISTING l

TRM Bases -Title Page July 27,1999 Bi July 27,1999 B li July 27,1999 8 13.0-1 Revision 29 8 13.1-1 Revision 29 8 13.1-2 Revision 29 8 13.1-3 Revision 29 B 13.1-4 Revision 29 B 13.1-5 Revision 29 B 13.1-6 Revision 29 B 13.1-7 Revision 29 B 13.1-8 Revision 29 B 13.1-9 Revision 29 B 13.1-10 Revision 29 B 13.2-1 Revision 29 B 13.2-2 Revision 29 B 13.2-3 Revision 29 B 13.3-1 Revision 29 B 13.3-2 Revision 29 B 13.3-3 Revision 29 8 13.3-4 Revision 29 B 13.3-5 Revision 29 B 13.3-6 Revision 29 8 13.4-1 Revision 29 B 13.4-2 Revision 29 B 13.4-3 Revision 29 B 13.4-4 Revision 29 l

B 13.4-5 Revision 29 B 13.4-6 Revision 29 B 13.5-1 Revision 29 8 13.5-2 Revision 29 B 13.6-1 Revision 29 B 13.6-2 Revision 29 8 13.6-3 Revision 29 B 13.7-1 Revision 29 8 13.7-2 Revision 29 B 13.7-3 Revision 29 8 13.7-4 Revision 29 l

B 13.7-5 Revision 29 i

B 13.74 Revision 29 i

B 13.7-7 Revision 29 B 13.7-8 Revision 29 i

l B 13.7-9 Revision 29 B 13.7-10 Revision 29 i

B 13.7-11 Revision 29 B 13.8-1 Revision 29 i

CPSES -UNITS 1 AND 2-TRM EPL-6 August 5,1999 l

COMANCHE PEAK ELECTRIC STATION UNITS 1 & 2 TECHNICAL REQUIREMENTS MANUAL (TRM)

EFFECTIVE PAGE LISTING B 13.8-2 Revision 29 B 13.9-1 Revision 29 8 13.9-2 Revision 29 B 13.9-3 Revision 29 B 13.9-4 Revision 29 8 13.9-5 Revision 29 8 13.9-6 Revision 29 8 13.10-1 Revision 29 B 13.10-2 Revision 29 B 13.10-3 Revision 29 B 13.10-4 Revision 29 EPL-1 August 5,1999 EPL-2 August 5,1999 EPL-August 5,1999 EPL-4 August 5,1999 EPL-5 August 5,1999 EPL-6 August 5,1999 EPL-7 August 5,1999 CPSES - UNITS 1 AND 2 - TRM EPL-7 August 5,1999

..